Project · Maharashtra

Marico – Jalgaon: 517 kWp metal sheet rooftop solar in Maharashtra

Generating since Dec 2025. Marico bought the plant under CAPEX and owns it.

Capacity
517 kWp
Installation
Metal sheet roof
Location
Jalgaon, Maharashtra
Finance model
CAPEX

Size, roof and finance model

Client
Marico
Industry
FMCG
Capacity
517 kWp (DC), with 400 kW (AC) of inverters
Service
EPC + O&M
Commissioned
Dec 2025
Status
Operational. Built and maintained by Adhvanik Energy; owned by the client.

517 kWp puts Marico – Jalgaon in the larger group on the list, usually with several inverters sharing the load. Its 517 kWp of modules feed 400 kW of inverters, a DC/AC ratio of 1.29.

The plant began supplying the site in Dec 2025. With a full year on record, a month that falls short of the same month last year stands out. Dec 2025 fell in the low-sun winter months.

For scale, the nearest match in capacity is Zeeta Electrical – Sanand (519 kWp, Gujarat). Blink Infra – Selaqui (332 kWp, Uttarakhand) and Pidilite – Baddi (227 kWp, Himachal Pradesh) were also commissioned in Dec 2025. In Maharashtra, in order of commissioning, Essgee – Mumbai comes before it and NDR Warehousing – Pune after.

Engineering

How a 517 kWp plant is put together

Metal sheet is a light roof, and a 517 kWp array adds weight and wind load to purlins that were sized for the sheet alone. On a roof like this one in Jalgaon, a structural engineer confirms the roof can take the load, and the structure is designed for the wind speed under IS 875.

Edge protection, lifelines and fixed walkways are part of the design, because crews work on a surface not built for foot traffic. The same arrangements serve the cleaning team for as long as a 517 kWp plant runs.

Asset Connect keeps generation, irradiance and alerts in one place, and a drop in performance ratio is the first sign that a string, an inverter or the module surface needs attention.

Finance model

Who owns the plant, and who runs it

At the Marico plant the client carried the capital cost of the 517 kWp plant, which makes it a CAPEX project. The generation is the client's from the first unit, offsetting what the site would buy from its distribution company.

Compared with a PPA, CAPEX needs money up front and leaves the plant with the owner. Ask for both prices on the same roof.

Jalgaon

Where Marico – Jalgaon sits on our list

Solar resource here
1,926 kWh/m² a yearAbout 1,601 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Jalgaon; a roof plant at roof tilt differs.
Capacity range
500 to 1,000 kWp517 kWp here. 38 plants on our list are in this range.
Type of installation
Metal sheet roofThe most common factory roof.
Finance option
CAPEXThe factory owns the plant from day one.

Besides this Jalgaon plant, our list has 1 other plant in Jalgaon. The named sectors are chemicals and FMCG.

In Maharashtra the list shows 44 projects in 17 towns. Named sectors include electrical and electronics; agro; automotive; polymer.

Consumer-goods lines such as filling, packing and conveying run through the day shift, so a roof plant produces when the load is already there.

The sizing question is how much the lines run on Sundays and shutdown days, because surplus on those days depends on the connection.

Projects

Other plants on the list

Also in Jalgaon

Elsewhere in Maharashtra

Other plants on metal sheet roofs

Common questions

What people ask about this plant

What does 517 kWp mean for the plant?

Two figures describe the Marico plant: 517 kWp on the module side and 400 kW (AC) on the inverter side. As a ratio that is 1.29: the array is rated above the inverters, which cap what the plant can feed the site at any moment.

How is the plant at Jalgaon mounted?

Metal sheet, per the list. On a roof like that the mounting is chosen per roof, and sheet condition is checked before any module goes on.

Is Jalgaon within your reach for a new plant?

Yes. 2 plants are listed for Jalgaon, among 44 in Maharashtra. The free 7-day feasibility study needs only your town and a typical monthly bill.

Free feasibility study

Want a 517 kWp plant on your own site?

Tell us the roof type and last year's bills. An engineer gets back within 48 hours. The 7-day feasibility study costs nothing.

Call us+91 22 4618 3484Get a free feasibility study