Project · Dadra and Nagar Haveli and Daman and Diu

Ronch Polymer – Daman: 173 kWp metal sheet rooftop solar in Dadra and Nagar Haveli and Daman and Diu

Generating since Dec 2024. Ronch Polymer bought the plant under CAPEX and owns it. It is one of 4 Ronch Polymer plants on our project list.

173 kWp metal sheet rooftop plant at Ronch Polymer in Daman, Dadra and Nagar Haveli and Daman and Diu
Capacity
173 kWp
Installation
Metal sheet roof
Location
Daman, Dadra and Nagar Haveli and Daman and Diu
Finance model
CAPEX

Plant details

Client
Ronch Polymer
Industry
Polymer
Capacity
173 kWp (DC), with 140 kW (AC) of inverters
Service
EPC + O&M
Commissioned
Dec 2024
Status
Operational. Built and maintained by Adhvanik Energy; owned by the client.

At 173 kWp, the plant fits on a single roof or one section of a site, sized to one building's daytime load. Its 173 kWp of modules feed 140 kW of inverters, a DC/AC ratio of 1.24.

With a commissioning month of Dec 2024, the plant has a year or more of readings, enough to compare each month with the same month a year earlier. Its first readings, in Dec 2024, met the longest winter shadows.

Closest in capacity on the list: MDB Chemicals – Jalgaon (176 kWp, Maharashtra). Simplex Metal Processors – Pithampur (350 kWp, Madhya Pradesh) and Balmer Lawrie – Selaqui (530 kWp, Uttarakhand) were also commissioned in Dec 2024. In Dadra and Nagar Haveli and Daman and Diu, in order of commissioning, Ronch Polymer – Daman, 478 kWp comes before it and Dabur – Silvassa after.

On site

4 photos and a video clip from the plant. Select one to enlarge.

Engineering

What a metal sheet rooftop plant involves

Putting 173 kWp on sheet means respecting a roof built to keep rain out and carry little else. The rails spread the array's weight across several purlins, and the design is checked against wind uplift for the site.

Before modules go on a sheet roof like the one at Ronch Polymer – Daman, the roof assessment covers sheet age and corrosion and any turbo ventilators or skylights, and a structural engineer confirms the purlins. A leaking bay is re-sheeted first, because lifting modules off a roof later costs more than doing the job beforehand.

After commissioning, Asset Connect logs output and alerts, and a monthly report an engineer signs sets measured performance ratio against the design.

Finance model

How the plant is paid for

Ronch Polymer – Daman was financed as CAPEX: the client paid for the plant and owns it from day one. Every unit it generates replaces a unit bought from the grid, and the saving is the client's.

Compared with a PPA, CAPEX needs money up front and leaves the plant with the owner. Ask for both prices on the same roof.

Daman

Polymer plants in Dadra and Nagar Haveli and Daman and Diu

Solar resource here
1,949 kWh/m² a yearAbout 1,635 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Daman; a roof plant at roof tilt differs.
Capacity range
Under 250 kWp173 kWp here. 33 plants on our list are in this range.
Type of installation
Metal sheet roofThe most common factory roof.
Finance option
CAPEXThe factory owns the plant from day one.

Daman is a repeat location on the list, with 4 plants listed. Its one named sector is polymer.

The Daman area page lists 4 plants, with a link to each.

Across Dadra and Nagar Haveli and Daman and Diu our list holds 7 plants in 2 towns, commissioned between 2024 and 2026.

Extrusion and moulding run for long shifts and draw steady power, which gives a solar plant a dependable daytime load.

Heat from the process can raise roof temperature, so the roof assessment looks at sheet condition and at ventilators close to the array.

Projects

Related plants

Also in Daman

Elsewhere in Dadra and Nagar Haveli and Daman and Diu

Other plants on metal sheet roofs

Common questions

The Ronch Polymer – Daman plant: questions and answers

How big is the Ronch Polymer – Daman plant?

The plant has 173 kWp of modules (DC) feeding 140 kW of inverters (AC). Modules are quoted in kWp and inverters in kW. As a ratio that is 1.24: the array is rated above the inverters, which cap what the plant can feed the site at any moment.

What does the roof mean for the 173 kWp plant at Daman?

Metal sheet, per the list. On a roof like that the mounting is chosen per roof, and sheet condition is checked before any module goes on.

Is Daman within your reach for a new plant?

Yes. 4 plants are listed for Daman, among 7 in Dadra and Nagar Haveli and Daman and Diu. The free 7-day feasibility study needs only your town and a typical monthly bill.

Free feasibility study

Plan a plant for your own Dadra and Nagar Haveli and Daman and Diu site

The free 7-day study gives a site in Daman an ROI sheet, a policy check, roof feasibility and a budgetary quote. Expect an engineer within 48 hours.

Call us+91 22 4618 3484Get a free feasibility study