Project · O&M only · Dadra and Nagar Haveli and Daman and Diu
Plastiblends – Daman: 200 kWp solar plant in Dadra and Nagar Haveli and Daman and Diu, maintained by Adhvanik
Plastiblends' plant in Daman was built by another company, and our O&M engineers maintain it. It is one of 6 Plastiblends plants on our project list.

- Capacity
- 200 kWp
- Installation
- Metal sheet roof
- Location
- Daman, Dadra and Nagar Haveli and Daman and Diu
- Service
- O&M only
Size, roof and service
- Client
- Plastiblends
- Industry
- Polymer
- Capacity
- 200 kWp (DC), with 200 kW (AC) of inverters
- Commissioned
- Apr 2024
- Status
- Built by another company. Adhvanik Energy maintains it. O&M only
200 kWp is mid-sized for the list, enough to span a production hall or two. Modules and inverters are closely matched, a DC/AC ratio of 1.00.
Since Apr 2024, the plant in Daman has run through several monsoons. That history is the first thing an O&M review reads. Its first readings, in Apr 2024, came in the dusty summer months.
The plant closest to it in size on our list is Sansera Engineering – Manesar (201 kWp, Haryana). Apr 2024 also saw MTC – Bidadi (181 kWp, Karnataka) and Plastiblends – Daman (67 kWp) commissioned.
On the location pages: Daman and Silvassa · Daman. See it in the projects index.
On site
4 photos from the plant. Select one to enlarge.
O&M
Our O&M scope at a plant we did not build
The original build at Plastiblends – Daman is another company's work. What we take on is the plant as it stands: its modules, inverters and cabling, and the generation record that shows how it is doing.
Our O&M contracts carry a 95% uptime guarantee and a performance-ratio guarantee. We respond remotely within 1 working day. If the fault cannot be fixed remotely, an engineer attends site within 2 working days. Contracts run up to 25 years.
Most losses at a working plant are small and gradual, such as a loose connector, built-up dust or a midday inverter trip, and monitoring and inspection find them early.
Finance model
Who owns the plant, and who runs it
Our relationship with Plastiblends – Daman is maintenance. Who financed the plant is a matter between its owner and its builder.
An AMC is an annual maintenance contract. Ours covers inspection, repair response and monitoring on Asset Connect.
Daman
Daman and the polymer sector
- Solar resource here
- 1,949 kWh/m² a yearAbout 1,635 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Daman; a roof plant at roof tilt differs.
- Capacity range
- Under 250 kWp200 kWp here. 33 plants on our list are in this range.
- Type of installation
- Metal sheet roofThe most common factory roof.
- Service
- O&M onlyOne team accountable for output, with a monthly report.
Daman is a repeat location on the list, with 4 plants listed. The sector named there is polymer.
The Daman area page lists 4 plants, with a link to each.
Dadra and Nagar Haveli and Daman and Diu has 7 projects on the list, across 2 towns. By roof, 7 on metal sheet roofs.
Polymer processing is power-hungry and often continuous, so much of what a plant generates is used on site.
Polymer works often occupy long sheds, which suit straight rows and simple cable routes.
Sector page: Plastics & polymers solar.
Projects
Other plants on the list
Also in Daman
- Ronch Polymer – Daman, 478 kWpMetal sheet roof · Dec 2024
- Ronch Polymer – Daman, 173 kWpMetal sheet roof · Dec 2024
- Plastiblends – Daman, 67 kWpO&M only · Apr 2024
Elsewhere in Dadra and Nagar Haveli and Daman and Diu
- Sterlite – Silvassa, 500 kWpMetal sheet roof · Jun 2026
Other plants we maintain but did not build
- Samruddhi Industries – Chittoor501 kWp · O&M only
- Britannia – Puducherry467 kWp · O&M only
- Sansera Engineering – Manesar201 kWp · O&M only · Sep 2025
- ArcelorMittal Nippon Steel – Bahadurgarh600 kWp · O&M only · Oct 2024
Common questions
The Plastiblends – Daman plant: questions and answers
When was the plant commissioned?
Our list records Apr 2024. Module degradation and wear on inverters and cables now show in the record.
Who maintains this Daman plant?
The plant belongs to its owner and was built by another company. Maintenance is ours: monitoring on Asset Connect, inspections and fault response.
Can the Plastiblends – Daman design be repeated at my site?
Only a check of your own site can say. The free 7-day feasibility study covers roof feasibility and the area available, a financial ROI sheet and a budgetary quote.
Guides and glossary
Guides and terms behind a 200 kWp plant
- Performance ratio (PR): how to judge a plant after commissioningRead the guide
- Reading your electricity bill: the numbers that matter for solarRead the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
Terms used on this page
Free feasibility study
Want a 200 kWp plant on your own site?
Tell us the roof type and last year's bills. An engineer gets back within 48 hours. The 7-day feasibility study costs nothing.