Project · Maharashtra

MDB Chemicals – Pune: 400 kWp metal sheet rooftop solar in Maharashtra

Generating since Oct 2024. MDB Chemicals bought the plant under CAPEX and owns it. It is one of 2 MDB Chemicals plants on our project list.

Capacity
400 kWp
Installation
Metal sheet roof
Location
Pune, Maharashtra
Finance model
CAPEX

This plant at a glance

Client
MDB Chemicals
Industry
Chemicals
Capacity
400 kWp (DC), with 300 kW (AC) of inverters
Service
EPC + O&M
Commissioned
Oct 2024
Status
Operational. Built and maintained by Adhvanik Energy; owned by the client.

A 400 kWp plant sits in the middle of the range we list: several inverters, on one site's roofs. Its 400 kWp of modules feed 300 kW of inverters, a DC/AC ratio of 1.33.

MDB Chemicals – Pune began supplying the site in Oct 2024. With a full year on record, a month that falls short of the same month last year stands out. Oct 2024 falls as the monsoon ends.

Closest in capacity on the list: AQ Inductive Components – Pune (400 kWp). AQ Inductive Components – Pune (400 kWp) and MDB Chemicals – Jalgaon (176 kWp) were also commissioned in Oct 2024. In Maharashtra, in order of commissioning, Horiba – Nagpur comes before it and MDB Chemicals – Jalgaon after.

Engineering

How a 400 kWp plant is put together

Metal sheet is a light roof, and a 400 kWp array adds weight and wind load to purlins that were sized for the sheet alone. On a roof like this one in Pune, a structural engineer confirms the roof can take the load, and the structure is designed for the wind speed under IS 875.

Before modules go on a sheet roof like the one at MDB Chemicals – Pune, the roof assessment covers sheet age and corrosion and any turbo ventilators or skylights, and a structural engineer confirms the purlins. A leaking bay is re-sheeted first, because lifting modules off a roof later costs more than doing the job beforehand.

On Asset Connect, a 400 kWp plant is read month on month: generation, irradiance and fault alerts, with performance ratio showing whether soiling or a fault is costing units.

Finance model

Who owns the plant, and who runs it

At the plant the client carried the capital cost of the 400 kWp plant, which makes it a CAPEX project. The generation is the client's from the first unit, offsetting what the site would buy from its distribution company.

Compared with a PPA, CAPEX needs money up front and leaves the plant with the owner. Ask for both prices on the same roof.

Pune

Pune and the chemicals sector

Solar resource here
1,920 kWh/m² a yearAbout 1,590 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Pune; a roof plant at roof tilt differs.
Capacity range
250 to 500 kWp400 kWp here. 36 plants on our list are in this range.
Type of installation
Metal sheet roofThe most common factory roof.
Finance option
CAPEXThe factory owns the plant from day one.

We list 12 plants in Pune, and the MDB Chemicals plant is one of them. The named sectors are automotive; electrical and electronics; polymer; chemicals; steel and metals.

Pune is covered on the page for Pune and its MIDC estates, which lists 12 plants.

Maharashtra has 44 projects on the list, across 17 towns. By roof, 40 on metal sheet roofs, 1 on Carport, 1 on Carport + RCC, 1 on ground mount and 1 on RCC.

Chemical works run reactors, pumps and utilities through long hours, so daytime demand is high and steady.

The roof assessment checks roof exposure to process emissions and the position of vents, which affect module cleaning and long-term soiling.

Projects

Other plants on the list

Also in Pune

Elsewhere in Maharashtra

Other plants on metal sheet roofs

Common questions

The MDB Chemicals – Pune plant: questions and answers

What does 400 kWp mean for this Pune plant?

The plant has 400 kWp of modules (DC) feeding 300 kW of inverters (AC). Modules are quoted in kWp and inverters in kW. The modules exceed the inverter rating by about 33%, a DC/AC ratio of 1.33.

What does the roof mean for the 400 kWp plant at Pune?

It is on metal sheet. The mounting follows OEM installation guidelines, and the structure is designed for the wind speed under IS 875.

Do you build plants in Maharashtra?

Yes. 12 plants are listed for Pune, among 44 in Maharashtra. The free 7-day feasibility study needs only your town and a typical monthly bill.

Free feasibility study

Want a 400 kWp plant on your own site?

Send your Maharashtra town and monthly bill. An engineer replies within 48 hours, and the 7-day study is free.

Call us+91 22 4618 3484Get a free feasibility study