Project · Maharashtra

Mitsubishi Electric – Pune: 1,000 kWp metal sheet rooftop solar in Maharashtra

Generating since Feb 2026. Mitsubishi Electric bought the plant under CAPEX and owns it.

1,000 kWp metal sheet rooftop plant at Mitsubishi Electric in Pune, Maharashtra
Capacity
1,000 kWp
Installation
Metal sheet roof
Location
Pune, Maharashtra
Finance model
CAPEX

Size, roof and finance model

Client
Mitsubishi Electric
Industry
Electrical & Electronics
Capacity
1,000 kWp (DC), with 750 kW (AC) of inverters
Service
EPC + O&M
Commissioned
Feb 2026
Status
Operational. Built and maintained by Adhvanik Energy; owned by the client.

1,000 kWp is a large plant for any factory, needing a big area and a strong connection to the site's panel. Its 1,000 kWp of modules feed 750 kW of inverters, a DC/AC ratio of 1.33.

Mitsubishi Electric – Pune has been running only since Feb 2026. The early question is whether output matches the design. Feb 2026 fell in the low-sun winter months.

Closest in capacity on the list: Dabur – Rudrapur (1,000 kWp, Uttarakhand). Springtech Suspensions – Pithampur (400 kWp, Madhya Pradesh) and Pearl Global – Chennai (360 kWp, Tamil Nadu) were also commissioned in Feb 2026. In Maharashtra, in order of commissioning, Mahyco – Jalna comes before it and Legrand – Nashik after.

On site

A video clip from the plant. Select one to enlarge.

Engineering

The engineering behind a plant like Mitsubishi Electric – Pune

Putting 1,000 kWp on sheet means respecting a roof built to keep rain out and carry little else. The rails spread the array's weight across several purlins, and the design is checked against wind uplift for the site.

Edge protection, lifelines and fixed walkways are part of the design, because crews work on a surface not built for foot traffic. The same arrangements serve the cleaning team for as long as a 1,000 kWp plant runs.

Most losses at a working plant are small and gradual, such as a loose connector, built-up dust or a midday inverter trip, and monitoring and inspection find them early.

Finance model

Who owns the plant, and who runs it

The plant was financed as CAPEX: the client paid for the plant and owns it from day one. Every unit it generates replaces a unit bought from the grid, and the saving is the client's.

We design, procure, build and commission a CAPEX plant, then hand it over. A 1-year defect liability period covers the entire installation, we handle manufacturer warranty claims, and the owner can sign an O&M contract of up to 25 years.

Pune

Electrical & Electronics plants in Maharashtra

Solar resource here
1,920 kWh/m² a yearAbout 1,590 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Pune; a roof plant at roof tilt differs.
Capacity range
1,000 kWp and above1,000 kWp here. 19 plants on our list are in this range.
Type of installation
Metal sheet roofThe most common factory roof.
Finance option
CAPEXThe factory owns the plant from day one.

We list 12 plants in Pune, and the Mitsubishi Electric plant is one of them. Sectors named there: automotive; electrical and electronics; polymer; chemicals; steel and metals.

Pune is covered on the page for Pune and its MIDC estates, which lists 12 plants.

In Maharashtra the list shows 44 projects in 17 towns. Named sectors include electrical and electronics; agro; automotive; polymer.

Electrical and electronics plants combine assembly with test rooms and air conditioning, and both draw power through the working day.

Ask for the roof types of every block before sizing, since a mix of RCC and sheet changes the structure plan.

Projects

Related plants

Also in Pune

Elsewhere in Maharashtra

Other plants on metal sheet roofs

Common questions

The Mitsubishi Electric – Pune plant: questions and answers

What does 1,000 kWp mean for this Pune plant?

Two figures describe the plant: 1,000 kWp on the module side and 750 kW (AC) on the inverter side. That is 33% more module capacity than inverter capacity (ratio 1.33), a normal design choice.

How is the plant at Pune mounted?

It is on metal sheet. The mounting follows OEM installation guidelines, and the structure is designed for the wind speed under IS 875.

Do you build plants in Maharashtra?

Yes. 12 plants are listed for Pune, among 44 in Maharashtra. The free 7-day feasibility study needs only your town and a typical monthly bill.

Free feasibility study

Plan a plant for your own Maharashtra site

Send your Maharashtra town and monthly bill. An engineer replies within 48 hours, and the 7-day study is free.

Call us+91 22 4618 3484Get a free feasibility study