Project · Maharashtra
NDR Warehousing – Pune: 100 kWp metal sheet rooftop solar in Maharashtra
NDR Warehousing bought the plant under CAPEX and owns it. The plant has supplied the site since Dec 2025.
- Capacity
- 100 kWp
- Installation
- Metal sheet roof
- Location
- Pune, Maharashtra
- Finance model
- CAPEX
Size, roof and finance model
- Client
- NDR Warehousing
- Capacity
- 100 kWp (DC), with 80 kW (AC) of inverters
- Service
- EPC + O&M
- Commissioned
- Dec 2025
- Status
- Operational. Built and maintained by Adhvanik Energy; owned by the client.
This Pune plant is a small plant by the standard of the list: 100 kWp, one roof or one block. 80 kW of inverters serve 100 kWp of modules: a DC/AC ratio of 1.25.
The plant began supplying the site in Dec 2025. With a full year on record, a month that falls short of the same month last year stands out. Dec 2025 falls in the short-day season.
Closest in capacity on the list: MTC – Bidadi (100 kW (AC), Karnataka). Dec 2025 also saw Blink Infra – Selaqui (332 kWp, Uttarakhand) and Marico – Jalgaon (517 kWp) commissioned. Of the Maharashtra plants on our list, Marico – Jalgaon was commissioned just before it and Mahyco – Jalna just after.
Solar in the area: Maharashtra · Pune and its MIDC estates. Find this plant in the projects index.
Engineering
The engineering behind a plant like NDR Warehousing – Pune
The 100 kWp at the NDR Warehousing plant sits on metal sheet roofing. In many cases the structure is fixed through the sheet; where the owner wants a zero-leakage roof, the mounting is non-penetrating, with clamps that grip the ribs or seams or adhesive bonding of the rails.
Walkways and safety lines matter more on sheet than on concrete, since a sheet that was never meant for foot traffic can crack underfoot. A 100 kWp array is laid out with fixed walkways so cleaning crews and O&M engineers stay on structure.
Most losses at a working plant are small and gradual, such as a loose connector, built-up dust or a midday inverter trip, and monitoring and inspection find them early.
Finance model
What CAPEX means here
At the NDR Warehousing plant the client carried the capital cost of the 100 kWp plant, which makes it a CAPEX project. The generation is the client's from the first unit, offsetting what the site would buy from its distribution company.
We design, procure, build and commission a CAPEX plant, then hand it over. A 1-year defect liability period covers the entire installation, we handle manufacturer warranty claims, and the owner can sign an O&M contract of up to 25 years.
Pune
Where NDR Warehousing – Pune sits on our list
- Solar resource here
- 1,920 kWh/m² a yearAbout 1,590 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Pune; a roof plant at roof tilt differs.
- Capacity range
- Under 250 kWp100 kWp here. 33 plants on our list are in this range.
- Type of installation
- Metal sheet roofThe most common factory roof.
- Finance option
- CAPEXThe factory owns the plant from day one.
We list 12 plants in Pune, and this Pune plant is one of them. Between them they cover automotive; electrical and electronics; polymer; chemicals; steel and metals.
Pune is covered on the page for Pune and its MIDC estates, which lists 12 plants.
Across Maharashtra our list holds 44 plants in 17 towns, commissioned between 2020 and 2026.
Sector pages: industries we work with. Rules for Maharashtra: solar policy.
Projects
More plants near Pune
Also in Pune
- Mitsubishi Electric – Pune1,000 kWp · Metal sheet roof · Feb 2026
- Victora Industries – Pune843 kWp · Metal sheet roof · Jul 2025
- AQ Inductive Components – Pune400 kWp · Metal sheet roof · Oct 2024
- MDB Chemicals – Pune400 kWp · Metal sheet roof · Oct 2024
Elsewhere in Maharashtra
- Exotic Fruits – Nashik1,332 kWp · Metal sheet roof · Jul 2026
- Baramati Cattlefeeds – Baramati771 kWp · Metal sheet roof · Jul 2026
- FUSO Glass – Murbad926 kWp · Metal sheet roof · Jul 2026
- Ozpure – Maharashtra867 kWp · Metal sheet roof · Jul 2026
Other plants on metal sheet roofs
- Natural Living – Pithampur500 kWp · Metal sheet roof · Jun 2026
- West Coast – Surat, 162 kWpMetal sheet roof · Jun 2026
- United Genetics India – Aurangabad133 kWp · Metal sheet roof · May 2026
- DP Cocoa – Varadaiahpalem759 kWp · Metal sheet roof · May 2026
Common questions
Questions about the plant
When was the plant commissioned?
The NDR Warehousing plant was commissioned in Dec 2025 and has supplied the site since then.
Who looks after the 100 kWp plant at Pune?
The client owns it, because the plant was financed as CAPEX. Adhvanik Energy built the plant and maintains it under an O&M contract.
How do I find out if my roof can carry 100 kWp?
Not by default. Each site has its own roof, shade and load. The free 7-day feasibility study covers roof feasibility, a policy check for your state and a budgetary quote.
Guides and glossary
Guides and terms behind a 100 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Reading your electricity bill: the numbers that matter for solarRead the guide
Terms used on this page
Free feasibility study
Find out what your sheds can carry
The free 7-day study gives a site in Pune an ROI sheet, a policy check, roof feasibility and a budgetary quote. Expect an engineer within 48 hours.