Project · Gujarat
West Coast – Surat: 162 kWp metal sheet rooftop solar in Gujarat
West Coast bought the plant under CAPEX and owns it. The plant has supplied the site since Jun 2026. It is one of 2 West Coast plants on our project list.
- Capacity
- 162 kWp
- Installation
- Metal sheet roof
- Location
- Surat, Gujarat
- Finance model
- CAPEX
Plant details
- Client
- West Coast
- Capacity
- 162 kWp (DC), with 125 kW (AC) of inverters
- Service
- EPC + O&M
- Commissioned
- Jun 2026
- Status
- Operational. Built and maintained by Adhvanik Energy; owned by the client.
At 162 kWp, the plant fits on a single roof or one section of a site, sized to one building's daytime load. 125 kW of inverters serve 162 kWp of modules: a DC/AC ratio of 1.29.
The plant in Surat started supplying the site in Jun 2026. A few months of readings will set its baseline. Jun 2026 falls in the monsoon.
Closest in capacity on the list: Arihant Auto – Aurangabad (162 kWp, Maharashtra). Jun 2026 also saw Blink Infra – Bhokapur (125 kWp, Uttar Pradesh) and Sterlite – Silvassa (500 kWp, Dadra and Nagar Haveli and Daman and Diu) commissioned. Of the Gujarat plants on our list, West Coast – Surat, 577 kWp was commissioned just before it and Zeeta Electrical – Sanand just after.
More on the area: Gujarat · Surat and Palsana. See it in the filterable project list.
Engineering
How a 162 kWp plant is put together
The 162 kWp at West Coast – Surat sits on metal sheet roofing. In many cases the structure is fixed through the sheet; where the owner wants a zero-leakage roof, the mounting is non-penetrating, with clamps that grip the ribs or seams or adhesive bonding of the rails.
Shadows on a shed roof come from ridge monitors, ventilators and neighbouring buildings. The layout for a plant like the plant is drawn with those in place, so no row loses output to a shadow that was visible on the first day.
Our standard O&M scope has 24 to 26 cleaning cycles a year, more where the dust and the monsoon in Surat call for them, with AI-enabled checks on cleaning quality.
Finance model
How the plant is paid for
CAPEX is the model where the client buys the plant. For the West Coast plant, that means the 162 kWp system is the client's property since Jun 2026, with the savings and the upkeep decisions on the client's side.
We design, procure, build and commission a CAPEX plant, then hand it over. A 1-year defect liability period covers the entire installation, we handle manufacturer warranty claims, and the owner can sign an O&M contract of up to 25 years.
Surat
Where West Coast – Surat sits on our list
- Solar resource here
- 1,948 kWh/m² a yearAbout 1,633 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Surat; a roof plant at roof tilt differs.
- Capacity range
- Under 250 kWp162 kWp here. 33 plants on our list are in this range.
- Type of installation
- Metal sheet roofThe most common factory roof.
- Finance option
- CAPEXThe factory owns the plant from day one.
We list 2 plants in Surat, and this Surat plant is one of them.
Surat is covered on the page for Surat and Palsana, which lists 5 plants.
Gujarat has 12 projects on the list, across 7 towns. By roof, 11 on metal sheet roofs and 1 on RCC.
Sector pages: industries we work with. Rules for Gujarat: solar policy.
Projects
Other plants on the list
Also in Surat
- West Coast – Surat, 577 kWpMetal sheet roof · May 2026
Elsewhere in Gujarat
- MYK Laticrete – Vadodara450 kWp · Metal sheet roof · Sep 2026
- Zeeta Electrical – Sanand519 kWp · Metal sheet roof · Aug 2026
- Shrotra Enterprises – Sarigam1,300 kWp · Metal sheet roof · Aug 2025
- Terex – Gujarat352 kWp · Metal sheet roof · Mar 2025
Other plants on metal sheet roofs
- Ronch Polymer – Pune, 332 kWpMetal sheet roof · Jan 2022
- Apex Knives – Nagpur200 kWp · Metal sheet roof · Dec 2021
- UCC – Pune, 310 kWpMetal sheet roof · Jun 2021
- MTC – Pune270 kWp · Metal sheet roof · May 2021
Common questions
What people ask about this plant
When was the plant commissioned?
This Surat plant was commissioned in Jun 2026 and has supplied the site since then. The early question is whether output matches the design.
Who owns the West Coast – Surat plant?
Under CAPEX the client owns the plant. Adhvanik Energy built it, and our O&M team handles the day-to-day upkeep.
How do I find out if my roof can carry 162 kWp?
Not by default. Each site has its own roof, shade and load. The free 7-day feasibility study covers roof feasibility, a policy check for your state and a budgetary quote.
Guides and glossary
Guides and terms behind a 162 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Performance ratio (PR): how to judge a plant after commissioningRead the guide
Terms used on this page
Free feasibility study
Want a 162 kWp plant on your own site?
Tell us the roof type and last year's bills. An engineer gets back within 48 hours. The 7-day feasibility study costs nothing.