Project · Maharashtra

FUSO Glass – Murbad: 926 kWp metal sheet rooftop solar in Maharashtra

Generating since Jul 2026. FUSO Glass bought the plant under CAPEX and owns it. It is one of 4 FUSO Glass plants on our project list.

Capacity
926 kWp
Installation
Metal sheet roof
Location
Murbad, Maharashtra
Finance model
CAPEX

This plant at a glance

Client
FUSO Glass
Industry
Glass & Ceramics
Capacity
926 kWp (DC), with 725 kW (AC) of inverters
Service
EPC + O&M
Commissioned
Jul 2026
Status
Operational. Built and maintained by Adhvanik Energy; owned by the client.

A 926 kWp plant needs a big roof or plot, and its structural check, shade analysis and connection point take longer than a small plant's. 725 kW of inverters serve 926 kWp of modules: a DC/AC ratio of 1.28.

The FUSO Glass plant has been running only since Jul 2026. The early question is whether output matches the design. Its first weeks, in Jul 2026, were monsoon weeks.

Closest in capacity on the list: Dabur – Silvassa (937 kWp, Dadra and Nagar Haveli and Daman and Diu). Baramati Cattlefeeds – Shrirampur (578 kWp) and HUL – Haridwar (332 kWp, Uttarakhand) were also commissioned in Jul 2026. In Maharashtra, in order of commissioning, Ozpure – Maharashtra comes before it and Baramati Cattlefeeds – Baramati after.

Engineering

The engineering behind a plant like FUSO Glass – Murbad

A shed roof in Murbad gives a 926 kWp plant plenty of room, but it asks more of the structure than a slab does. Sheet profile, purlin spacing and design wind speed decide how the rails are fixed, and the fixing has to leave the sheet watertight.

The layout in Murbad is drawn around ventilators and skylights, which keep their access and stay out of the modules' shade. A shed roof is often long and clear in one direction, which allows straight rows and short cable runs to the LT panel.

Most losses at a working plant are small and gradual, such as a loose connector, built-up dust or a midday inverter trip, and monitoring and inspection find them early.

Finance model

What CAPEX means here

CAPEX is the model where the client buys the plant. For this Murbad plant, that means the 926 kWp system is the client's property since Jul 2026, with the savings and the upkeep decisions on the client's side.

Compared with a PPA, CAPEX needs money up front and leaves the plant with the owner. Ask for both prices on the same roof.

Murbad

Where FUSO Glass – Murbad sits on our list

Solar resource here
1,863 kWh/m² a yearAbout 1,544 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Murbad; a roof plant at roof tilt differs.
Capacity range
500 to 1,000 kWp926 kWp here. 38 plants on our list are in this range.
Type of installation
Metal sheet roofThe most common factory roof.
Finance option
CAPEXThe factory owns the plant from day one.

No other plant in Murbad is on our published list yet, so the plant is the town's one record here.

Murbad is covered on the page for Mumbai, Palghar, Boisar, Bhiwandi and Murbad, which lists 7 plants.

Across Maharashtra our list holds 44 plants in 17 towns, commissioned between 2020 and 2026.

Glass and ceramics are among the most energy-intensive industries, and furnaces and kilns run around the clock, so the load is large and constant.

Ask which parts of the site draw electricity by day, since furnaces may run on fuel and the solar plant serves the finishing and utilities load.

Projects

Other plants on the list

Elsewhere in Maharashtra

Other plants on metal sheet roofs

Common questions

Questions about the plant

How big is the FUSO Glass – Murbad plant?

The FUSO Glass plant has 926 kWp of modules (DC) feeding 725 kW of inverters (AC). Modules are quoted in kWp and inverters in kW. As a ratio that is 1.28: the array is rated above the inverters, which cap what the plant can feed the site at any moment.

What does the roof mean for the 926 kWp plant at Murbad?

The list records a metal sheet roof. On sheet the structure is fixed through the sheet or, for a zero-leakage roof, held by clamps or adhesive, and it is designed for the wind speed under IS 875.

Is Murbad within your reach for a new plant?

Yes. One plant is listed for Murbad, among 44 in Maharashtra. The free 7-day feasibility study needs only your town and a typical monthly bill.

Free feasibility study

Want a 926 kWp plant on your own site?

Send your Maharashtra town and monthly bill. An engineer replies within 48 hours, and the 7-day study is free.

Call us+91 22 4618 3484Get a free feasibility study