Project · Maharashtra

Arihant Auto – Aurangabad: 162 kWp metal sheet rooftop solar in Maharashtra

Generating since May 2022. Adhvanik Energy owns and runs it, and Arihant Auto pays for each unit the plant generates, under a PPA.

162 kWp metal sheet rooftop plant at Arihant Auto in Aurangabad, Maharashtra
Capacity
162 kWp
Installation
Metal sheet roof
Location
Aurangabad, Maharashtra
Finance model
PPA / OPEX

Size, roof and finance model

Client
Arihant Auto
Industry
Automotive
Capacity
162 kWp (DC), with 120 kW (AC) of inverters
Service
EPC + O&M
Commissioned
May 2022
Status
Operational. Owned and run by Adhvanik Energy.

The Arihant Auto plant is a small plant by the standard of the list: 162 kWp, one roof or one block. The array is 35% larger than the inverters, a DC/AC ratio of 1.35.

Commissioned in May 2022, the plant has several seasons of data. The question now is whether performance ratio has held steady. Its first readings, in May 2022, came in the dusty summer months.

For scale, the nearest match in capacity is West Coast – Surat (162 kWp, Gujarat). In Maharashtra, in order of commissioning, Legrand – Sinnar, 508 kWp comes before it and Syngenta – Aurangabad after.

On site

5 photos and a video clip from the plant. Select one to enlarge.

Engineering

What a metal sheet rooftop plant involves

A shed roof in Aurangabad gives a 162 kWp plant plenty of room, but it asks more of the structure than a slab does. Sheet profile, purlin spacing and design wind speed decide how the rails are fixed, and the fixing has to leave the sheet watertight.

Before modules go on a sheet roof like the one at the plant, the roof assessment covers sheet age and corrosion and any turbo ventilators or skylights, and a structural engineer confirms the purlins. A leaking bay is re-sheeted first, because lifting modules off a roof later costs more than doing the job beforehand.

Most losses at a working plant are small and gradual, such as a loose connector, built-up dust or a midday inverter trip, and monitoring and inspection find them early.

Finance model

Who owns the plant, and who runs it

A PPA moves the capital cost to us. The client at this Aurangabad plant has had a solar supply since May 2022, with the cost arriving as a per-unit charge on what the plant supplies.

For the host site the PPA is a long contract, with terms from 5 to 25 years.

Aurangabad

Where Arihant Auto – Aurangabad sits on our list

Solar resource here
1,918 kWh/m² a yearAbout 1,593 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Aurangabad; a roof plant at roof tilt differs.
Capacity range
Under 250 kWp162 kWp here. 33 plants on our list are in this range.
Type of installation
Metal sheet roofThe most common factory roof.
Finance option
PPA / OPEXNo capital from the factory: it pays per unit generated.

Aurangabad is a repeat location on the list, with 4 plants listed. Sectors named there: agro, automotive and chemicals.

Aurangabad is covered on the page for Aurangabad (Chhatrapati Sambhajinagar), which lists 4 plants.

Across Maharashtra our list holds 44 plants in 17 towns, commissioned between 2020 and 2026.

Auto-component plants run machining, stamping and assembly across shifts, with heavy daytime demand that a roof plant can meet in part.

The check for an auto plant is power quality and the point of connection, since sensitive machines are on the same panel.

Projects

Related plants

Also in Aurangabad

Elsewhere in Maharashtra

Other plants on metal sheet roofs

Common questions

Questions about Arihant Auto – Aurangabad

What does 162 kWp mean for the plant?

The Arihant Auto plant has 162 kWp of modules (DC) feeding 120 kW of inverters (AC). Modules are quoted in kWp and inverters in kW. As a ratio that is 1.35: the array is rated above the inverters, which cap what the plant can feed the site at any moment.

What roof is this Aurangabad plant built on?

The list records a metal sheet roof. On sheet the structure is fixed through the sheet or, for a zero-leakage roof, held by clamps or adhesive, and it is designed for the wind speed under IS 875.

Do you build plants in Maharashtra?

Yes. 4 plants are listed for Aurangabad, among 44 in Maharashtra. The free 7-day feasibility study needs only your town and a typical monthly bill.