Project · Maharashtra

Soma Resort – Nashik: 50 kWp metal sheet rooftop solar in Maharashtra

Generating since Feb 2022. Soma Resort bought the plant under CAPEX and owns it. It is one of 2 Soma Resort plants on our project list.

50 kWp metal sheet rooftop plant at Soma Resort in Nashik, Maharashtra
Capacity
50 kWp
Installation
Metal sheet roof
Location
Nashik, Maharashtra
Finance model
CAPEX

Plant details

Client
Soma Resort
Industry
Hospitality
Capacity
50 kWp (DC), with 50 kW (AC) of inverters
Service
EPC + O&M
Commissioned
Feb 2022
Status
Operational. Built and maintained by Adhvanik Energy; owned by the client.

50 kWp is at the smaller end of the plants on our list: one roof, with room for a second phase later. Modules and inverters are closely matched, a DC/AC ratio of 1.01.

The plant has run since Feb 2022. Module degradation and wear on inverters and cables now show in the record. Feb 2022 fell in the low-sun winter months.

For scale, the nearest match in capacity is HUL – Nalagarh (46 kWp, Himachal Pradesh). In Maharashtra, in order of commissioning, Ronch Polymer – Pune, 196 kWp comes before it and Legrand – Sinnar, 508 kWp after.

On site

4 photos and a video clip from the plant. Select one to enlarge.

Engineering

What a metal sheet rooftop plant involves

Putting 50 kWp on sheet means respecting a roof built to keep rain out and carry little else. The rails spread the array's weight across several purlins, and the design is checked against wind uplift for the site.

Before modules go on a sheet roof like the one at Soma Resort – Nashik, the roof assessment covers sheet age and corrosion and any turbo ventilators or skylights, and a structural engineer confirms the purlins. A leaking bay is re-sheeted first, because lifting modules off a roof later costs more than doing the job beforehand.

Irradiance sensors give Asset Connect the sunshine a 50 kWp plant should have converted, so a shortfall can be told apart from a cloudy week.

Finance model

Who owns the plant, and who runs it

CAPEX is the model where the client buys the plant. For the Soma Resort plant, that means the 50 kWp system is the client's property since Feb 2022, with the savings and the upkeep decisions on the client's side.

CAPEX suits a company that plans to stay at a site for the life of the plant. Our financing page compares it with PPA / OPEX.

Nashik

Where Soma Resort – Nashik sits on our list

Solar resource here
1,935 kWh/m² a yearAbout 1,622 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Nashik; a roof plant at roof tilt differs.
Capacity range
Under 250 kWp50 kWp here. 33 plants on our list are in this range.
Type of installation
Metal sheet roofThe most common factory roof.
Finance option
CAPEXThe factory owns the plant from day one.

Nashik is a repeat location on the list, with 5 plants listed. Between them they cover hospitality; electrical and electronics; FMCG.

Nashik is covered on the page for Nashik and Sinnar, which lists 7 plants.

In Maharashtra the list shows 44 projects in 17 towns. Named sectors include electrical and electronics; agro; automotive; polymer.

A hotel draws power through the day for kitchens, laundry, pumps and air conditioning, so a roof plant's output is used on site.

Ask how occupancy changes through the year, since a resort's load follows its season.

Projects

Other plants on the list

Also in Nashik

Elsewhere in Maharashtra

Other plants on metal sheet roofs

Common questions

The Soma Resort – Nashik plant: questions and answers

What does 50 kWp mean for this Nashik plant?

The plant carries 50 kWp of modules and 50 kW of inverter capacity. kWp is the module rating at test conditions, and kW (AC) is what the inverters can deliver. Module and inverter ratings are nearly equal here (ratio 1.01).

What roof is the plant built on?

Metal sheet, per the list. On a roof like that the mounting is chosen per roof, and sheet condition is checked before any module goes on.

Is Nashik within your reach for a new plant?

Yes. 5 plants are listed for Nashik, among 44 in Maharashtra. The free 7-day feasibility study needs only your town and a typical monthly bill.

Free feasibility study

Plan a plant for your own Maharashtra site

The free 7-day study gives a site in Nashik an ROI sheet, a policy check, roof feasibility and a budgetary quote. Expect an engineer within 48 hours.

Call us+91 22 4618 3484Get a free feasibility study