Arihant Auto – Aurangabad: 162 kWp metal sheet rooftop solar in Maharashtra
Generating since May 2022. Adhvanik Energy owns and runs it, and Arihant Auto pays for each unit the plant generates, under a PPA.

- Capacity
- 162 kWp
- Installation
- Metal sheet roof
- Location
- Aurangabad, Maharashtra
- Finance model
- PPA / OPEX
Size, roof and finance model
- Client
- Arihant Auto
- Industry
- Automotive
- Capacity
- 162 kWp (DC), with 120 kW (AC) of inverters
- Service
- EPC + O&M
- Commissioned
- May 2022
- Status
- Operational. Owned and run by Adhvanik Energy.
The Arihant Auto plant is a small plant by the standard of the list: 162 kWp, one roof or one block. The array is 35% larger than the inverters, a DC/AC ratio of 1.35.
Commissioned in May 2022, the plant has several seasons of data. The question now is whether performance ratio has held steady. Its first readings, in May 2022, came in the dusty summer months.
For scale, the nearest match in capacity is West Coast – Surat (162 kWp, Gujarat). In Maharashtra, in order of commissioning, Legrand – Sinnar, 508 kWp comes before it and Syngenta – Aurangabad after.
Solar in the area: Maharashtra · Aurangabad (Chhatrapati Sambhajinagar). It is also listed in the filterable project list.
Engineering
What a metal sheet rooftop plant involves
A shed roof in Aurangabad gives a 162 kWp plant plenty of room, but it asks more of the structure than a slab does. Sheet profile, purlin spacing and design wind speed decide how the rails are fixed, and the fixing has to leave the sheet watertight.
Before modules go on a sheet roof like the one at the plant, the roof assessment covers sheet age and corrosion and any turbo ventilators or skylights, and a structural engineer confirms the purlins. A leaking bay is re-sheeted first, because lifting modules off a roof later costs more than doing the job beforehand.
Most losses at a working plant are small and gradual, such as a loose connector, built-up dust or a midday inverter trip, and monitoring and inspection find them early.
Finance model
Who owns the plant, and who runs it
A PPA moves the capital cost to us. The client at this Aurangabad plant has had a solar supply since May 2022, with the cost arriving as a per-unit charge on what the plant supplies.
For the host site the PPA is a long contract, with terms from 5 to 25 years.
Aurangabad
Where Arihant Auto – Aurangabad sits on our list
- Solar resource here
- 1,918 kWh/m² a yearAbout 1,593 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Aurangabad; a roof plant at roof tilt differs.
- Capacity range
- Under 250 kWp162 kWp here. 33 plants on our list are in this range.
- Type of installation
- Metal sheet roofThe most common factory roof.
- Finance option
- PPA / OPEXNo capital from the factory: it pays per unit generated.
Aurangabad is a repeat location on the list, with 4 plants listed. Sectors named there: agro, automotive and chemicals.
Aurangabad is covered on the page for Aurangabad (Chhatrapati Sambhajinagar), which lists 4 plants.
Across Maharashtra our list holds 44 plants in 17 towns, commissioned between 2020 and 2026.
Auto-component plants run machining, stamping and assembly across shifts, with heavy daytime demand that a roof plant can meet in part.
The check for an auto plant is power quality and the point of connection, since sensitive machines are on the same panel.
Sector page: Automotive & auto components solar. Rules for Maharashtra: solar policy.
Projects
Related plants
Also in Aurangabad
- United Genetics India – Aurangabad133 kWp · Metal sheet roof · May 2026
- Radiant Indus Chem – Aurangabad1,235 kWp · Metal sheet roof · Dec 2024
- Syngenta – Aurangabad404 kWp · Ground mount · Jun 2022
Elsewhere in Maharashtra
- Exotic Fruits – Nashik1,332 kWp · Metal sheet roof · Jul 2026
- Baramati Cattlefeeds – Baramati771 kWp · Metal sheet roof · Jul 2026
- FUSO Glass – Murbad926 kWp · Metal sheet roof · Jul 2026
- Ozpure – Maharashtra867 kWp · Metal sheet roof · Jul 2026
Other plants on metal sheet roofs
- Durian Industries – Palghar525 kWp · Metal sheet roof · Jun 2025
- MYK Laticrete – Indore405 kWp · Metal sheet roof · Jun 2025
- Zenith Irrigation – Nashik420 kWp · Metal sheet roof · May 2025
- Mysore Deep Perfumery – Indore266 kWp · Metal sheet roof · May 2025
Common questions
Questions about Arihant Auto – Aurangabad
What does 162 kWp mean for the plant?
The Arihant Auto plant has 162 kWp of modules (DC) feeding 120 kW of inverters (AC). Modules are quoted in kWp and inverters in kW. As a ratio that is 1.35: the array is rated above the inverters, which cap what the plant can feed the site at any moment.
What roof is this Aurangabad plant built on?
The list records a metal sheet roof. On sheet the structure is fixed through the sheet or, for a zero-leakage roof, held by clamps or adhesive, and it is designed for the wind speed under IS 875.
Do you build plants in Maharashtra?
Yes. 4 plants are listed for Aurangabad, among 44 in Maharashtra. The free 7-day feasibility study needs only your town and a typical monthly bill.
Guides and glossary
Guides and terms behind a 162 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Reading your electricity bill: the numbers that matter for solarRead the guide
Terms used on this page
Free feasibility study
Find out what your sheds can carry
A 162 kWp plant is one data point. The free 7-day study gives you the numbers for your own site.