Project · Himachal Pradesh
HUL – Nalagarh: 46 kWp RCC rooftop solar in Himachal Pradesh
Generating since Jul 2023. HUL bought the plant under CAPEX and owns it. It is one of 11 HUL plants on our project list.
- Capacity
- 46 kWp
- Installation
- RCC
- Location
- Nalagarh, Himachal Pradesh
- Finance model
- CAPEX
This plant at a glance
- Client
- HUL
- Industry
- FMCG
- Capacity
- 46 kWp (DC), with 40 kW (AC) of inverters
- Service
- EPC + O&M
- Commissioned
- Jul 2023
- Status
- Operational. Built and maintained by Adhvanik Energy; owned by the client.
HUL – Nalagarh is a small plant by the standard of the list: 46 kWp, one roof or one block. Its 46 kWp of modules feed 40 kW of inverters, a DC/AC ratio of 1.15.
Since Jul 2023, the plant in Nalagarh has run through several monsoons. That history is the first thing an O&M review reads. Jul 2023 falls in the monsoon.
The plant closest to it in size on our list is Soma Resort – Nashik (50 kWp, Maharashtra). In Himachal Pradesh, in order of commissioning, FDC – Baddi comes before it and Pidilite – Baddi, 97 kWp after.
More on the area: Himachal Pradesh. It is also listed in the projects index.
Engineering
What a RCC rooftop plant involves
A concrete roof carries a plant in a different way from sheet. Wind does not lift it as it lifts a light roof, but the slab has a weight limit and a waterproofing membrane that the structure must not break. For a 46 kWp plant in Nalagarh, those two checks come before the layout.
Access is planned with the array: paths between rows, water points for cleaning, a safe stair or fixed ladder, and cable trays kept off walkways. A concrete roof is often shared with tanks and HVAC units, so the layout leaves them reachable.
Asset Connect keeps generation, irradiance and alerts in one place, and a drop in performance ratio is the first sign that a string, an inverter or the module surface needs attention.
Finance model
How the plant is paid for
CAPEX is the model where the client buys the plant. For HUL – Nalagarh, that means the 46 kWp system is the client's property since Jul 2023, with the savings and the upkeep decisions on the client's side.
CAPEX suits a company that plans to stay at a site for the life of the plant. Our financing page compares it with PPA / OPEX.
Nalagarh
FMCG plants in Himachal Pradesh
- Solar resource here
- 1,718 kWh/m² a yearAbout 1,500 kWh per kWp a year for a standard tilted system; January is the weakest month. Global Solar Atlas estimate for Nalagarh; a roof plant at roof tilt differs.
- Capacity range
- Under 250 kWp46 kWp here. 33 plants on our list are in this range.
- Type of installation
- RCCA flat concrete slab, ballasted or anchored.
- Finance option
- CAPEXThe factory owns the plant from day one.
No other plant in Nalagarh is on our published list yet, so the plant is the town's one record here.
Himachal Pradesh has 7 projects on the list, across 3 towns. By roof, 5 on metal sheet roofs and 2 on RCC.
Consumer-goods lines such as filling, packing and conveying run through the day shift, so a roof plant produces when the load is already there.
The sizing question is how much the lines run on Sundays and shutdown days, because surplus on those days depends on the connection.
Sector page: FMCG solar. Rules for Himachal Pradesh: solar policy.
Projects
Other plants on the list
Elsewhere in Himachal Pradesh
- Pidilite – Kala Amb, 312 kWpMetal sheet roof · Jan 2026
- Pidilite – Baddi, 227 kWpMetal sheet roof · Dec 2025
Other plants on RCC roofs
- FDC – Baddi332 kWp · RCC · Sep 2021
- Pearl Global – Bengaluru637 kWp · RCC · Mar 2026
- Mahyco – Jalna1,119 kWp · RCC · Jan 2026
- Plastiblends – Roorkee300 kWp · RCC · Apr 2024
Common questions
The HUL – Nalagarh plant: questions and answers
What does 46 kWp mean for the HUL plant?
Two figures describe this Nalagarh plant: 46 kWp on the module side and 40 kW (AC) on the inverter side. The modules exceed the inverter rating by about 15%, a DC/AC ratio of 1.15.
What roof is the plant built on?
RCC, according to the list. Slab load, membrane condition and rainwater outlets set how the 46 kWp is laid out.
Does Adhvanik Energy work near Nalagarh?
Yes. One plant is listed for Nalagarh, among 7 in Himachal Pradesh. The free 7-day feasibility study needs only your town and a typical monthly bill.
Guides and glossary
Guides and terms behind a 46 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Behind-the-meter or net metering: which suits your site?Read the guide
Terms used on this page
Free feasibility study
Find out what your slab can carry
A 46 kWp plant is one data point. The free 7-day study gives you the numbers for your own site.