Project · Haryana

Pearl Global – Gurugram: 186 kWp metal sheet rooftop solar in Haryana

Pearl Global bought the plant under CAPEX and owns it. The plant has supplied the site since Jul 2025. It is one of 5 Pearl Global plants on our project list.

186 kWp metal sheet rooftop plant at Pearl Global in Gurugram, Haryana
Capacity
186 kWp
Installation
Metal sheet roof
Location
Gurugram, Haryana
Finance model
CAPEX

Size, roof and finance model

Client
Pearl Global
Industry
Textile
Capacity
186 kWp (DC), with 150 kW (AC) of inverters
Service
EPC + O&M
Commissioned
Jul 2025
Status
Operational. Built and maintained by Adhvanik Energy; owned by the client.

At 186 kWp, the plant fits on a single roof or one section of a site, sized to one building's daytime load. 150 kW of inverters serve 186 kWp of modules: a DC/AC ratio of 1.24.

Running since Jul 2025, the plant has been through a summer and a monsoon. Its seasonal pattern is now visible. Its first weeks, in Jul 2025, were monsoon weeks.

For scale, the nearest match in capacity is MTC – Bidadi (181 kWp, Karnataka). Jul 2025 also saw Victora Industries – Pune (843 kWp, Maharashtra) and Pearl Global – Gurugram (152 kWp) commissioned. Of the Haryana plants on our list, Pearl Global – Gurugram, 152 kWp was commissioned just before it and Pearl Global – Gurugram, 384 kWp just after.

On site

4 photos and a video clip from the plant. Select one to enlarge.

Engineering

The engineering behind a plant like Pearl Global – Gurugram

For the metal sheet roof at Pearl Global – Gurugram, the starting point is the sheet itself: its make, profile, thickness and age. Those four facts tell the engineer whether clamps or adhesive fit, and how many years of life the roof has left under the array.

Shadows on a shed roof come from ridge monitors, ventilators and neighbouring buildings. The layout for a plant like the plant is drawn with those in place, so no row loses output to a shadow that was visible on the first day.

Asset Connect keeps generation, irradiance and alerts in one place, and a drop in performance ratio is the first sign that a string, an inverter or the module surface needs attention.

Finance model

How the plant is paid for

CAPEX is the model where the client buys the plant. For the Pearl Global plant, that means the 186 kWp system is the client's property since Jul 2025, with the savings and the upkeep decisions on the client's side.

Compared with a PPA, CAPEX needs money up front and leaves the plant with the owner. Ask for both prices on the same roof.

Gurugram

Textile plants in Haryana

Solar resource here
1,735 kWh/m² a yearAbout 1,486 kWh per kWp a year for a standard tilted system; January is the weakest month. Global Solar Atlas estimate for Gurugram; a roof plant at roof tilt differs.
Capacity range
Under 250 kWp186 kWp here. 33 plants on our list are in this range.
Type of installation
Metal sheet roofThe most common factory roof.
Finance option
CAPEXThe factory owns the plant from day one.

Besides this Gurugram plant, our list has 2 other plants in Gurugram. The sector named there is textile.

Gurugram is covered on the page for Gurugram and Manesar, which lists 4 plants.

Haryana has 5 projects on the list, across 3 towns. By roof, 5 on metal sheet roofs.

Textile and apparel units run long shifts with steady machine and humidification load, so much of what a roof plant generates is used on site.

Older mills may have sawtooth roofs, whose glazing and orientation are reviewed before any layout.

Projects

Other plants on the list

Also in Gurugram

Elsewhere in Haryana

Other plants on metal sheet roofs

Common questions

What people ask about this plant

What is the commissioning date of the Pearl Global – Gurugram plant?

The plant was commissioned in Jul 2025 and has supplied the site since then. Its seasonal pattern is now visible.

Who looks after the 186 kWp plant at Gurugram?

Ownership sits with the client under CAPEX. We designed and built the plant, and our O&M team maintains it.

How do I find out if my roof can carry 186 kWp?

Only a check of your own site can say. The free 7-day feasibility study covers roof feasibility and the area available, a financial ROI sheet and a budgetary quote.

Free feasibility study

Want a 186 kWp plant on your own site?

Send your Haryana town and monthly bill. An engineer replies within 48 hours, and the 7-day study is free.

Call us+91 22 4618 3484Get a free feasibility study