Case study · Electrical & Electronics

Solar across Legrand plants, engineered roof by roof

Legrand has multiple sites with Adhvanik. Adhvanik Energy built rooftop solar for Legrand India at Nashik, Sinnar and Haridwar, and runs the plants on one monitoring platform.

The challenge

Six roofs, five tilts and two roof profiles at one site

Legrand’s plants with us are at Nashik (1,300 kW), Sinnar (508 kW) and a later Sinnar extension (141 kW), with another at Haridwar. The extension is partly a carport and partly on RCC, to make better use of the space.

At Sinnar, the original 508 kW is split across six roofs with different tilt angles: two at 6°, and the others at 10°, 15°, 20° and 26°. The steeper roofs, at 20° and 26°, are high-risk places to work.

The roof types also varied, standing seam on some roofs and trapezoidal sheet on others. Each needs its own mounting, which added design and procurement complexity.

The solution

How the plant was engineered

  • Safety on every roof

    Adhvanik installed tilted walkways, safety lines and railings on every roof, including the 20° and 26° ones.

  • Designed and bought per roof

    Adhvanik designed, bought and installed the materials roof by roof, for each tilt and each roof profile, with zero deviations and zero reworks.

  • A generation target per roof

    Because of the multi-roof, multi-tilt layout, Adhvanik built a separate PVsyst report for each roof and took the weighted average as the plant’s generation target.

  • Monitoring balanced against cost

    Adhvanik mounted the irradiance sensor flat, so the live performance ratio shows the site average instead of leaning towards one roof. The team looked at a separate weather station for each roof and decided against it: at such small capacities it would cost more than it returns. We weigh technical need against cost the same way on every design.

  • Audited by TÜV India

    Adhvanik also had the Sinnar site audited by TÜV India after commissioning, as an additional layer of quality assurance.

Implementation

How it was delivered

Adhvanik invested in, designed, built and commissioned the Nashik, Sinnar and Haridwar plants, and operates them under the PPA.

Finance model

Adhvanik owns the plant (PPA)

At Sinnar and Haridwar, Legrand chose the PPA model: Adhvanik invests in, owns and runs the plants, and Legrand pays an agreed tariff for each unit they generate, with no upfront investment.

Nashik is set up differently. Adhvanik built the 1,300 kW plant, but its owner is the investor who owns the shed, not Adhvanik.

Compare PPA with the other finance models

Results

Legrand India plants on our published list

From our commissioning records. Capacity is DC (kWp) unless marked AC.
PlantLocationRoof / configurationFinance modelCapacityCommissioned
Legrand – NashikNashik, MaharashtraMetal sheet roofPPA (investor-owned)1,300 kWpMay 2026
Legrand – Sinnar, 508 kWpSinnar, MaharashtraMetal sheet roofPPA / OPEX508 kWpApr 2022
Legrand – Sinnar, 141 kWpSinnar, MaharashtraCarport + RCCPPA / OPEX141 kWpMay 2025
Legrand – HaridwarHaridwar, UttarakhandRCCPPA / OPEX537 kWpJan 2024
Legrand – Sinnar
Modules: Canadian Solar 450 Wp, Mono PERCInverters: Sungrow 33 kW, 40 kW, 50 kW and 100 kW units
Legrand – Haridwar
Modules: Longi 540 Wp bifacialInverters: Growatt 25 kW and 125 kW units

Performance

Performance ratio, year by year

Performance ratio (PR) by financial year, from our monitoring records. NA: not available for that year.
YearLegrand SinnarLegrand HaridwarLegrand Sinnar ext.
2022–2378.03%NANA
2023–2479.24%NANA
2024–2578.38%68.87%NA
2025–2672.78%72.38%72.75%
  • Why Sinnar dipped in 2025–26

    In Year 4 of Sinnar’s operation the PR dropped 6%, because a 25 kW section was shut down for three months while the client repaired the roof. The Sinnar extension also faced a DISCOM-mandated shutdown in May 2025, the peak generation month, which further affected that year’s PR.

  • Coal dust at Haridwar

    At Legrand Haridwar, coal dust from a nearby factory left sticky deposits on the panels and hurt first-year generation and PR. Adhvanik cleaned more often and used a special cleaning chemical approved by the module maker, so the modules stayed within warranty terms. PR improved by 4% in year 2.

Photos

From the site

  • Solar plant: Legrand – Sinnar, 141 kWp, Sinnar, MaharashtraLegrand – Sinnar, 141 kWp, Sinnar, Maharashtra
  • Solar plant: Legrand – Haridwar, Haridwar, UttarakhandLegrand – Haridwar, Haridwar, Uttarakhand

Does this match your site?

This approach fits if

  • Your roofs have different tilts or profiles
  • You run plants in more than one location
  • You want one dashboard and one point of contact
  • You plan to add capacity in stages

Related pages

Where to read next

Free feasibility study

Plan solar for plants in several states

The feasibility study is free, takes 7 days and carries no commitment. An engineer replies within 48 hours.

What the study covers

  • Financial ROI sheet based on a preliminary design
  • Policy check for your state and connection