Project · Dadra and Nagar Haveli and Daman and Diu

Sterlite – Silvassa: 249 kWp metal sheet rooftop solar in Dadra and Nagar Haveli and Daman and Diu

Generating since May 2026. Adhvanik Energy owns and runs it, and Sterlite pays for each unit the plant generates, under a PPA. It is one of 2 Sterlite plants on our project list.

Capacity
249 kWp
Installation
Metal sheet roof
Location
Silvassa, Dadra and Nagar Haveli and Daman and Diu
Finance model
PPA / OPEX

Plant details

Client
Sterlite
Capacity
249 kWp (DC), with 200 kW (AC) of inverters
Service
EPC + O&M
Commissioned
May 2026
Status
Operational. Owned and run by Adhvanik Energy.

A 249 kWp plant sits in the middle of the range we list: several inverters, on one site's roofs. The array is 25% larger than the inverters, a DC/AC ratio of 1.25.

Sterlite – Silvassa has been running only since May 2026. The early question is whether output matches the design. May 2026 falls in the hot season.

For scale, the nearest match in capacity is Samruddhi Industries – Samadhan Industries, Maharashtra (250 kWp, Maharashtra). Blink Infra – Gaddipur (250 kWp, Uttar Pradesh) and DP Chocolates – Varadaiahpalem (490 kWp, Andhra Pradesh) were also commissioned in May 2026. In Dadra and Nagar Haveli and Daman and Diu, in order of commissioning, Dabur – Silvassa comes before it and Sterlite – Silvassa, 500 kWp after.

Engineering

How a 249 kWp plant is put together

Metal sheet is a light roof, and a 249 kWp array adds weight and wind load to purlins that were sized for the sheet alone. On a roof like this one in Silvassa, a structural engineer confirms the roof can take the load, and the structure is designed for the wind speed under IS 875.

Edge protection, lifelines and fixed walkways are part of the design, because crews work on a surface not built for foot traffic. The same arrangements serve the cleaning team for as long as a 249 kWp plant runs.

On Asset Connect, a 249 kWp plant is read month on month: generation, irradiance and fault alerts, with performance ratio showing whether soiling or a fault is costing units.

Finance model

How the plant is paid for

A PPA moves the capital cost to us. The client at the plant has had a solar supply since May 2026, with the cost arriving as a per-unit charge on what the plant supplies.

A PPA keeps the client's capital free for the factory itself; its cost is the tariff on the units the plant generates.

Silvassa

Where Sterlite – Silvassa sits on our list

Solar resource here
1,899 kWh/m² a yearAbout 1,583 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Silvassa; a roof plant at roof tilt differs.
Capacity range
Under 250 kWp249 kWp here. 33 plants on our list are in this range.
Type of installation
Metal sheet roofThe most common factory roof.
Finance option
PPA / OPEXNo capital from the factory: it pays per unit generated.

Besides the Sterlite plant, our list has 2 other plants in Silvassa. Its one named sector is FMCG.

The Silvassa area page lists 3 plants, with a link to each.

In Dadra and Nagar Haveli and Daman and Diu the list shows 7 projects in 2 towns. Named sectors include polymer and FMCG.

Projects

More plants near Silvassa

Also in Silvassa

Elsewhere in Dadra and Nagar Haveli and Daman and Diu

Other plants on metal sheet roofs

Common questions

The Sterlite – Silvassa plant: questions and answers

What does 249 kWp mean for this Silvassa plant?

The plant carries 249 kWp of modules and 200 kW of inverter capacity. kWp is the module rating at test conditions, and kW (AC) is what the inverters can deliver. As a ratio that is 1.25: the array is rated above the inverters, which cap what the plant can feed the site at any moment.

What does the roof mean for the 249 kWp plant at Silvassa?

Metal sheet, per the list. On a roof like that the mounting is chosen per roof, and sheet condition is checked before any module goes on.

Does Adhvanik Energy work near Silvassa?

Yes. 3 plants are listed for Silvassa, among 7 in Dadra and Nagar Haveli and Daman and Diu. The free 7-day feasibility study needs only your town and a typical monthly bill.

Free feasibility study

Find out what your sheds can carry

Tell us the roof type and last year's bills. An engineer gets back within 48 hours. The 7-day feasibility study costs nothing.

Call us+91 22 4618 3484Get a free feasibility study