Project · Maharashtra

AQ Inductive Components – Pune: 400 kWp metal sheet rooftop solar in Maharashtra

Adhvanik Energy owns and runs it, and AQ Inductive Components pays for each unit the plant generates, under a PPA. The plant has supplied the site since Oct 2024.

Capacity
400 kWp
Installation
Metal sheet roof
Location
Pune, Maharashtra
Finance model
PPA / OPEX

Plant details

Client
AQ Inductive Components
Capacity
400 kWp (DC), with 300 kW (AC) of inverters
Service
EPC + O&M
Commissioned
Oct 2024
Status
Operational. Owned and run by Adhvanik Energy.

At 400 kWp, the plant covers a sizeable share of a factory roof, usually split across a few inverters. The array is 33% larger than the inverters, a DC/AC ratio of 1.33.

Running since Oct 2024, the plant has been through a summer and a monsoon. Its seasonal pattern is now visible. Its first readings, in Oct 2024, followed the rains.

The plant closest to it in size on our list is MDB Chemicals – Pune (400 kWp). Oct 2024 also saw MDB Chemicals – Jalgaon (176 kWp) and ArcelorMittal Nippon Steel – Bahadurgarh (600 kWp, Haryana) commissioned. Of the Maharashtra plants on our list, MDB Chemicals – Jalgaon was commissioned just before it and Radiant Indus Chem – Aurangabad just after.

Engineering

What a metal sheet rooftop plant involves

The 400 kWp at AQ Inductive Components – Pune sits on metal sheet roofing. In many cases the structure is fixed through the sheet; where the owner wants a zero-leakage roof, the mounting is non-penetrating, with clamps that grip the ribs or seams or adhesive bonding of the rails.

Walkways and safety lines matter more on sheet than on concrete, since a sheet that was never meant for foot traffic can crack underfoot. A 400 kWp array is laid out with fixed walkways so cleaning crews and O&M engineers stay on structure.

Most losses at a working plant are small and gradual, such as a loose connector, built-up dust or a midday inverter trip, and monitoring and inspection find them early.

Finance model

What PPA / OPEX means here

The AQ Inductive Components plant gets its solar through a PPA: 400 kWp on its site, owned by Adhvanik Energy and paid for per unit generated, at the tariff in the contract.

Because we own the plant, we carry its performance: our O&M team runs it, and its output is what the contract is priced on. PPAs run 5 to 25 years.

Pune

The area around AQ Inductive Components – Pune

Solar resource here
1,920 kWh/m² a yearAbout 1,590 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Pune; a roof plant at roof tilt differs.
Capacity range
250 to 500 kWp400 kWp here. 36 plants on our list are in this range.
Type of installation
Metal sheet roofThe most common factory roof.
Finance option
PPA / OPEXNo capital from the factory: it pays per unit generated.

We list 12 plants in Pune, and this Pune plant is one of them. Sectors named there: automotive; electrical and electronics; polymer; chemicals; steel and metals.

Pune is covered on the page for Pune and its MIDC estates, which lists 12 plants.

In Maharashtra the list shows 44 projects in 17 towns. Named sectors include electrical and electronics; agro; automotive; polymer.

Projects

More plants near Pune

Also in Pune

Elsewhere in Maharashtra

Other plants on metal sheet roofs

Common questions

The AQ Inductive Components – Pune plant: questions and answers

What is the commissioning date of the AQ Inductive Components – Pune plant?

Our list records Oct 2024.

Who looks after the 400 kWp plant at Pune?

Under the PPA the plant is ours and so is its upkeep. The client at the AQ Inductive Components plant buys the electricity it produces at the tariff set in the contract.

Could a plant like this Pune plant fit my factory?

Only a check of your own site can say. The free 7-day feasibility study covers roof feasibility and the area available, a financial ROI sheet and a budgetary quote.

Free feasibility study

Plan a plant for your own Maharashtra site

Tell us the roof type and last year's bills. An engineer gets back within 48 hours. The 7-day feasibility study costs nothing.

Call us+91 22 4618 3484Get a free feasibility study