Project · Bihar
Britannia – Bihta: 1,600 kWp metal sheet rooftop solar in Bihar
Britannia bought the plant under CAPEX and owns it. The plant has supplied the site since Nov 2025. It is one of 8 Britannia plants on our project list.

- Capacity
- 1,600 kWp
- Installation
- Metal sheet roof
- Location
- Bihta, Bihar
- Finance model
- CAPEX
This plant at a glance
- Client
- Britannia
- Industry
- FMCG
- Capacity
- 1,600 kWp (DC), with 1,250 kW (AC) of inverters
- Service
- EPC + O&M
- Commissioned
- Nov 2025
- Status
- Operational. Built and maintained by Adhvanik Energy; owned by the client.
At 1,600 kWp, Britannia – Bihta is among the largest plants on our list, and the structural check, cable route and connection point drive the design. Its 1,600 kWp of modules feed 1,250 kW of inverters, a DC/AC ratio of 1.28.
With a commissioning month of Nov 2025, the plant has a year or more of readings, enough to compare each month with the same month a year earlier. Its first readings, in Nov 2025, followed the rains.
The plant closest to it in size on our list is Britannia – Guwahati (1,700 kWp, Assam). Its nearest neighbour in Bihar, in order of commissioning, is Britannia – Hajipur.
On the location pages: Bihar. See it in the filterable project list.
Engineering
What a metal sheet rooftop plant involves
For the metal sheet roof at Britannia – Bihta, the starting point is the sheet itself: its make, profile, thickness and age. Those four facts tell the engineer whether clamps or adhesive fit, and how many years of life the roof has left under the array.
On a long shed, a short, tidy cable route on trays, from array to inverters to LT panel, saves losses and maintenance time over the life of the plant.
A plant in Bihta is only as good as its upkeep: inspections of connectors and inverters, cleaning that follows the local dust, and Asset Connect alerts on a string that has gone quiet.
Finance model
What CAPEX means here
CAPEX is the model where the client buys the plant. For the plant, that means the 1,600 kWp system is the client's property since Nov 2025, with the savings and the upkeep decisions on the client's side.
We design, procure, build and commission a CAPEX plant, then hand it over. A 1-year defect liability period covers the entire installation, we handle manufacturer warranty claims, and the owner can sign an O&M contract of up to 25 years.
Bihta
Bihta and the FMCG sector
- Solar resource here
- 1,734 kWh/m² a yearAbout 1,455 kWh per kWp a year for a standard tilted system; December is the weakest month. Global Solar Atlas estimate for Bihta; a roof plant at roof tilt differs.
- Capacity range
- 1,000 kWp and above1,600 kWp here. 19 plants on our list are in this range.
- Type of installation
- Metal sheet roofThe most common factory roof.
- Finance option
- CAPEXThe factory owns the plant from day one.
No other plant in Bihta is on our published list yet, so the Britannia plant is the town's one record here.
Across Bihar our list holds 2 plants in 2 towns, commissioned in 2025.
FMCG sites tend to run packing and dispatch in daylight hours, which lines up with when a solar plant generates.
Warehouses and packing halls give long runs of clear roof, which keeps the array simple.
Sector page: FMCG solar.
Projects
Related plants
Elsewhere in Bihar
- Britannia – Hajipur1,050 kWp · Metal sheet roof · Oct 2025
Other plants on metal sheet roofs
- Radiant Indus Chem – Aurangabad1,235 kWp · Metal sheet roof · Dec 2024
- Simplex Metal Processors – Pithampur, 350 kWpMetal sheet roof · Dec 2024
- Balmer Lawrie – Selaqui530 kWp · Metal sheet roof · Dec 2024
- AQ Inductive Components – Pune400 kWp · Metal sheet roof · Oct 2024
Common questions
What people ask about this plant
When was this Bihta plant commissioned?
The Britannia plant was commissioned in Nov 2025 and has supplied the site since then. With a full year on record, a month that falls short of the same month last year stands out.
Who owns the Britannia – Bihta plant?
Ownership sits with the client under CAPEX. We designed and built the plant, and our O&M team maintains it.
Could a plant like this Bihta plant fit my factory?
Not by default. Each site has its own roof, shade and load. The free 7-day feasibility study covers roof feasibility, a policy check for your state and a budgetary quote.
Guides and glossary
Guides and terms behind a 1,600 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Reading your electricity bill: the numbers that matter for solarRead the guide
Terms used on this page
Free feasibility study
Plan a plant for your own Bihar site
The free 7-day study gives a site in Bihta an ROI sheet, a policy check, roof feasibility and a budgetary quote. Expect an engineer within 48 hours.