Project · Himachal Pradesh
Pidilite – Kala Amb: 537 kWp metal sheet rooftop solar in Himachal Pradesh
Pidilite bought the plant under CAPEX and owns it. The plant has supplied the site since Jan 2026. It is one of 5 Pidilite plants on our project list.
- Capacity
- 537 kWp
- Installation
- Metal sheet roof
- Location
- Kala Amb, Himachal Pradesh
- Finance model
- CAPEX
Plant details
- Client
- Pidilite
- Industry
- Chemicals
- Capacity
- 537 kWp (DC), with 450 kW (AC) of inverters
- Service
- EPC + O&M
- Commissioned
- Jan 2026
- Status
- Operational. Built and maintained by Adhvanik Energy; owned by the client.
A 537 kWp plant needs a big roof or plot, and its structural check, shade analysis and connection point take longer than a small plant's. Its 537 kWp of modules feed 450 kW of inverters, a DC/AC ratio of 1.19.
With a commissioning month of Jan 2026, the plant has a year or more of readings, enough to compare each month with the same month a year earlier. Jan 2026 falls in the short-day season.
The plant closest to it in size on our list is Legrand – Haridwar (537 kWp, Uttarakhand). Jan 2026 also saw Mahyco – Jalna (1,119 kWp, Maharashtra) and Pidilite – Kala Amb (312 kWp) commissioned. Of the Himachal Pradesh plants on our list, Pidilite – Kala Amb, 205 kWp was commissioned just before it and Pidilite – Kala Amb, 312 kWp just after.
Solar in the area: Himachal Pradesh · Baddi and Kala Amb. Find this plant in the projects index.
Engineering
What a metal sheet rooftop plant involves
The 537 kWp at Pidilite – Kala Amb sits on metal sheet roofing. In many cases the structure is fixed through the sheet; where the owner wants a zero-leakage roof, the mounting is non-penetrating, with clamps that grip the ribs or seams or adhesive bonding of the rails.
On a long shed, a short, tidy cable route on trays, from array to inverters to LT panel, saves losses and maintenance time over the life of the plant.
Most losses at a working plant are small and gradual, such as a loose connector, built-up dust or a midday inverter trip, and monitoring and inspection find them early.
Finance model
What CAPEX means here
The plant was financed as CAPEX: the client paid for the plant and owns it from day one. Every unit it generates replaces a unit bought from the grid, and the saving is the client's.
We design, procure, build and commission a CAPEX plant, then hand it over. A 1-year defect liability period covers the entire installation, we handle manufacturer warranty claims, and the owner can sign an O&M contract of up to 25 years.
Kala Amb
Where Pidilite – Kala Amb sits on our list
- Solar resource here
- 1,752 kWh/m² a yearAbout 1,531 kWh per kWp a year for a standard tilted system; January is the weakest month. Global Solar Atlas estimate for Kala Amb; a roof plant at roof tilt differs.
- Capacity range
- 500 to 1,000 kWp537 kWp here. 38 plants on our list are in this range.
- Type of installation
- Metal sheet roofThe most common factory roof.
- Finance option
- CAPEXThe factory owns the plant from day one.
Kala Amb is a repeat location on the list, with 3 plants listed. The sector named there is chemicals.
Kala Amb is covered on the page for Baddi and Kala Amb, which lists 6 plants.
Himachal Pradesh has 7 projects on the list, across 3 towns. By roof, 5 on metal sheet roofs and 2 on RCC.
Process plants in chemicals draw power around the clock, and the daytime share is what a roof plant can serve.
RCC blocks and sheds both appear in chemical works, and the plant is placed where the roof is clear of vents and process stacks.
Sector pages: industries we work with. Rules for Himachal Pradesh: solar policy.
Projects
Related plants
Also in Kala Amb
- Pidilite – Kala Amb, 312 kWpMetal sheet roof · Jan 2026
- Pidilite – Kala Amb, 205 kWpMetal sheet roof · Jan 2026
Elsewhere in Himachal Pradesh
- Pidilite – Baddi, 227 kWpMetal sheet roof · Dec 2025
- HUL – Nalagarh46 kWp · RCC · Jul 2023
Other plants on metal sheet roofs
- Arihant Gold Plast – Sarigam274 kWp · Metal sheet roof · Sep 2022
- Lemken – Nagpur477 kWp · Metal sheet roof · Jul 2022
- Arihant Auto – Aurangabad162 kWp · Metal sheet roof · May 2022
- Legrand – Sinnar, 508 kWpMetal sheet roof · Apr 2022
Common questions
The Pidilite – Kala Amb plant: questions and answers
When was the Pidilite plant commissioned?
Our list records Jan 2026. With a full year on record, a month that falls short of the same month last year stands out.
Who maintains the plant?
Under CAPEX the client owns the Pidilite plant. Adhvanik Energy built it, and our O&M team handles the day-to-day upkeep.
How do I find out if my roof can carry 537 kWp?
Only a check of your own site can say. The free 7-day feasibility study covers roof feasibility and the area available, a financial ROI sheet and a budgetary quote.
Guides and glossary
Guides and terms behind a 537 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Behind-the-meter or net metering: which suits your site?Read the guide
Terms used on this page
Free feasibility study
Plan a plant for your own Himachal Pradesh site
A 537 kWp plant is one data point. The free 7-day study gives you the numbers for your own site.