Project · Maharashtra

Syngenta – Aurangabad: 404 kWp ground-mount solar in Maharashtra

Generating since Jun 2022. Adhvanik Energy owns and runs it, and Syngenta pays for each unit the plant generates, under a PPA.

Capacity
404 kWp
Installation
Ground mount
Location
Aurangabad, Maharashtra
Finance model
PPA / OPEX

Plant details

Client
Syngenta
Industry
Agro
Capacity
404 kWp (DC), with 300 kW (AC) of inverters
Service
EPC + O&M
Commissioned
Jun 2022
Status
Operational. Owned and run by Adhvanik Energy.

404 kWp is mid-sized for the list, enough to span a production hall or two. 300 kW of inverters serve 404 kWp of modules: a DC/AC ratio of 1.35.

Commissioned in Jun 2022, the plant has several seasons of data. The question now is whether performance ratio has held steady. Jun 2022 falls in the monsoon.

The plant closest to it in size on our list is MYK Laticrete – Indore (405 kWp, Madhya Pradesh). In Maharashtra, in order of commissioning, Arihant Auto – Aurangabad comes before it and Lemken – Nagpur after.

Engineering

What a ground-mount plant involves

Putting 404 kWp on the ground changes the checklist. There is no sheet or slab to protect. There are soil and foundations, drainage, fencing, and the route of the cable trenches back to the panel.

Cable runs are longer than on a roof, so trench routes, cable sizing and the inverter location are fixed early to keep losses down. A ground plant is also easy to reach for cleaning and inspection, because nobody works at height.

Our standard O&M scope has 24 to 26 cleaning cycles a year, more where the dust and the monsoon in Aurangabad call for them, with AI-enabled checks on cleaning quality.

Finance model

Who owns the plant, and who runs it

Syngenta – Aurangabad is a PPA / OPEX plant. Adhvanik Energy invested in it, owns it and runs it, and the client pays for each unit it generates at the tariff in its contract, with no capital of its own.

A PPA keeps the client's capital free for the factory itself; its cost is the tariff on the units the plant generates.

Aurangabad

Agro plants in Maharashtra

Solar resource here
1,918 kWh/m² a yearAbout 1,593 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Aurangabad; a roof plant at roof tilt differs.
Capacity range
250 to 500 kWp404 kWp here. 36 plants on our list are in this range.
Type of installation
Ground mountSpare land inside the plant boundary.
Finance option
PPA / OPEXNo capital from the factory: it pays per unit generated.

We list 4 plants in Aurangabad, and Syngenta – Aurangabad is one of them. Between them they cover agro, automotive and chemicals.

Aurangabad is covered on the page for Aurangabad (Chhatrapati Sambhajinagar), which lists 4 plants.

In Maharashtra the list shows 44 projects in 17 towns. Named sectors include electrical and electronics; agro; automotive; polymer.

Agricultural processing follows the harvest, so load rises in season and drops outside it, and the plant is sized against the whole year and not the peak.

Ask for several years of monthly bills, because a seasonal load makes a single year misleading.

Projects

Related plants

Also in Aurangabad

Elsewhere in Maharashtra

Other ground-mount plants

Common questions

What people ask about this plant

What does 404 kWp mean for the plant?

The plant carries 404 kWp of modules and 300 kW of inverter capacity. kWp is the module rating at test conditions, and kW (AC) is what the inverters can deliver. As a ratio that is 1.35: the array is rated above the inverters, which cap what the plant can feed the site at any moment.

Is the Syngenta plant a rooftop plant?

Ground mount: steel structures on foundations, on land the site owns, with trenches carrying cable back to the panel.

Is Aurangabad within your reach for a new plant?

Yes. 4 plants are listed for Aurangabad, among 44 in Maharashtra. The free 7-day feasibility study needs only your town and a typical monthly bill.

Free feasibility study

Find out what your land can carry

The free 7-day study gives a site in Aurangabad an ROI sheet, a policy check, roof feasibility and a budgetary quote. Expect an engineer within 48 hours.

Call us+91 22 4618 3484Get a free feasibility study