Project · O&M only · Dadra and Nagar Haveli and Daman and Diu

Plastiblends – Daman: 200 kWp solar plant in Dadra and Nagar Haveli and Daman and Diu, maintained by Adhvanik

Plastiblends' plant in Daman was built by another company, and our O&M engineers maintain it. It is one of 6 Plastiblends plants on our project list.

200 kWp solar plant at Plastiblends in Daman, Dadra and Nagar Haveli and Daman and Diu
Capacity
200 kWp
Installation
Metal sheet roof
Location
Daman, Dadra and Nagar Haveli and Daman and Diu
Service
O&M only

Size, roof and service

Client
Plastiblends
Industry
Polymer
Capacity
200 kWp (DC), with 200 kW (AC) of inverters
Commissioned
Apr 2024
Status
Built by another company. Adhvanik Energy maintains it. O&M only

200 kWp is mid-sized for the list, enough to span a production hall or two. Modules and inverters are closely matched, a DC/AC ratio of 1.00.

Since Apr 2024, the plant in Daman has run through several monsoons. That history is the first thing an O&M review reads. Its first readings, in Apr 2024, came in the dusty summer months.

The plant closest to it in size on our list is Sansera Engineering – Manesar (201 kWp, Haryana). Apr 2024 also saw MTC – Bidadi (181 kWp, Karnataka) and Plastiblends – Daman (67 kWp) commissioned.

On site

4 photos from the plant. Select one to enlarge.

O&M

Our O&M scope at a plant we did not build

The original build at Plastiblends – Daman is another company's work. What we take on is the plant as it stands: its modules, inverters and cabling, and the generation record that shows how it is doing.

Our O&M contracts carry a 95% uptime guarantee and a performance-ratio guarantee. We respond remotely within 1 working day. If the fault cannot be fixed remotely, an engineer attends site within 2 working days. Contracts run up to 25 years.

Most losses at a working plant are small and gradual, such as a loose connector, built-up dust or a midday inverter trip, and monitoring and inspection find them early.

Finance model

Who owns the plant, and who runs it

Our relationship with Plastiblends – Daman is maintenance. Who financed the plant is a matter between its owner and its builder.

An AMC is an annual maintenance contract. Ours covers inspection, repair response and monitoring on Asset Connect.

Daman

Daman and the polymer sector

Solar resource here
1,949 kWh/m² a yearAbout 1,635 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Daman; a roof plant at roof tilt differs.
Capacity range
Under 250 kWp200 kWp here. 33 plants on our list are in this range.
Type of installation
Metal sheet roofThe most common factory roof.
Service
O&M onlyOne team accountable for output, with a monthly report.

Daman is a repeat location on the list, with 4 plants listed. The sector named there is polymer.

The Daman area page lists 4 plants, with a link to each.

Dadra and Nagar Haveli and Daman and Diu has 7 projects on the list, across 2 towns. By roof, 7 on metal sheet roofs.

Polymer processing is power-hungry and often continuous, so much of what a plant generates is used on site.

Polymer works often occupy long sheds, which suit straight rows and simple cable routes.

Projects

Other plants on the list

Also in Daman

Elsewhere in Dadra and Nagar Haveli and Daman and Diu

Other plants we maintain but did not build

Common questions

The Plastiblends – Daman plant: questions and answers

When was the plant commissioned?

Our list records Apr 2024. Module degradation and wear on inverters and cables now show in the record.

Who maintains this Daman plant?

The plant belongs to its owner and was built by another company. Maintenance is ours: monitoring on Asset Connect, inspections and fault response.

Can the Plastiblends – Daman design be repeated at my site?

Only a check of your own site can say. The free 7-day feasibility study covers roof feasibility and the area available, a financial ROI sheet and a budgetary quote.

Free feasibility study

Want a 200 kWp plant on your own site?

Tell us the roof type and last year's bills. An engineer gets back within 48 hours. The 7-day feasibility study costs nothing.

Call us+91 22 4618 3484Get a free feasibility study