Project · O&M only · Haryana

ArcelorMittal Nippon Steel – Bahadurgarh: 600 kWp solar plant in Haryana, maintained by Adhvanik

Another company built this plant in Bahadurgarh. Adhvanik Energy's O&M team now keeps it running for ArcelorMittal Nippon Steel. It is one of 2 ArcelorMittal Nippon Steel plants on our project list.

600 kWp solar plant at ArcelorMittal Nippon Steel in Bahadurgarh, Haryana
Capacity
600 kWp
Installation
Metal sheet roof
Location
Bahadurgarh, Haryana
Service
O&M only

Plant details

Client
ArcelorMittal Nippon Steel
Industry
Steel & Metals
Capacity
600 kWp (DC), with 500 kW (AC) of inverters
Commissioned
Oct 2024
Status
Built by another company. Adhvanik Energy maintains it. O&M only

A 600 kWp plant needs a big roof or plot, and its structural check, shade analysis and connection point take longer than a small plant's. Its 600 kWp of modules feed 500 kW of inverters, a DC/AC ratio of 1.20.

With a commissioning month of Oct 2024, the plant has a year or more of readings, enough to compare each month with the same month a year earlier. Oct 2024 falls as the monsoon ends.

Closest in capacity on the list: Akome Life Care – Haridwar (600 kWp, Uttarakhand). MDB Chemicals – Jalgaon (176 kWp, Maharashtra) and AQ Inductive Components – Pune (400 kWp, Maharashtra) were also commissioned in Oct 2024.

On site

4 photos and a video clip from the plant. Select one to enlarge.

O&M

What taking over a plant involves

ArcelorMittal Nippon Steel – Bahadurgarh was built by another company. Taking over its maintenance makes our O&M team the single party accountable for its output, with the plant on Asset Connect.

A plant that has drifted shows it in performance ratio: soiling, a failed string or an inverter fault each take a share of output. Asset Connect puts that number in front of our engineers every month.

On Asset Connect, a 600 kWp plant is read month on month: generation, irradiance and fault alerts, with performance ratio showing whether soiling or a fault is costing units.

Finance model

How the plant is paid for

Neither CAPEX nor a PPA applies to us at the plant. The plant has its own history, and our contract is an AMC for keeping it generating.

Handing an existing plant to us means one team accountable for its output, with scope and guarantees set in the contract.

Bahadurgarh

Where ArcelorMittal Nippon Steel – Bahadurgarh sits on our list

Solar resource here
1,739 kWh/m² a yearAbout 1,491 kWh per kWp a year for a standard tilted system; January is the weakest month. Global Solar Atlas estimate for Bahadurgarh; a roof plant at roof tilt differs.
Capacity range
500 to 1,000 kWp600 kWp here. 38 plants on our list are in this range.
Type of installation
Metal sheet roofThe most common factory roof.
Service
O&M onlyOne team accountable for output, with a monthly report.

The ArcelorMittal Nippon Steel plant is the only Bahadurgarh plant on our list.

Across Haryana our list holds 5 plants in 3 towns, commissioned between 2024 and 2025.

Steel and metal works run heavy machinery with high loads, and a solar plant covers a part of the daytime demand.

Check the structure first, since heavy cranes and tall bays decide where a plant can go.

Projects

More plants near Bahadurgarh

Elsewhere in Haryana

Other plants we maintain but did not build

Common questions

The ArcelorMittal Nippon Steel – Bahadurgarh plant: questions and answers

Is 600 kWp the module or the inverter size at this Bahadurgarh plant?

The plant carries 600 kWp of modules and 500 kW of inverter capacity. kWp is the module rating at test conditions, and kW (AC) is what the inverters can deliver. The modules exceed the inverter rating by about 20%, a DC/AC ratio of 1.20.

What does the roof mean for the 600 kWp plant at Bahadurgarh?

Metal sheet, per the list. On a roof like that the mounting is chosen per roof, and sheet condition is checked before any module goes on.

Do you build plants in Haryana?

Yes. One plant is listed for Bahadurgarh, among 5 in Haryana. The free 7-day feasibility study needs only your town and a typical monthly bill.

Free feasibility study

Want a 600 kWp plant on your own site?

Tell us the roof type and last year's bills. An engineer gets back within 48 hours. The 7-day feasibility study costs nothing.

Call us+91 22 4618 3484Get a free feasibility study