Generating since Nov 2023. HUL bought the plant under CAPEX and owns it. It is one of 11 HUL plants on our project list.
- Capacity
- 160 kWp
- Installation
- RCC
- Location
- Kandla, Gujarat
- Finance model
- CAPEX
Size, roof and finance model
- Client
- HUL
- Industry
- FMCG
- Capacity
- 160 kWp (DC), with 150 kW (AC) of inverters
- Service
- EPC + O&M
- Commissioned
- Nov 2023
- Status
- Operational. Built and maintained by Adhvanik Energy; owned by the client.
HUL – Kandla is a small plant by the standard of the list: 160 kWp, one roof or one block. Its 160 kWp of modules feed 150 kW of inverters, a DC/AC ratio of 1.07.
Commissioned in Nov 2023, the plant has several seasons of data. The question now is whether performance ratio has held steady. Nov 2023 came just after the monsoon, a clear-sky start.
The plant closest to it in size on our list is West Coast – Surat (162 kWp). UCC – Pune (166 kWp, Maharashtra) and Dabur – Rudrapur (1,000 kWp, Uttarakhand) were also commissioned in Nov 2023. In Gujarat, in order of commissioning, Arihant Gold Plast – Sarigam comes before it and Terex – Gujarat after.
More on the area: Gujarat. It is also listed in the full project list.
Engineering
How a 160 kWp plant is put together
A concrete roof carries a plant in a different way from sheet. Wind does not lift it as it lifts a light roof, but the slab has a weight limit and a waterproofing membrane that the structure must not break. For a 160 kWp plant in Kandla, those two checks come before the layout.
Access is planned with the array: paths between rows, water points for cleaning, a safe stair or fixed ladder, and cable trays kept off walkways. A concrete roof is often shared with tanks and HVAC units, so the layout leaves them reachable.
On Asset Connect, a 160 kWp plant is read month on month: generation, irradiance and fault alerts, with performance ratio showing whether soiling or a fault is costing units.
Finance model
How the plant is paid for
Under CAPEX the owner buys the plant outright and controls it for its whole life. That suits a company with capital to deploy and a long horizon at the site, which describes the client at the plant since Nov 2023.
Compared with a PPA, CAPEX needs money up front and leaves the plant with the owner. Ask for both prices on the same roof.
Kandla
Where HUL – Kandla sits on our list
- Solar resource here
- 2,066 kWh/m² a yearAbout 1,746 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Kandla; a roof plant at roof tilt differs.
- Capacity range
- Under 250 kWp160 kWp here. 33 plants on our list are in this range.
- Type of installation
- RCCA flat concrete slab, ballasted or anchored.
- Finance option
- CAPEXThe factory owns the plant from day one.
The list has one plant in Kandla, and this is it.
Across Gujarat our list holds 12 plants in 7 towns, commissioned between 2022 and 2026.
Consumer-goods lines such as filling, packing and conveying run through the day shift, so a roof plant produces when the load is already there.
The sizing question is how much the lines run on Sundays and shutdown days, because surplus on those days depends on the connection.
Sector page: FMCG solar. Rules for Gujarat: solar policy.
Projects
Other plants on the list
Elsewhere in Gujarat
- MYK Laticrete – Vadodara450 kWp · Metal sheet roof · Sep 2026
- Zeeta Electrical – Sanand519 kWp · Metal sheet roof · Aug 2026
- West Coast – Surat, 162 kWpMetal sheet roof · Jun 2026
- Shrotra Enterprises – Sarigam1,300 kWp · Metal sheet roof · Aug 2025
Other plants on RCC roofs
- Plastiblends – Roorkee300 kWp · RCC · Apr 2024
- Legrand – Haridwar537 kWp · RCC · Jan 2024
- HUL – Nalagarh46 kWp · RCC · Jul 2023
- FDC – Baddi332 kWp · RCC · Sep 2021
Common questions
What people ask about this plant
What does 160 kWp mean for the HUL plant?
This Kandla plant has 160 kWp of modules (DC) feeding 150 kW of inverters (AC). Modules are quoted in kWp and inverters in kW. As a ratio that is 1.07: the array is rated above the inverters, which cap what the plant can feed the site at any moment.
How is the plant at Kandla mounted?
RCC, according to the list. Slab load, membrane condition and rainwater outlets set how the 160 kWp is laid out.
Is Kandla within your reach for a new plant?
Yes. One plant is listed for Kandla, among 12 in Gujarat. The free 7-day feasibility study needs only your town and a typical monthly bill.
Guides and glossary
Guides and terms behind a 160 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Performance ratio (PR): how to judge a plant after commissioningRead the guide
Terms used on this page
Free feasibility study
Want a 160 kWp plant on your own site?
Tell us the roof type and last year's bills. An engineer gets back within 48 hours. The 7-day feasibility study costs nothing.