Project · Uttar Pradesh

Blink Infra – Sarai Sahjadi: 300 kWp metal sheet rooftop solar in Uttar Pradesh

Generating since Jun 2026. An investor owns it under a PPA with Blink Infra; Adhvanik Energy built it and maintains it. It is one of 4 Blink Infra plants on our project list.

Capacity
300 kWp
Installation
Metal sheet roof
Location
Sarai Sahjadi, Uttar Pradesh
Finance model
PPA (investor-owned)

Size, roof and finance model

Client
Blink Infra
Industry
Warehousing
Capacity
300 kWp (DC), with 200 kW (AC) of inverters
Service
EPC + O&M
Commissioned
Jun 2026
Status
Operational. Built and maintained by Adhvanik Energy; owned by an investor.

A 300 kWp plant sits in the middle of the range we list: several inverters, on one site's roofs. 200 kW of inverters serve 300 kWp of modules: a DC/AC ratio of 1.50.

Commissioned in Jun 2026, the plant is recent. Its early months set the performance-ratio baseline. Its first weeks, in Jun 2026, were monsoon weeks.

The plant closest to it in size on our list is Plastiblends – Roorkee (300 kWp, Uttarakhand). Blink Infra – Bhokapur (125 kWp) and Sterlite – Silvassa (500 kWp, Dadra and Nagar Haveli and Daman and Diu) were also commissioned in Jun 2026. Its nearest neighbour in Uttar Pradesh, in order of commissioning, is Blink Infra – Bhokapur.

Engineering

The engineering behind a plant like Blink Infra – Sarai Sahjadi

Putting 300 kWp on sheet means respecting a roof built to keep rain out and carry little else. The rails spread the array's weight across several purlins, and the design is checked against wind uplift for the site.

The layout in Sarai Sahjadi is drawn around ventilators and skylights, which keep their access and stay out of the modules' shade. A shed roof is often long and clear in one direction, which allows straight rows and short cable runs to the LT panel.

Irradiance sensors give Asset Connect the sunshine a 300 kWp plant should have converted, so a shortfall can be told apart from a cloudy week.

Finance model

How the plant is paid for

Blink Infra – Sarai Sahjadi runs under a PPA funded by a third-party investor. The investor owns the 300 kWp plant and the client pays per unit generated; Adhvanik Energy designed, built and maintains it.

Investor-funded PPAs let a factory get solar without capital, with the investor carrying the asset.

Sarai Sahjadi

Sarai Sahjadi and the warehousing sector

Solar resource here
1,725 kWh/m² a yearAbout 1,457 kWh per kWp a year for a standard tilted system; January is the weakest month. Global Solar Atlas estimate for Sarai Sahjadi; a roof plant at roof tilt differs.
Capacity range
250 to 500 kWp300 kWp here. 36 plants on our list are in this range.
Type of installation
Metal sheet roofThe most common factory roof.
Finance option
PPA (investor-owned)No capital from the factory: an investor owns the plant and the factory pays per unit.

No other plant in Sarai Sahjadi is on our published list yet, so the plant is the town's one record here.

Across Uttar Pradesh our list holds 4 plants in 4 towns, commissioned between 2022 and 2026.

A warehouse has a large roof and a modest daytime load from lighting, handling equipment and offices, so the plant is sized to what the building and its tenant use.

Ask whether the tenant or the building owner holds the electricity connection, because that decides who signs for the plant.

Projects

More plants near Sarai Sahjadi

Elsewhere in Uttar Pradesh

Other plants on metal sheet roofs

Common questions

What people ask about this plant

How big is the Blink Infra – Sarai Sahjadi plant?

Two figures describe the Blink Infra plant: 300 kWp on the module side and 200 kW (AC) on the inverter side. That is 50% more module capacity than inverter capacity (ratio 1.50), a normal design choice.

What does the roof mean for the 300 kWp plant at Sarai Sahjadi?

Metal sheet, per the list. On a roof like that the mounting is chosen per roof, and sheet condition is checked before any module goes on.

Does Adhvanik Energy work near Sarai Sahjadi?

Yes. One plant is listed for Sarai Sahjadi, among 4 in Uttar Pradesh. The free 7-day feasibility study needs only your town and a typical monthly bill.

Free feasibility study

Plan a plant for your own Uttar Pradesh site

A 300 kWp plant is one data point. The free 7-day study gives you the numbers for your own site.

Call us+91 22 4618 3484Get a free feasibility study