Pearl Global – Gurugram: 384 kWp metal sheet rooftop solar in Haryana
Pearl Global bought the plant under CAPEX and owns it. The plant has supplied the site since Jul 2025. It is one of 5 Pearl Global plants on our project list.

- Capacity
- 384 kWp
- Installation
- Metal sheet roof
- Location
- Gurugram, Haryana
- Finance model
- CAPEX
This plant at a glance
- Client
- Pearl Global
- Industry
- Textile
- Capacity
- 384 kWp (DC), with 275 kW (AC) of inverters
- Service
- EPC + O&M
- Commissioned
- Jul 2025
- Status
- Operational. Built and maintained by Adhvanik Energy; owned by the client.
At 384 kWp, the Pearl Global plant covers a sizeable share of a factory roof, usually split across a few inverters. Its 384 kWp of modules feed 275 kW of inverters, a DC/AC ratio of 1.40.
With a commissioning month of Jul 2025, the plant has a year or more of readings, enough to compare each month with the same month a year earlier. Jul 2025 was a monsoon month, so early output ran under cloud.
Closest in capacity on the list: New Jack Printing – Bhiwandi (375 kWp, Maharashtra). Jul 2025 also saw Pearl Global – Gurugram (186 kWp) and Victora Industries – Pune (843 kWp, Maharashtra) commissioned. Its nearest neighbour in Haryana, in order of commissioning, is Pearl Global – Gurugram, 186 kWp.
More on the area: Haryana · Gurugram and Manesar. See it in the filterable project list.
On site
5 photos and a video clip from the plant. Select one to enlarge.
Engineering
How a 384 kWp plant is put together
The plant is one of the metal sheet roof plants on our list. On a shed in Haryana, the mounting is chosen for the sheet profile and designed to comply with OEM installation guidelines.
On a long shed, a short, tidy cable route on trays, from array to inverters to LT panel, saves losses and maintenance time over the life of the plant.
After commissioning, Asset Connect logs output and alerts, and a monthly report an engineer signs sets measured performance ratio against the design.
Finance model
What CAPEX means here
The CAPEX route puts ownership with the client from the day of commissioning in Jul 2025. The plant is the owner's asset, and the owner decides how it is maintained and for how long.
We design, procure, build and commission a CAPEX plant, then hand it over. A 1-year defect liability period covers the entire installation, we handle manufacturer warranty claims, and the owner can sign an O&M contract of up to 25 years.
Gurugram
Where Pearl Global – Gurugram sits on our list
- Solar resource here
- 1,735 kWh/m² a yearAbout 1,486 kWh per kWp a year for a standard tilted system; January is the weakest month. Global Solar Atlas estimate for Gurugram; a roof plant at roof tilt differs.
- Capacity range
- 250 to 500 kWp384 kWp here. 36 plants on our list are in this range.
- Type of installation
- Metal sheet roofThe most common factory roof.
- Finance option
- CAPEXThe factory owns the plant from day one.
Gurugram is a repeat location on the list, with 3 plants listed. The sector named there is textile.
Gurugram is covered on the page for Gurugram and Manesar, which lists 4 plants.
Across Haryana our list holds 5 plants in 3 towns, commissioned between 2024 and 2025.
Textile and apparel units run long shifts with steady machine and humidification load, so much of what a roof plant generates is used on site.
Older mills may have sawtooth roofs, whose glazing and orientation are reviewed before any layout.
Sector pages: industries we work with. Rules for Haryana: solar policy.
Projects
More plants near Gurugram
Also in Gurugram
- Pearl Global – Gurugram, 186 kWpMetal sheet roof · Jul 2025
- Pearl Global – Gurugram, 152 kWpMetal sheet roof · Jul 2025
Elsewhere in Haryana
- Sansera Engineering – Manesar201 kWp · O&M only · Sep 2025
- ArcelorMittal Nippon Steel – Bahadurgarh600 kWp · O&M only · Oct 2024
Other plants on metal sheet roofs
- Durian Industries – Palghar525 kWp · Metal sheet roof · Jun 2025
- MYK Laticrete – Indore405 kWp · Metal sheet roof · Jun 2025
- Zenith Irrigation – Nashik420 kWp · Metal sheet roof · May 2025
- Mysore Deep Perfumery – Indore266 kWp · Metal sheet roof · May 2025
Common questions
Questions about Pearl Global – Gurugram
When was this Gurugram plant commissioned?
Our list records Jul 2025. Its seasonal pattern is now visible.
Who owns the Pearl Global – Gurugram plant?
Under CAPEX the client owns the plant. Adhvanik Energy built it, and our O&M team handles the day-to-day upkeep.
Can the Pearl Global – Gurugram design be repeated at my site?
It depends on the roof or land, the load and the connection. The free 7-day feasibility study includes a roof feasibility check, the area available for installation and a financial ROI sheet for your site.
Guides and glossary
Guides and terms behind a 384 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Performance ratio (PR): how to judge a plant after commissioningRead the guide
Terms used on this page
Free feasibility study
Find out what your sheds can carry
The free 7-day study gives a site in Gurugram an ROI sheet, a policy check, roof feasibility and a budgetary quote. Expect an engineer within 48 hours.