Project · Gujarat
Arihant Gold Plast – Sarigam: 274 kWp metal sheet rooftop solar in Gujarat
Generating since Sep 2022. Arihant Gold Plast bought the plant under CAPEX and owns it.
- Capacity
- 274 kWp
- Installation
- Metal sheet roof
- Location
- Sarigam, Gujarat
- Finance model
- CAPEX
Plant details
- Client
- Arihant Gold Plast
- Industry
- Polymer
- Capacity
- 274 kWp (DC), with 200 kW (AC) of inverters
- Service
- EPC + O&M
- Commissioned
- Sep 2022
- Status
- Operational. Built and maintained by Adhvanik Energy; owned by the client.
274 kWp is mid-sized for the list, enough to span a production hall or two. The array is 37% larger than the inverters, a DC/AC ratio of 1.37.
Since Sep 2022, the plant in Sarigam has run through several monsoons. That history is the first thing an O&M review reads. Its first weeks, in Sep 2022, were monsoon weeks.
Closest in capacity on the list: MTC – Pune (270 kWp, Maharashtra). Its nearest neighbour in Gujarat, in order of commissioning, is HUL – Kandla.
On the location pages: Gujarat. See it in the projects index.
Engineering
How a 274 kWp plant is put together
Putting 274 kWp on sheet means respecting a roof built to keep rain out and carry little else. The rails spread the array's weight across several purlins, and the design is checked against wind uplift for the site.
Edge protection, lifelines and fixed walkways are part of the design, because crews work on a surface not built for foot traffic. The same arrangements serve the cleaning team for as long as a 274 kWp plant runs.
On Asset Connect, a 274 kWp plant is read month on month: generation, irradiance and fault alerts, with performance ratio showing whether soiling or a fault is costing units.
Finance model
How the plant is paid for
CAPEX is the model where the client buys the plant. For Arihant Gold Plast – Sarigam, that means the 274 kWp system is the client's property since Sep 2022, with the savings and the upkeep decisions on the client's side.
After handover, the owner placed day-to-day care of the plant with our O&M team under contract.
Sarigam
Polymer plants in Gujarat
- Solar resource here
- 1,930 kWh/m² a yearAbout 1,614 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Sarigam; a roof plant at roof tilt differs.
- Capacity range
- 250 to 500 kWp274 kWp here. 36 plants on our list are in this range.
- Type of installation
- Metal sheet roofThe most common factory roof.
- Finance option
- CAPEXThe factory owns the plant from day one.
We list 2 plants in Sarigam, and Arihant Gold Plast – Sarigam is one of them. The named sectors are packaging and printing; polymer.
Gujarat has 12 projects on the list, across 7 towns. By roof, 11 on metal sheet roofs and 1 on RCC.
Extrusion and moulding run for long shifts and draw steady power, which gives a solar plant a dependable daytime load.
Heat from the process can raise roof temperature, so the roof assessment looks at sheet condition and at ventilators close to the array.
Sector page: Plastics & polymers solar. Rules for Gujarat: solar policy.
Projects
More plants near Sarigam
Also in Sarigam
- Shrotra Enterprises – Sarigam1,300 kWp · Metal sheet roof · Aug 2025
Elsewhere in Gujarat
- MYK Laticrete – Vadodara450 kWp · Metal sheet roof · Sep 2026
- Zeeta Electrical – Sanand519 kWp · Metal sheet roof · Aug 2026
- West Coast – Surat, 162 kWpMetal sheet roof · Jun 2026
- Terex – Gujarat352 kWp · Metal sheet roof · Mar 2025
Other plants on metal sheet roofs
- Blink Infra – Selaqui332 kWp · Metal sheet roof · Dec 2025
- Marico – Jalgaon517 kWp · Metal sheet roof · Dec 2025
- Britannia – Bihta1,600 kWp · Metal sheet roof · Nov 2025
- Britannia – Hajipur1,050 kWp · Metal sheet roof · Oct 2025
Common questions
The Arihant Gold Plast – Sarigam plant: questions and answers
Is 274 kWp the module or the inverter size at the plant?
The Arihant Gold Plast plant has 274 kWp of modules (DC) feeding 200 kW of inverters (AC). Modules are quoted in kWp and inverters in kW. That is 37% more module capacity than inverter capacity (ratio 1.37), a normal design choice.
What roof is this Sarigam plant built on?
The list records a metal sheet roof. On sheet the structure is fixed through the sheet or, for a zero-leakage roof, held by clamps or adhesive, and it is designed for the wind speed under IS 875.
Does Adhvanik Energy work near Sarigam?
Yes. 2 plants are listed for Sarigam, among 12 in Gujarat. The free 7-day feasibility study needs only your town and a typical monthly bill.
Guides and glossary
Guides and terms behind a 274 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Behind-the-meter or net metering: which suits your site?Read the guide
Terms used on this page
Free feasibility study
Want a 274 kWp plant on your own site?
A 274 kWp plant is one data point. The free 7-day study gives you the numbers for your own site.