Dadra and Nagar Haveli and Daman and Diu
Industrial rooftop solar in Silvassa
3 plants in the town that heads Dadra and Nagar Haveli district, all commissioned in 2026: 3 on a PPA and 0 on CAPEX.
- projects listed here in Silvassa
- 3
- plants on a PPA
- 3
- industry named
- 1
- most recent commissioning
- Jun 2026
The industrial belt
Industrial estates since 1965
Silvassa is the headquarters of Dadra and Nagar Haveli district and the largest city in the union territory, with 98,266 residents at the 2011 census. Industry came after 1965, when cooperative industrial estates were set up at Silvassa, Masat and Khadoli. The territory's industries association lists over 1,600 small-scale units and 430 medium and large industries in textiles, engineering, plastics, electronics and chemicals, employing more than 43,000 people. Silvassa is described as a major centre for plastic products.
The monsoon is heavy. The district's official profile gives 2,000 to 2,500 mm of rain a year, summers (March to June) of 24 to 38 °C and winters of 11 to 22 °C. The Daman Ganga river runs through the territory to the sea at Daman. Our list names the town, so none of the plants below is attached to a particular estate.
Sources: Silvassa (opens in a new tab), Dadra and Nagar Haveli district at a glance (opens in a new tab), Dadra & Nagar Haveli Industries Association: facts and figures (opens in a new tab), Dadra and Nagar Haveli (opens in a new tab). As of Nov 2026.
Our plants here
Three plants, two of them PPAs
3 plants listed here, commissioned between Apr 2026 and Jun 2026. The largest, 937 kWp on a metal sheet roof, is tagged FMCG and was built on CAPEX; the other two (500 kWp and 249 kWp) are general industrial plants on a PPA. Three entries do not make a pattern, but they show a Silvassa factory can go either way on finance.
Under a PPA we own and run the plant and the factory pays for the power it takes. In an estate where the shed belongs to a cooperative or a landlord, the owner's consent is part of the deal, so ask for it early.
At 2,000 mm or more a year the roof is wet for months. Ask how roof penetrations are sealed, who clears drainage, and whether cleaning is in the plan.
Projects
Plants listed in Silvassa
Newest first.
What to check first
Roof ownership, rain and the utility: checks for Silvassa
- 01
Who owns the roof
If you rent the shed or share it, a PPA needs the owner's written consent before anything is priced.
Solar PPA for factories - 02
Drainage through the wet months
Ask who keeps gutters and sheet laps clear between June and September, and how that is recorded.
Solar O&M and AMC - 03
Sheet, fasteners and leaks
Ask the roof-sheet maker which fixings keep the warranty, and how each penetration is sealed.
Metal sheet roof solar - 04
Terms from your utility
Ask the utility that supplies your connection which metering terms apply, and get the answer in writing.
Guide: behind the meter or net metering
Guides and glossary
Guides and terms for Silvassa factories
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
Terms used on this page
Do you build in the Masat and Khadoli estates?
Our Silvassa plants are listed by town, so none is attached to an estate. For a factory in Masat, Khadoli or elsewhere in the district, send your town and average monthly bill; the free 7-day feasibility study starts from those.
Why are two of the three Silvassa plants PPAs?
We do not record why. A PPA suits a factory that would rather not spend capital, and the financing pages explain how it compares with CAPEX on the same roof.
How wet is Silvassa, and does that affect a solar plant?
The district profile gives 2,000 to 2,500 mm a year, nearly all in the monsoon. Output drops in the wettest weeks, and drainage, sealing and cleaning matter more than they do in drier towns.
Can I assume a Gujarat or Maharashtra rule applies in Silvassa?
No. Dadra and Nagar Haveli and Daman and Diu is a union territory, so read nothing across from its neighbours. Ask your utility for the terms on your connection. The free 7-day feasibility study includes that check.
How does a PPA work for a shed I rent in a Silvassa estate?
Adhvanik invests in and owns the plant, and the factory pays for the electricity it generates. Because the plant sits on someone else's roof, the owner's written consent comes first, and the lease term should be long enough for the PPA.
Free feasibility study
Silvassa shed? Ask who owns the roof, then send the bill
The feasibility study is free, takes 7 days and carries no commitment. An engineer replies within 48 hours.
What the study covers
- Financial ROI sheet based on a preliminary design
- Policy check for your state and connection
- Roof feasibility and the area available for installation
