Project · Maharashtra
Mahyco – Jalna: 1,119 kWp RCC rooftop solar in Maharashtra
Mahyco bought the plant under CAPEX and owns it. The plant has supplied the site since Jan 2026. It is one of 2 Mahyco plants on our project list.
- Capacity
- 1,119 kWp
- Installation
- RCC
- Location
- Jalna, Maharashtra
- Finance model
- CAPEX
Size, roof and finance model
- Client
- Mahyco
- Industry
- Agro
- Capacity
- 1,119 kWp (DC), with 825 kW (AC) of inverters
- Service
- EPC + O&M
- Commissioned
- Jan 2026
- Status
- Operational. Built and maintained by Adhvanik Energy; owned by the client.
At 1,119 kWp, the plant is among the largest plants on our list, and the structural check, cable route and connection point drive the design. Its 1,119 kWp of modules feed 825 kW of inverters, a DC/AC ratio of 1.36.
The Mahyco plant began supplying the site in Jan 2026. With a full year on record, a month that falls short of the same month last year stands out. Jan 2026 falls in the short-day season.
For scale, the nearest match in capacity is HUL – Haridwar (1,126 kWp, Uttarakhand). Jan 2026 also saw Britannia – Guwahati (1,700 kWp, Assam) and Pidilite – Kala Amb (312 kWp, Himachal Pradesh) commissioned. Of the Maharashtra plants on our list, NDR Warehousing – Pune was commissioned just before it and Mitsubishi Electric – Pune just after.
On the location pages: Maharashtra. It is also listed in the filterable project list.
Engineering
The engineering behind a plant like Mahyco – Jalna
On a slab like the one at Mahyco – Jalna, rows are tilted for yield and spaced so they do not shade one another between about 9 am and 3 pm, even in December. Parapets, water tanks and lift rooms are modelled first, because their shadows cut the usable area.
Parapets and tanks cast long shadows in December, when the sun is low. Rows on a slab like this are spaced for that month, so winter shading does not cut output below what the design assumed.
On Asset Connect, a 1,119 kWp plant is read month on month: generation, irradiance and fault alerts, with performance ratio showing whether soiling or a fault is costing units.
Finance model
Who owns the plant, and who runs it
At this Jalna plant the client carried the capital cost of the 1,119 kWp plant, which makes it a CAPEX project. The generation is the client's from the first unit, offsetting what the site would buy from its distribution company.
A finance head weighing CAPEX against a PPA asks how much capital to commit, how long the plant will run and who will look after it.
Jalna
Agro plants in Maharashtra
- Solar resource here
- 1,923 kWh/m² a yearAbout 1,597 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Jalna; a roof plant at roof tilt differs.
- Capacity range
- 1,000 kWp and above1,119 kWp here. 19 plants on our list are in this range.
- Type of installation
- RCCA flat concrete slab, ballasted or anchored.
- Finance option
- CAPEXThe factory owns the plant from day one.
No other plant in Jalna is on our published list yet, so the plant is the town's one record here.
Maharashtra has 44 projects on the list, across 17 towns. By roof, 40 on metal sheet roofs, 1 on Carport, 1 on Carport + RCC, 1 on ground mount and 1 on RCC.
Seed, feed and farm-equipment sites have seasonal demand, and a solar plant has to be sized for the months when power is used.
Agro works have open land around the buildings, which gives the option of a ground plant beside a roof plant.
Sector page: Agro & food processing solar. Rules for Maharashtra: solar policy.
Projects
Related plants
Elsewhere in Maharashtra
- Exotic Fruits – Nashik1,332 kWp · Metal sheet roof · Jul 2026
- Baramati Cattlefeeds – Baramati771 kWp · Metal sheet roof · Jul 2026
- FUSO Glass – Murbad926 kWp · Metal sheet roof · Jul 2026
- Ozpure – Maharashtra867 kWp · Metal sheet roof · Jul 2026
Other plants on RCC roofs
- HUL – Nalagarh46 kWp · RCC · Jul 2023
- FDC – Baddi332 kWp · RCC · Sep 2021
- Pearl Global – Bengaluru637 kWp · RCC · Mar 2026
- Plastiblends – Roorkee300 kWp · RCC · Apr 2024
Common questions
The Mahyco – Jalna plant: questions and answers
What is the commissioning date of the Mahyco – Jalna plant?
Our list records Jan 2026.
Who looks after the 1,119 kWp plant at Jalna?
The client owns it, because this Jalna plant was financed as CAPEX. Adhvanik Energy built the plant and maintains it under an O&M contract.
Can the Mahyco – Jalna design be repeated at my site?
Only a check of your own site can say. The free 7-day feasibility study covers roof feasibility and the area available, a financial ROI sheet and a budgetary quote.
Guides and glossary
Guides and terms behind a 1,119 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Performance ratio (PR): how to judge a plant after commissioningRead the guide
Terms used on this page
Free feasibility study
Plan a plant for your own Maharashtra site
Tell us the roof type and last year's bills. An engineer gets back within 48 hours. The 7-day feasibility study costs nothing.