Project · O&M only · Karnataka
MTC – Bidadi: 100 kW (AC) solar plant in Karnataka, maintained by Adhvanik
Another company built this plant in Bidadi. Adhvanik Energy's O&M team now keeps it running for MTC. It is one of 3 MTC plants on our project list.
- Capacity
- 100 kW (AC)
- Installation
- Metal sheet roof
- Location
- Bidadi, Karnataka
- Service
- O&M only
This plant at a glance
- Client
- MTC
- Capacity
- 100 kW (AC)
- Commissioned
- Apr 2024
- Status
- Built by another company. Adhvanik Energy maintains it. O&M only
The plant is a small plant by the standard of the list: 100 kW (AC), one roof or one block.
Commissioned in Apr 2024, the plant has several seasons of data. The question now is whether performance ratio has held steady. Apr 2024 put its first months in the hot, dusty season.
For scale, the nearest match in capacity is Pidilite – Baddi (97 kWp, Himachal Pradesh). ArcelorMittal Nippon Steel – Pune (800 kW (AC), Maharashtra) and Plastiblends – Roorkee (300 kWp, Uttarakhand) were also commissioned in Apr 2024.
On the location pages: Karnataka. Find this plant in the projects index.
O&M
Our O&M scope at a plant we did not build
The original build at MTC – Bidadi is another company's work. What we take on is the plant as it stands: its modules, inverters and cabling, and the generation record that shows how it is doing.
A plant that has drifted shows it in performance ratio: soiling, a failed string or an inverter fault each take a share of output. Asset Connect puts that number in front of our engineers every month.
On Asset Connect, a 100 kW (AC) plant is read month on month: generation, irradiance and fault alerts, with performance ratio showing whether soiling or a fault is costing units.
Finance model
What O&M only means here
Neither CAPEX nor a PPA applies to us at the MTC plant. The plant has its own history, and our contract is an AMC for keeping it generating.
Third-party AMCs include monitoring and a fixed maintenance scope, and contracts run up to 25 years.
Bidadi
The area around MTC – Bidadi
- Solar resource here
- 1,942 kWh/m² a yearAbout 1,586 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Bidadi; a roof plant at roof tilt differs.
- Capacity range
- Under 250 kWp100 kW (AC) here. 33 plants on our list are in this range.
- Type of installation
- Metal sheet roofThe most common factory roof.
- Service
- O&M onlyOne team accountable for output, with a monthly report.
Bidadi is a repeat location on the list, with 2 plants listed. Its one named sector is automotive.
In Karnataka the list shows 3 projects in 1 town. Named sectors include automotive and textile.
Sector pages: industries we work with.
Projects
Other plants on the list
Also in Bidadi
- MTC – Bidadi, 181 kWpMetal sheet roof · Apr 2024
Elsewhere in Karnataka
- Pearl Global – Bengaluru637 kWp · RCC · Mar 2026
Other plants we maintain but did not build
- Samruddhi Industries – Chittoor501 kWp · O&M only
- Britannia – Puducherry467 kWp · O&M only
- Sansera Engineering – Manesar201 kWp · O&M only · Sep 2025
- ArcelorMittal Nippon Steel – Bahadurgarh600 kWp · O&M only · Oct 2024
Common questions
What people ask about this plant
Is 100 kW (AC) the module or the inverter size at this Bidadi plant?
The list records 100 kW (AC) for the plant, the inverter rating. Only that figure is on record, so we show it with its unit and do not convert it to a module size.
What roof is the MTC plant built on?
It is on metal sheet. The mounting follows OEM installation guidelines, and the structure is designed for the wind speed under IS 875.
Do you build plants in Karnataka?
Yes. 2 plants are listed for Bidadi, among 3 in Karnataka. The free 7-day feasibility study needs only your town and a typical monthly bill.
Guides and glossary
Guides and terms behind a 100 kW (AC) plant
- Performance ratio (PR): how to judge a plant after commissioningRead the guide
- Reading your electricity bill: the numbers that matter for solarRead the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
Terms used on this page
Free feasibility study
Find out what your sheds can carry
Send your Karnataka town and monthly bill. An engineer replies within 48 hours, and the 7-day study is free.