Maharashtra
Industrial rooftop solar in Pune
Pune is the deepest cluster in our project list: 12 plants listed here, across 5 named sectors, commissioned between 2021 and 2026. A few customers have more than one plant listed.
- projects listed here in Pune
- 12
- plant on a PPA
- 1
- industries named
- 5
- most recent commissioning
- Feb 2026
The industrial belt
MIDC estates around Pune
Pune district's industrial estates include the MIDC areas at Chakan, Talegaon and Ranjangaon. Chakan, about 30 km from the city, is widely described as an automobile hub. Our project list names the city, Pune, rather than the estate, so we do not attach a plant to a specific estate here.
A buying conversation in this belt turns on the roof, the connection and the contract: how old the sheet is, how much of the day the plant runs, and whether capital or a PPA suits the balance sheet.
Sources: Chakan, Maharashtra (opens in a new tab), Maharashtra Industrial Development Corporation (opens in a new tab). As of Nov 2026.
Our plants here
Pune plants: repeat customers and an extension
The 12 Pune plants listed here span automotive, electrical and electronics, polymer, chemicals and steel and metals, and a few tagged as general industrial. By roof: 12 on metal sheet roofs. Of the plants we built, 9 were CAPEX and 1 was PPA / OPEX (the model is not recorded for 1).
Several customers have more than one plant listed: two entries under one polymer company's name were commissioned eight days apart, and one auto-component entry is labelled an extension of an earlier plant.
Projects
Plants listed in Pune
Newest first.
1,000 kWp
Mitsubishi Electric – Pune
Maharashtra
Commissioned Feb 2026
- 100 kWp
NDR Warehousing – Pune
Maharashtra
Commissioned Dec 2025
- 843 kWp
Victora Industries – Pune
Maharashtra
Commissioned Jul 2025
- 400 kWp
AQ Inductive Components – Pune
Maharashtra
Commissioned Oct 2024
- 400 kWp
MDB Chemicals – Pune
Maharashtra
Commissioned Oct 2024
- 1,238 kWp
Atomberg – Pune
Maharashtra
Commissioned Jun 2024
- 800 kW (AC)
ArcelorMittal Nippon Steel – Pune
Maharashtra
Commissioned Apr 2024
- 166 kWp
UCC – Pune, 166 kWp
Maharashtra
Commissioned Nov 2023
196 kWp
Ronch Polymer – Pune, 196 kWp
Maharashtra
Commissioned Jan 2022
332 kWp
Ronch Polymer – Pune, 332 kWp
Maharashtra
Commissioned Jan 2022
- 310 kWp
UCC – Pune, 310 kWp
Maharashtra
Commissioned Jun 2021
- 270 kWp
MTC – Pune
Maharashtra
Commissioned May 2021
What to check first
Extensions and old sheets: checks for Pune
- 01
Extension or new roof
If you already have solar, ask whether the next roof should be designed to share monitoring and metering.
Solar O&M and AMC - 02
Plant age and sheet condition
Older sheds may need a structural check before an array goes on.
Metal sheet roof solar - 03
Rules for your connection
Surplus-power treatment depends on the state's current rules. Read them for your connection before you size.
Maharashtra solar policy
Guides and glossary
Guides and terms for Pune factories
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Reading your electricity bill: the numbers that matter for solarRead the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
Terms used on this page
Do you build in Chakan, Talegaon and Ranjangaon?
Our Pune projects are listed under the city, so no plant is tied to a named estate. If your factory is in one of the MIDC estates around Pune, give us your town and average monthly bill; that is all the free 7-day feasibility study needs to begin.
Which Pune sectors have you worked in?
Automotive, electrical and electronics, polymer, chemicals and steel and metals, plus plants tagged as general industrial. Each one is in the projects section above.
Can you add a plant to a roof that already has solar?
Yes. Pune has several multi-phase sites in our list. Tell us the existing plant's make and capacity, and who maintains it, and the design starts from what is already there.
Should a Pune factory choose CAPEX or a PPA?
Both are in the Pune list. Of the plants we built, 9 were CAPEX and 1 was PPA / OPEX (the model is not recorded for 1). The choice turns on whether you want the plant on your balance sheet or want to pay only for the electricity it generates; the study gives you an ROI sheet and a budgetary quote for your Pune roof.
Who covers Pune for site visits and enquiries?
Our team includes people based in Pune. Whatever your town, the first step is the same: your location and a recent electricity bill. An engineer replies within 48 hours.
Free feasibility study
Extending a Pune plant or starting a new roof?
The feasibility study is free, takes 7 days and carries no commitment. An engineer replies within 48 hours.
What the study covers
- Financial ROI sheet based on a preliminary design
- Policy check for your state and connection
- Roof feasibility and the area available for installation