Project · Maharashtra
Durian Industries – Palghar: 525 kWp metal sheet rooftop solar in Maharashtra
Generating since Jun 2025. Durian Industries bought the plant under CAPEX and owns it.

- Capacity
- 525 kWp
- Installation
- Metal sheet roof
- Location
- Palghar, Maharashtra
- Finance model
- CAPEX
Size, roof and finance model
- Client
- Durian Industries
- Capacity
- 525 kWp (DC), with 400 kW (AC) of inverters
- Service
- EPC + O&M
- Commissioned
- Jun 2025
- Status
- Operational. Built and maintained by Adhvanik Energy; owned by the client.
525 kWp puts the plant in the larger group on the list, usually with several inverters sharing the load. 400 kW of inverters serve 525 kWp of modules: a DC/AC ratio of 1.31.
With a commissioning month of Jun 2025, the plant has a year or more of readings, enough to compare each month with the same month a year earlier. Jun 2025 falls in the monsoon.
For scale, the nearest match in capacity is Balmer Lawrie – Selaqui (530 kWp, Uttarakhand). MYK Laticrete – Indore (405 kWp, Madhya Pradesh) was also commissioned in Jun 2025. In Maharashtra, in order of commissioning, Zenith Irrigation – Nashik comes before it and Victora Industries – Pune after.
On the location pages: Maharashtra · Mumbai, Palghar, Boisar, Bhiwandi and Murbad. Find this plant in the full project list.
On site
4 photos and a video clip from the plant. Select one to enlarge.
Engineering
What a metal sheet rooftop plant involves
A shed roof in Palghar gives a 525 kWp plant plenty of room, but it asks more of the structure than a slab does. Sheet profile, purlin spacing and design wind speed decide how the rails are fixed, and the fixing has to leave the sheet watertight.
Before modules go on a sheet roof like the one at Durian Industries – Palghar, the roof assessment covers sheet age and corrosion and any turbo ventilators or skylights, and a structural engineer confirms the purlins. A leaking bay is re-sheeted first, because lifting modules off a roof later costs more than doing the job beforehand.
Asset Connect keeps generation, irradiance and alerts in one place, and a drop in performance ratio is the first sign that a string, an inverter or the module surface needs attention.
Finance model
How the plant is paid for
At the Durian Industries plant the client carried the capital cost of the 525 kWp plant, which makes it a CAPEX project. The generation is the client's from the first unit, offsetting what the site would buy from its distribution company.
A finance head weighing CAPEX against a PPA asks how much capital to commit, how long the plant will run and who will look after it.
Palghar
The area around Durian Industries – Palghar
- Solar resource here
- 1,921 kWh/m² a yearAbout 1,603 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Palghar; a roof plant at roof tilt differs.
- Capacity range
- 500 to 1,000 kWp525 kWp here. 38 plants on our list are in this range.
- Type of installation
- Metal sheet roofThe most common factory roof.
- Finance option
- CAPEXThe factory owns the plant from day one.
We list 2 plants in Palghar, and this Palghar plant is one of them. Its one named sector is packaging and printing.
Palghar is covered on the page for Mumbai, Palghar, Boisar, Bhiwandi and Murbad, which lists 7 plants.
Across Maharashtra our list holds 44 plants in 17 towns, commissioned between 2020 and 2026.
Sector pages: industries we work with. Rules for Maharashtra: solar policy.
Projects
Related plants
Also in Palghar
- Hexagon Prints – Palghar350 kWp · Metal sheet roof · Apr 2025
Elsewhere in Maharashtra
- Exotic Fruits – Nashik1,332 kWp · Metal sheet roof · Jul 2026
- Baramati Cattlefeeds – Baramati771 kWp · Metal sheet roof · Jul 2026
- FUSO Glass – Murbad926 kWp · Metal sheet roof · Jul 2026
- Ozpure – Maharashtra867 kWp · Metal sheet roof · Jul 2026
Other plants on metal sheet roofs
- Siddhi Vinayak Flexipack – Indore515 kWp · Metal sheet roof · Jun 2026
- New Jack Printing – Bhiwandi375 kWp · Metal sheet roof · Jun 2026
- Blink Infra – Sarai Sahjadi300 kWp · Metal sheet roof · Jun 2026
- Blink Infra – Bhokapur125 kWp · Metal sheet roof · Jun 2026
Common questions
The Durian Industries – Palghar plant: questions and answers
How big is the Durian Industries – Palghar plant?
The plant has 525 kWp of modules (DC) feeding 400 kW of inverters (AC). Modules are quoted in kWp and inverters in kW. That is 31% more module capacity than inverter capacity (ratio 1.31), a normal design choice.
What does the roof mean for the 525 kWp plant at Palghar?
The list records a metal sheet roof. On sheet the structure is fixed through the sheet or, for a zero-leakage roof, held by clamps or adhesive, and it is designed for the wind speed under IS 875.
Is Palghar within your reach for a new plant?
Yes. 2 plants are listed for Palghar, among 44 in Maharashtra. The free 7-day feasibility study needs only your town and a typical monthly bill.
Guides and glossary
Guides and terms behind a 525 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Reading your electricity bill: the numbers that matter for solarRead the guide
Terms used on this page
Free feasibility study
Want a 525 kWp plant on your own site?
The free 7-day study gives a site in Palghar an ROI sheet, a policy check, roof feasibility and a budgetary quote. Expect an engineer within 48 hours.