Project · Dadra and Nagar Haveli and Daman and Diu
Sterlite – Silvassa: 500 kWp metal sheet rooftop solar in Dadra and Nagar Haveli and Daman and Diu
Adhvanik Energy owns and runs it, and Sterlite pays for each unit the plant generates, under a PPA. The plant has supplied the site since Jun 2026. It is one of 2 Sterlite plants on our project list.
- Capacity
- 500 kWp
- Installation
- Metal sheet roof
- Location
- Silvassa, Dadra and Nagar Haveli and Daman and Diu
- Finance model
- PPA / OPEX
This plant at a glance
- Client
- Sterlite
- Capacity
- 500 kWp (DC), with 375 kW (AC) of inverters
- Service
- EPC + O&M
- Commissioned
- Jun 2026
- Status
- Operational. Owned and run by Adhvanik Energy.
At 500 kWp, this Silvassa plant covers a sizeable share of a factory roof, usually split across a few inverters. Its 500 kWp of modules feed 375 kW of inverters, a DC/AC ratio of 1.33.
Commissioned in Jun 2026, the plant is recent. Its early months set the performance-ratio baseline. Jun 2026 was a monsoon month, so early output ran under cloud.
The plant closest to it in size on our list is Natural Living – Pithampur (500 kWp, Madhya Pradesh). Jun 2026 also saw Samruddhi Industries – Samadhan Industries, Maharashtra (250 kWp, Maharashtra) and Siddhi Vinayak Flexipack – Indore (515 kWp, Madhya Pradesh) commissioned. Its nearest neighbour in Dadra and Nagar Haveli and Daman and Diu, in order of commissioning, is Sterlite – Silvassa, 249 kWp.
On the location pages: Daman and Silvassa · Silvassa. It is also listed in the full project list.
Engineering
The engineering behind a plant like Sterlite – Silvassa
The 500 kWp at the Sterlite plant sits on metal sheet roofing. In many cases the structure is fixed through the sheet; where the owner wants a zero-leakage roof, the mounting is non-penetrating, with clamps that grip the ribs or seams or adhesive bonding of the rails.
On a long shed, a short, tidy cable route on trays, from array to inverters to LT panel, saves losses and maintenance time over the life of the plant.
Most losses at a working plant are small and gradual, such as a loose connector, built-up dust or a midday inverter trip, and monitoring and inspection find them early.
Finance model
Who owns the plant, and who runs it
Under a PPA the client buys electricity from a plant we own. The tariff per unit is set in the contract, and the client pays only for the units the plant generates.
RESCO is the industry's name for this arrangement: a renewable energy service company that owns and operates the plant.
Silvassa
The area around Sterlite – Silvassa
- Solar resource here
- 1,899 kWh/m² a yearAbout 1,583 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Silvassa; a roof plant at roof tilt differs.
- Capacity range
- 500 to 1,000 kWp500 kWp here. 38 plants on our list are in this range.
- Type of installation
- Metal sheet roofThe most common factory roof.
- Finance option
- PPA / OPEXNo capital from the factory: it pays per unit generated.
We list 3 plants in Silvassa, and the plant is one of them. The sector named there is FMCG.
The Silvassa area page lists 3 plants, with a link to each.
Across Dadra and Nagar Haveli and Daman and Diu our list holds 7 plants in 2 towns, commissioned between 2024 and 2026.
Sector pages: industries we work with.
Projects
Other plants on the list
Also in Silvassa
- Sterlite – Silvassa, 249 kWpMetal sheet roof · May 2026
- Dabur – Silvassa937 kWp · Metal sheet roof · Apr 2026
Elsewhere in Dadra and Nagar Haveli and Daman and Diu
- Ronch Polymer – Daman, 478 kWpMetal sheet roof · Dec 2024
Other plants on metal sheet roofs
- Blink Infra – Sarai Sahjadi300 kWp · Metal sheet roof · Jun 2026
- Blink Infra – Bhokapur125 kWp · Metal sheet roof · Jun 2026
- Natural Living – Pithampur500 kWp · Metal sheet roof · Jun 2026
- West Coast – Surat, 162 kWpMetal sheet roof · Jun 2026
Common questions
Questions about the plant
What is the commissioning date of the Sterlite – Silvassa plant?
The Sterlite plant was commissioned in Jun 2026 and has supplied the site since then. Its early months set the performance-ratio baseline.
Who owns the Sterlite – Silvassa plant?
We do. This Silvassa plant is a PPA / OPEX plant, so Adhvanik Energy owns it, operates it and maintains it, and the host site pays per unit generated.
Could a plant like the plant fit my factory?
It depends on the roof or land, the load and the connection. The free 7-day feasibility study includes a roof feasibility check, the area available for installation and a financial ROI sheet for your site.
Guides and glossary
Guides and terms behind a 500 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Performance ratio (PR): how to judge a plant after commissioningRead the guide
Terms used on this page
Free feasibility study
Want a 500 kWp plant on your own site?
Tell us the roof type and last year's bills. An engineer gets back within 48 hours. The 7-day feasibility study costs nothing.