DP Cocoa – Varadaiahpalem: 759 kWp metal sheet rooftop solar in Andhra Pradesh

DP Cocoa bought the plant under CAPEX and owns it. The plant has supplied the site since May 2026.

Capacity
759 kWp
Installation
Metal sheet roof
Location
Varadaiahpalem, Andhra Pradesh
Finance model
CAPEX

Size, roof and finance model

Client
DP Cocoa
Industry
Food processing
Capacity
759 kWp (DC), with 600 kW (AC) of inverters
Service
EPC + O&M
Commissioned
May 2026
Status
Operational. Built and maintained by Adhvanik Energy; owned by the client.

A 759 kWp plant needs a big roof or plot, and its structural check, shade analysis and connection point take longer than a small plant's. 600 kW of inverters serve 759 kWp of modules: a DC/AC ratio of 1.26.

The plant in Varadaiahpalem started supplying the site in May 2026. A few months of readings will set its baseline. Its first readings, in May 2026, came in the dusty summer months.

Closest in capacity on the list: FUSO Glass – Chennai (750 kWp, Tamil Nadu). May 2026 also saw Sterlite – Silvassa (249 kWp, Dadra and Nagar Haveli and Daman and Diu) and DP Chocolates – Varadaiahpalem (490 kWp) commissioned. Its nearest neighbour in Andhra Pradesh, in order of commissioning, is DP Chocolates – Varadaiahpalem.

Engineering

What a metal sheet rooftop plant involves

For the metal sheet roof at DP Cocoa – Varadaiahpalem, the starting point is the sheet itself: its make, profile, thickness and age. Those four facts tell the engineer whether clamps or adhesive fit, and how many years of life the roof has left under the array.

On a long shed, a short, tidy cable route on trays, from array to inverters to LT panel, saves losses and maintenance time over the life of the plant.

Most losses at a working plant are small and gradual, such as a loose connector, built-up dust or a midday inverter trip, and monitoring and inspection find them early.

Finance model

What CAPEX means here

Under CAPEX the owner buys the plant outright and controls it for its whole life. That suits a company with capital to deploy and a long horizon at the site, which describes the client at the plant since May 2026.

After handover, the owner placed day-to-day care of the plant with our O&M team under contract.

Varadaiahpalem

Varadaiahpalem and the food processing sector

Solar resource here
1,895 kWh/m² a yearAbout 1,514 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Varadaiahpalem; a roof plant at roof tilt differs.
Capacity range
500 to 1,000 kWp759 kWp here. 38 plants on our list are in this range.
Type of installation
Metal sheet roofThe most common factory roof.
Finance option
CAPEXThe factory owns the plant from day one.

Besides the DP Cocoa plant, our list has 1 other plant in Varadaiahpalem. The sector named there is food processing.

Across Andhra Pradesh our list holds 3 plants in 2 towns, commissioned in 2026.

Processing and cold storage give a high base load, and the daytime share is where solar helps.

Processing halls have flat or lightly pitched roofs, and the array is planned around exhausts and plant rooms.

Projects

More plants near Varadaiahpalem

Also in Varadaiahpalem

Elsewhere in Andhra Pradesh

Other plants on metal sheet roofs

Common questions

Questions about DP Cocoa – Varadaiahpalem

When was this Varadaiahpalem plant commissioned?

The DP Cocoa plant was commissioned in May 2026 and has supplied the site since then. The early question is whether output matches the design.

Who maintains this Varadaiahpalem plant?

Under CAPEX the client owns the plant. Adhvanik Energy built it, and our O&M team handles the day-to-day upkeep.

Can the DP Cocoa – Varadaiahpalem design be repeated at my site?

Not by default. Each site has its own roof, shade and load. The free 7-day feasibility study covers roof feasibility, a policy check for your state and a budgetary quote.

Free feasibility study

Find out what your sheds can carry

Send your Andhra Pradesh town and monthly bill. An engineer replies within 48 hours, and the 7-day study is free.

Call us+91 22 4618 3484Get a free feasibility study