HUL – Orai: 1,131 kWp ground-mount solar in Uttar Pradesh

HUL bought the plant under CAPEX and owns it. The plant has supplied the site since Apr 2022. It is one of 11 HUL plants on our project list.

Capacity
1,131 kWp
Installation
Ground mount
Location
Orai, Uttar Pradesh
Finance model
CAPEX

Plant details

Client
HUL
Industry
FMCG
Capacity
1,131 kWp (DC), with 1,100 kW (AC) of inverters
Service
EPC + O&M
Commissioned
Apr 2022
Status
Operational. Built and maintained by Adhvanik Energy; owned by the client.

From 1,000 kW of capacity upward, a plant is usually built in many blocks, each with its own inverter. The plant is in that class. Its 1,131 kWp of modules and 1,100 kW of inverters make a DC/AC ratio of 1.03, almost one to one.

The HUL plant has run since Apr 2022. Module degradation and wear on inverters and cables now show in the record. Apr 2022 falls in the hot season.

The plant closest to it in size on our list is HUL – Haridwar (1,126 kWp, Uttarakhand). Apr 2022 also saw Legrand – Sinnar (508 kWp, Maharashtra) commissioned. Its nearest neighbour in Uttar Pradesh, in order of commissioning, is Blink Infra – Gaddipur.

Engineering

How a 1,131 kWp plant is put together

Ground mount uses land the factory is not otherwise using. The first design decisions on a ground plant are about layout: row spacing for winter sun, internal roads, fire access and the path of stormwater.

Vegetation is a ground-plant issue that roofs do not have. Grass that grows up to the module edge shades the lowest cells, so the O&M plan for a plant like HUL – Orai has to cover the ground under and between rows as well as the modules.

Most losses at a working plant are small and gradual, such as a loose connector, built-up dust or a midday inverter trip, and monitoring and inspection find them early.

Finance model

Who owns the plant, and who runs it

CAPEX is the model where the client buys the plant. For this Orai plant, that means the 1,131 kWp system is the client's property since Apr 2022, with the savings and the upkeep decisions on the client's side.

CAPEX suits a company that plans to stay at a site for the life of the plant. Our financing page compares it with PPA / OPEX.

Orai

Where HUL – Orai sits on our list

Solar resource here
1,805 kWh/m² a yearAbout 1,522 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Orai; a roof plant at roof tilt differs.
Capacity range
1,000 kWp and above1,131 kWp here. 19 plants on our list are in this range.
Type of installation
Ground mountSpare land inside the plant boundary.
Finance option
CAPEXThe factory owns the plant from day one.

No other plant in Orai is on our published list yet, so the plant is the town's one record here.

Uttar Pradesh has 4 projects on the list, across 4 towns. By roof, 3 on metal sheet roofs and 1 on ground mount.

FMCG sites tend to run packing and dispatch in daylight hours, which lines up with when a solar plant generates.

Warehouses and packing halls give long runs of clear roof, which keeps the array simple.

Projects

Related plants

Elsewhere in Uttar Pradesh

Other ground-mount plants

Common questions

The HUL – Orai plant: questions and answers

How long has the HUL plant been running?

Apr 2022. That is when the 1,131 kWp plant in Orai began supplying the site, and the generation record runs from then.

Who looks after the 1,131 kWp plant at Orai?

The client owns it, because the plant was financed as CAPEX. Adhvanik Energy built the plant and maintains it under an O&M contract.

How do I find out if my roof can carry 1,131 kWp?

Not by default. Each site has its own roof, shade and load. The free 7-day feasibility study covers roof feasibility, a policy check for your state and a budgetary quote.

Free feasibility study

Want a 1,131 kWp plant on your own site?

Send your Uttar Pradesh town and monthly bill. An engineer replies within 48 hours, and the 7-day study is free.

Call us+91 22 4618 3484Get a free feasibility study