Legrand – Sinnar: 508 kWp metal sheet rooftop solar in Maharashtra

Adhvanik Energy owns and runs it, and Legrand pays for each unit the plant generates, under a PPA. The plant has supplied the site since Apr 2022. It is one of 4 Legrand plants on our project list.

Capacity
508 kWp
Installation
Metal sheet roof
Location
Sinnar, Maharashtra
Finance model
PPA / OPEX

Size, roof and finance model

Client
Legrand
Industry
Electrical & Electronics
Capacity
508 kWp (DC), with 400 kW (AC) of inverters
Service
EPC + O&M
Commissioned
Apr 2022
Status
Operational. Owned and run by Adhvanik Energy.

A 508 kWp plant needs a big roof or plot, and its structural check, shade analysis and connection point take longer than a small plant's. The array is 27% larger than the inverters, a DC/AC ratio of 1.27.

Commissioned in Apr 2022, the plant has several seasons of data. The question now is whether performance ratio has held steady. Its first readings, in Apr 2022, came in the dusty summer months.

For scale, the nearest match in capacity is Britannia – Chennai (503 kWp, Tamil Nadu). Apr 2022 also saw HUL – Orai (1,131 kWp, Uttar Pradesh) commissioned. Of the Maharashtra plants on our list, Soma Resort – Nashik, 50 kWp was commissioned just before it and Arihant Auto – Aurangabad just after.

Engineering

How a 508 kWp plant is put together

The 508 kWp at Legrand – Sinnar sits on metal sheet roofing. In many cases the structure is fixed through the sheet; where the owner wants a zero-leakage roof, the mounting is non-penetrating, with clamps that grip the ribs or seams or adhesive bonding of the rails.

On a long shed, a short, tidy cable route on trays, from array to inverters to LT panel, saves losses and maintenance time over the life of the plant.

After commissioning, Asset Connect logs output and alerts, and a monthly report an engineer signs sets measured performance ratio against the design.

Finance model

How the plant is paid for

Legrand – Sinnar gets its solar through a PPA: 508 kWp on its site, owned by Adhvanik Energy and paid for per unit generated, at the tariff in the contract.

RESCO is the industry's name for this arrangement: a renewable energy service company that owns and operates the plant.

Sinnar

Electrical & Electronics plants in Maharashtra

Solar resource here
1,972 kWh/m² a yearAbout 1,652 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Sinnar; a roof plant at roof tilt differs.
Capacity range
500 to 1,000 kWp508 kWp here. 38 plants on our list are in this range.
Type of installation
Metal sheet roofThe most common factory roof.
Finance option
PPA / OPEXNo capital from the factory: it pays per unit generated.

Besides the plant, our list has 1 other plant in Sinnar. The sector named there is electrical and electronics.

Sinnar is covered on the page for Nashik and Sinnar, which lists 7 plants.

Across Maharashtra our list holds 44 plants in 17 towns, commissioned between 2020 and 2026.

Electronics assembly and testing keep a steady daytime load, with cooling adding to it in summer.

Electrical and electronics sites can combine RCC blocks with shed extensions, so the roof type can differ across the site.

Projects

More plants near Sinnar

Also in Sinnar

Elsewhere in Maharashtra

Other plants on metal sheet roofs

Common questions

The Legrand – Sinnar plant: questions and answers

When was the Legrand plant commissioned?

This Sinnar plant was commissioned in Apr 2022 and has supplied the site since then. That history is the first thing an O&M review reads.

Who owns the Legrand – Sinnar plant?

Adhvanik Energy owns and runs the plant. The client pays for each unit the plant generates, at the tariff in its contract, and our O&M team looks after the plant.

Can the Legrand – Sinnar design be repeated at my site?

It depends on the roof or land, the load and the connection. The free 7-day feasibility study includes a roof feasibility check, the area available for installation and a financial ROI sheet for your site.

Free feasibility study

Want a 508 kWp plant on your own site?

Tell us the roof type and last year's bills. An engineer gets back within 48 hours. The 7-day feasibility study costs nothing.

Call us+91 22 4618 3484Get a free feasibility study