Project · Punjab
HUL – Rajpura: 210 kWp metal sheet rooftop solar in Punjab
Generating since Jul 2026. HUL bought the plant under CAPEX and owns it. It is one of 11 HUL plants on our project list.
- Capacity
- 210 kWp
- Installation
- Metal sheet roof
- Location
- Rajpura, Punjab
- Finance model
- CAPEX
This plant at a glance
- Client
- HUL
- Industry
- FMCG
- Capacity
- 210 kWp (DC), with 175 kW (AC) of inverters
- Service
- EPC + O&M
- Commissioned
- Jul 2026
- Status
- Operational. Built and maintained by Adhvanik Energy; owned by the client.
At 210 kWp, the plant covers a sizeable share of a factory roof, usually split across a few inverters. Its 210 kWp of modules feed 175 kW of inverters, a DC/AC ratio of 1.20.
The plant in Rajpura started supplying the site in Jul 2026. A few months of readings will set its baseline. Its first weeks, in Jul 2026, were monsoon weeks.
For scale, the nearest match in capacity is Pidilite – Kala Amb (205 kWp, Himachal Pradesh). Baramati Cattlefeeds – Baramati (771 kWp, Maharashtra) and FUSO Glass – Murbad (926 kWp, Maharashtra) were also commissioned in Jul 2026.
More on the area: Punjab. Find this plant in the full project list.
Engineering
How a 210 kWp plant is put together
A shed roof in Rajpura gives a 210 kWp plant plenty of room, but it asks more of the structure than a slab does. Sheet profile, purlin spacing and design wind speed decide how the rails are fixed, and the fixing has to leave the sheet watertight.
Before modules go on a sheet roof like the one at HUL – Rajpura, the roof assessment covers sheet age and corrosion and any turbo ventilators or skylights, and a structural engineer confirms the purlins. A leaking bay is re-sheeted first, because lifting modules off a roof later costs more than doing the job beforehand.
Our standard O&M scope has 24 to 26 cleaning cycles a year, more where the dust and the monsoon in Rajpura call for them, with AI-enabled checks on cleaning quality.
Finance model
How the plant is paid for
Under CAPEX the owner buys the plant outright and controls it for its whole life. That suits a company with capital to deploy and a long horizon at the site, which describes the client at the HUL plant since Jul 2026.
We design, procure, build and commission a CAPEX plant, then hand it over. A 1-year defect liability period covers the entire installation, we handle manufacturer warranty claims, and the owner can sign an O&M contract of up to 25 years.
Rajpura
Where HUL – Rajpura sits on our list
- Solar resource here
- 1,741 kWh/m² a yearAbout 1,510 kWh per kWp a year for a standard tilted system; January is the weakest month. Global Solar Atlas estimate for Rajpura; a roof plant at roof tilt differs.
- Capacity range
- Under 250 kWp210 kWp here. 33 plants on our list are in this range.
- Type of installation
- Metal sheet roofThe most common factory roof.
- Finance option
- CAPEXThe factory owns the plant from day one.
This Rajpura plant is the only Rajpura plant on our list.
In Punjab the list shows 1 project in 1 town. Named sectors include FMCG.
Consumer-goods lines such as filling, packing and conveying run through the day shift, so a roof plant produces when the load is already there.
The sizing question is how much the lines run on Sundays and shutdown days, because surplus on those days depends on the connection.
Sector page: FMCG solar.
Projects
Other plants on the list
Other plants on metal sheet roofs
- AQ Inductive Components – Pune400 kWp · Metal sheet roof · Oct 2024
- MDB Chemicals – Pune400 kWp · Metal sheet roof · Oct 2024
- MDB Chemicals – Jalgaon176 kWp · Metal sheet roof · Oct 2024
- Atomberg – Pune1,238 kWp · Metal sheet roof · Jun 2024
Common questions
The HUL – Rajpura plant: questions and answers
What does 210 kWp mean for the plant?
Two figures describe the HUL plant: 210 kWp on the module side and 175 kW (AC) on the inverter side. That is 20% more module capacity than inverter capacity (ratio 1.20), a normal design choice.
What does the roof mean for the 210 kWp plant at Rajpura?
The list records a metal sheet roof. On sheet the structure is fixed through the sheet or, for a zero-leakage roof, held by clamps or adhesive, and it is designed for the wind speed under IS 875.
Does Adhvanik Energy work near Rajpura?
Yes. One plant is listed for Rajpura, among 1 in Punjab. The free 7-day feasibility study needs only your town and a typical monthly bill.
Guides and glossary
Guides and terms behind a 210 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Reading your electricity bill: the numbers that matter for solarRead the guide
Terms used on this page
Free feasibility study
Want a 210 kWp plant on your own site?
A 210 kWp plant is one data point. The free 7-day study gives you the numbers for your own site.