Project · Dadra and Nagar Haveli and Daman and Diu
Dabur – Silvassa: 937 kWp metal sheet rooftop solar in Dadra and Nagar Haveli and Daman and Diu
Adhvanik Energy owns and runs it, and Dabur pays for each unit the plant generates, under a PPA. The plant has supplied the site since Apr 2026. It is one of 5 Dabur plants on our project list.

- Capacity
- 937 kWp
- Installation
- Metal sheet roof
- Location
- Silvassa, Dadra and Nagar Haveli and Daman and Diu
- Finance model
- PPA / OPEX
This plant at a glance
- Client
- Dabur
- Industry
- FMCG
- Capacity
- 937 kWp (DC), with 700 kW (AC) of inverters
- Service
- EPC + O&M
- Commissioned
- Apr 2026
- Status
- Operational. Owned and run by Adhvanik Energy.
937 kWp puts this Silvassa plant in the larger group on the list, usually with several inverters sharing the load. Its 937 kWp of modules feed 700 kW of inverters, a DC/AC ratio of 1.34.
Commissioned in Apr 2026, the plant is recent. Its early months set the performance-ratio baseline. Apr 2026 put its first months in the hot, dusty season.
The plant closest to it in size on our list is FUSO Glass – Murbad (926 kWp, Maharashtra). Of the Dadra and Nagar Haveli and Daman and Diu plants on our list, Ronch Polymer – Daman, 173 kWp was commissioned just before it and Sterlite – Silvassa, 249 kWp just after.
More on the area: Daman and Silvassa · Silvassa. It is also listed in the full project list.
On site
5 photos and a video clip from the plant. Select one to enlarge.
Engineering
How a 937 kWp plant is put together
For the metal sheet roof at the plant, the starting point is the sheet itself: its make, profile, thickness and age. Those four facts tell the engineer whether clamps or adhesive fit, and how many years of life the roof has left under the array.
Shadows on a shed roof come from ridge monitors, ventilators and neighbouring buildings. The layout for a plant like the Dabur plant is drawn with those in place, so no row loses output to a shadow that was visible on the first day.
On Asset Connect, a 937 kWp plant is read month on month: generation, irradiance and fault alerts, with performance ratio showing whether soiling or a fault is costing units.
Finance model
How the plant is paid for
The plant gets its solar through a PPA: 937 kWp on its site, owned by Adhvanik Energy and paid for per unit generated, at the tariff in the contract.
Because we own the plant, we carry its performance: our O&M team runs it, and its output is what the contract is priced on. PPAs run 5 to 25 years.
Silvassa
Where Dabur – Silvassa sits on our list
- Solar resource here
- 1,899 kWh/m² a yearAbout 1,583 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Silvassa; a roof plant at roof tilt differs.
- Capacity range
- 500 to 1,000 kWp937 kWp here. 38 plants on our list are in this range.
- Type of installation
- Metal sheet roofThe most common factory roof.
- Finance option
- PPA / OPEXNo capital from the factory: it pays per unit generated.
Besides the Dabur plant, our list has 2 other plants in Silvassa. The sector named there is FMCG.
The Silvassa area page lists 3 plants, with a link to each.
Across Dadra and Nagar Haveli and Daman and Diu our list holds 7 plants in 2 towns, commissioned between 2024 and 2026.
FMCG sites tend to run packing and dispatch in daylight hours, which lines up with when a solar plant generates.
Warehouses and packing halls give long runs of clear roof, which keeps the array simple.
Sector page: FMCG solar.
Projects
Related plants
Also in Silvassa
- Sterlite – Silvassa, 500 kWpMetal sheet roof · Jun 2026
- Sterlite – Silvassa, 249 kWpMetal sheet roof · May 2026
Elsewhere in Dadra and Nagar Haveli and Daman and Diu
- Ronch Polymer – Daman, 478 kWpMetal sheet roof · Dec 2024
Other plants on metal sheet roofs
- Ginni Gopal – Boisar104 kWp · Metal sheet roof · Jan 2023
- Arihant Gold Plast – Sarigam274 kWp · Metal sheet roof · Sep 2022
- Lemken – Nagpur477 kWp · Metal sheet roof · Jul 2022
- Arihant Auto – Aurangabad162 kWp · Metal sheet roof · May 2022
Common questions
Questions about Dabur – Silvassa
What is the commissioning date of the Dabur – Silvassa plant?
Apr 2026. That is when the 937 kWp plant in Silvassa began supplying the site, and the generation record runs from then.
Who owns the Dabur – Silvassa plant?
We do. This Silvassa plant is a PPA / OPEX plant, so Adhvanik Energy owns it, operates it and maintains it, and the host site pays per unit generated.
Could a plant like the plant fit my factory?
It depends on the roof or land, the load and the connection. The free 7-day feasibility study includes a roof feasibility check, the area available for installation and a financial ROI sheet for your site.
Guides and glossary
Guides and terms behind a 937 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Behind-the-meter or net metering: which suits your site?Read the guide
Terms used on this page
Free feasibility study
Find out what your sheds can carry
The free 7-day study gives a site in Silvassa an ROI sheet, a policy check, roof feasibility and a budgetary quote. Expect an engineer within 48 hours.