Exotic Fruits – Nashik: 1,332 kWp metal sheet rooftop solar in Maharashtra
Adhvanik Energy owns and runs it, and Exotic Fruits pays for each unit the plant generates, under a PPA. The plant has supplied the site since Jul 2026. It is one of 2 Exotic Fruits plants on our project list.

- Capacity
- 1,332 kWp
- Installation
- Metal sheet roof
- Location
- Nashik, Maharashtra
- Finance model
- PPA / OPEX
This plant at a glance
- Client
- Exotic Fruits
- Industry
- FMCG
- Capacity
- 1,332 kWp (DC), with 1,000 kW (AC) of inverters
- Service
- EPC + O&M
- Commissioned
- Jul 2026
- Status
- Operational. Owned and run by Adhvanik Energy.
From 1,000 kW of capacity upward, a plant is usually built in many blocks, each with its own inverter. The Exotic Fruits plant is in that class. Its 1,332 kWp of modules feed 1,000 kW of inverters, a DC/AC ratio of 1.33.
The plant in Nashik started supplying the site in Jul 2026. A few months of readings will set its baseline. Jul 2026 was a monsoon month, so early output ran under cloud.
The plant closest to it in size on our list is Legrand – Nashik (1,300 kWp). Jul 2026 also saw Baramati Cattlefeeds – Baramati (771 kWp) and FUSO Glass – Murbad (926 kWp) commissioned. Its nearest neighbour in Maharashtra, in order of commissioning, is Baramati Cattlefeeds – Baramati.
More on the area: Maharashtra · Nashik and Sinnar. It is also listed in the full project list.
On site
4 photos and a video clip from the plant. Select one to enlarge.
Engineering
How a 1,332 kWp plant is put together
The 1,332 kWp at the plant sits on metal sheet roofing. In many cases the structure is fixed through the sheet; where the owner wants a zero-leakage roof, the mounting is non-penetrating, with clamps that grip the ribs or seams or adhesive bonding of the rails.
Walkways and safety lines matter more on sheet than on concrete, since a sheet that was never meant for foot traffic can crack underfoot. A 1,332 kWp array is laid out with fixed walkways so cleaning crews and O&M engineers stay on structure.
Irradiance sensors give Asset Connect the sunshine a 1,332 kWp plant should have converted, so a shortfall can be told apart from a cloudy week.
Finance model
What PPA / OPEX means here
This Nashik plant gets its solar through a PPA: 1,332 kWp on its site, owned by Adhvanik Energy and paid for per unit generated, at the tariff in the contract.
Because we own the plant, we carry its performance: our O&M team runs it, and its output is what the contract is priced on. PPAs run 5 to 25 years.
Nashik
Where Exotic Fruits – Nashik sits on our list
- Solar resource here
- 1,935 kWh/m² a yearAbout 1,622 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Nashik; a roof plant at roof tilt differs.
- Capacity range
- 1,000 kWp and above1,332 kWp here. 19 plants on our list are in this range.
- Type of installation
- Metal sheet roofThe most common factory roof.
- Finance option
- PPA / OPEXNo capital from the factory: it pays per unit generated.
We list 5 plants in Nashik, and the plant is one of them. Sectors named there: hospitality; electrical and electronics; FMCG.
Nashik is covered on the page for Nashik and Sinnar, which lists 7 plants.
Maharashtra has 44 projects on the list, across 17 towns. By roof, 40 on metal sheet roofs, 1 on Carport, 1 on Carport + RCC, 1 on ground mount and 1 on RCC.
FMCG sites tend to run packing and dispatch in daylight hours, which lines up with when a solar plant generates.
Warehouses and packing halls give long runs of clear roof, which keeps the array simple.
Sector page: FMCG solar. Rules for Maharashtra: solar policy.
Projects
More plants near Nashik
Also in Nashik
- Legrand – Nashik1,300 kWp · Metal sheet roof · May 2026
- Zenith Irrigation – Nashik420 kWp · Metal sheet roof · May 2025
- Soma Resort – Nashik, 50 kWpMetal sheet roof · Feb 2022
- Soma Resort – Nashik, 83 kWpMetal sheet roof · Feb 2020
Elsewhere in Maharashtra
- Baramati Cattlefeeds – Baramati771 kWp · Metal sheet roof · Jul 2026
- FUSO Glass – Murbad926 kWp · Metal sheet roof · Jul 2026
- Ozpure – Maharashtra867 kWp · Metal sheet roof · Jul 2026
- Baramati Cattlefeeds – Shrirampur, 578 kWpMetal sheet roof · Jul 2026
Other plants on metal sheet roofs
- Apple Flexipack – Indore565 kWp · Metal sheet roof · Apr 2025
- Mahyco – Buldhana621 kWp · Metal sheet roof · Apr 2025
- Samruddhi Industries – Sangli800 kWp · Metal sheet roof · Apr 2025
- Akome Life Care – Haridwar600 kWp · Metal sheet roof · Apr 2025
Common questions
Questions about Exotic Fruits – Nashik
What is the commissioning date of the Exotic Fruits – Nashik plant?
Our list records Jul 2026. Its early months set the performance-ratio baseline.
Who looks after the 1,332 kWp plant at Nashik?
We do. This Nashik plant is a PPA / OPEX plant, so Adhvanik Energy owns it, operates it and maintains it, and the host site pays per unit generated.
Could a plant like the plant fit my factory?
Not by default. Each site has its own roof, shade and load. The free 7-day feasibility study covers roof feasibility, a policy check for your state and a budgetary quote.
Guides and glossary
Guides and terms behind a 1,332 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Performance ratio (PR): how to judge a plant after commissioningRead the guide
Terms used on this page
Free feasibility study
Find out what your sheds can carry
Send your Maharashtra town and monthly bill. An engineer replies within 48 hours, and the 7-day study is free.