Project · Uttar Pradesh
HUL – Orai: 1,131 kWp ground-mount solar in Uttar Pradesh
HUL bought the plant under CAPEX and owns it. The plant has supplied the site since Apr 2022. It is one of 11 HUL plants on our project list.
- Capacity
- 1,131 kWp
- Installation
- Ground mount
- Location
- Orai, Uttar Pradesh
- Finance model
- CAPEX
Plant details
- Client
- HUL
- Industry
- FMCG
- Capacity
- 1,131 kWp (DC), with 1,100 kW (AC) of inverters
- Service
- EPC + O&M
- Commissioned
- Apr 2022
- Status
- Operational. Built and maintained by Adhvanik Energy; owned by the client.
From 1,000 kW of capacity upward, a plant is usually built in many blocks, each with its own inverter. The plant is in that class. Its 1,131 kWp of modules and 1,100 kW of inverters make a DC/AC ratio of 1.03, almost one to one.
The HUL plant has run since Apr 2022. Module degradation and wear on inverters and cables now show in the record. Apr 2022 falls in the hot season.
The plant closest to it in size on our list is HUL – Haridwar (1,126 kWp, Uttarakhand). Apr 2022 also saw Legrand – Sinnar (508 kWp, Maharashtra) commissioned. Its nearest neighbour in Uttar Pradesh, in order of commissioning, is Blink Infra – Gaddipur.
On the location pages: Uttar Pradesh. Find this plant in the projects index.
Engineering
How a 1,131 kWp plant is put together
Ground mount uses land the factory is not otherwise using. The first design decisions on a ground plant are about layout: row spacing for winter sun, internal roads, fire access and the path of stormwater.
Vegetation is a ground-plant issue that roofs do not have. Grass that grows up to the module edge shades the lowest cells, so the O&M plan for a plant like HUL – Orai has to cover the ground under and between rows as well as the modules.
Most losses at a working plant are small and gradual, such as a loose connector, built-up dust or a midday inverter trip, and monitoring and inspection find them early.
Finance model
Who owns the plant, and who runs it
CAPEX is the model where the client buys the plant. For this Orai plant, that means the 1,131 kWp system is the client's property since Apr 2022, with the savings and the upkeep decisions on the client's side.
CAPEX suits a company that plans to stay at a site for the life of the plant. Our financing page compares it with PPA / OPEX.
Orai
Where HUL – Orai sits on our list
- Solar resource here
- 1,805 kWh/m² a yearAbout 1,522 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Orai; a roof plant at roof tilt differs.
- Capacity range
- 1,000 kWp and above1,131 kWp here. 19 plants on our list are in this range.
- Type of installation
- Ground mountSpare land inside the plant boundary.
- Finance option
- CAPEXThe factory owns the plant from day one.
No other plant in Orai is on our published list yet, so the plant is the town's one record here.
Uttar Pradesh has 4 projects on the list, across 4 towns. By roof, 3 on metal sheet roofs and 1 on ground mount.
FMCG sites tend to run packing and dispatch in daylight hours, which lines up with when a solar plant generates.
Warehouses and packing halls give long runs of clear roof, which keeps the array simple.
Sector page: FMCG solar.
Projects
Related plants
Elsewhere in Uttar Pradesh
- Blink Infra – Sarai Sahjadi300 kWp · Metal sheet roof · Jun 2026
- Blink Infra – Bhokapur125 kWp · Metal sheet roof · Jun 2026
- Blink Infra – Gaddipur250 kWp · Metal sheet roof · May 2026
Other ground-mount plants
- HUL – Haridwar, 800 kWpGround mount
- HUL – Haridwar, 685 kWpGround mount
- HUL – Haridwar, 436 kWpGround mount
- HUL – Haridwar, 64 kWpGround mount
Common questions
The HUL – Orai plant: questions and answers
How long has the HUL plant been running?
Apr 2022. That is when the 1,131 kWp plant in Orai began supplying the site, and the generation record runs from then.
Who looks after the 1,131 kWp plant at Orai?
The client owns it, because the plant was financed as CAPEX. Adhvanik Energy built the plant and maintains it under an O&M contract.
How do I find out if my roof can carry 1,131 kWp?
Not by default. Each site has its own roof, shade and load. The free 7-day feasibility study covers roof feasibility, a policy check for your state and a budgetary quote.
Guides and glossary
Guides and terms behind a 1,131 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Reading your electricity bill: the numbers that matter for solarRead the guide
Terms used on this page
Free feasibility study
Want a 1,131 kWp plant on your own site?
Send your Uttar Pradesh town and monthly bill. An engineer replies within 48 hours, and the 7-day study is free.