Project · Maharashtra

MDB Chemicals – Jalgaon: 176 kWp metal sheet rooftop solar in Maharashtra

MDB Chemicals bought the plant under CAPEX and owns it. The plant has supplied the site since Oct 2024. It is one of 2 MDB Chemicals plants on our project list.

Capacity
176 kWp
Installation
Metal sheet roof
Location
Jalgaon, Maharashtra
Finance model
CAPEX

Plant details

Client
MDB Chemicals
Industry
Chemicals
Capacity
176 kWp (DC), with 150 kW (AC) of inverters
Service
EPC + O&M
Commissioned
Oct 2024
Status
Operational. Built and maintained by Adhvanik Energy; owned by the client.

At 176 kWp, the plant fits on a single roof or one section of a site, sized to one building's daytime load. The array is 17% larger than the inverters, a DC/AC ratio of 1.17.

Running since Oct 2024, the plant has been through a summer and a monsoon. Its seasonal pattern is now visible. Its first readings, in Oct 2024, followed the rains.

The plant closest to it in size on our list is Ronch Polymer – Daman (173 kWp, Dadra and Nagar Haveli and Daman and Diu). Oct 2024 also saw MDB Chemicals – Pune (400 kWp) and ArcelorMittal Nippon Steel – Bahadurgarh (600 kWp, Haryana) commissioned. Of the Maharashtra plants on our list, MDB Chemicals – Pune was commissioned just before it and AQ Inductive Components – Pune just after.

Engineering

What a metal sheet rooftop plant involves

MDB Chemicals – Jalgaon is one of the metal sheet roof plants on our list. On a shed in Maharashtra, the mounting is chosen for the sheet profile and designed to comply with OEM installation guidelines.

Walkways and safety lines matter more on sheet than on concrete, since a sheet that was never meant for foot traffic can crack underfoot. A 176 kWp array is laid out with fixed walkways so cleaning crews and O&M engineers stay on structure.

After commissioning, Asset Connect logs output and alerts, and a monthly report an engineer signs sets measured performance ratio against the design.

Finance model

How the plant is paid for

CAPEX is the model where the client buys the plant. For MDB Chemicals – Jalgaon, that means the 176 kWp system is the client's property since Oct 2024, with the savings and the upkeep decisions on the client's side.

CAPEX suits a company that plans to stay at a site for the life of the plant. Our financing page compares it with PPA / OPEX.

Jalgaon

Chemicals plants in Maharashtra

Solar resource here
1,926 kWh/m² a yearAbout 1,601 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Jalgaon; a roof plant at roof tilt differs.
Capacity range
Under 250 kWp176 kWp here. 33 plants on our list are in this range.
Type of installation
Metal sheet roofThe most common factory roof.
Finance option
CAPEXThe factory owns the plant from day one.

Besides the plant, our list has 1 other plant in Jalgaon. Sectors named there: chemicals and FMCG.

Across Maharashtra our list holds 44 plants in 17 towns, commissioned between 2020 and 2026.

Process plants in chemicals draw power around the clock, and the daytime share is what a roof plant can serve.

RCC blocks and sheds both appear in chemical works, and the plant is placed where the roof is clear of vents and process stacks.

Projects

More plants near Jalgaon

Also in Jalgaon

Elsewhere in Maharashtra

Other plants on metal sheet roofs

Common questions

What people ask about this plant

How long has the MDB Chemicals plant been running?

This Jalgaon plant was commissioned in Oct 2024 and has supplied the site since then.

Who looks after the 176 kWp plant at Jalgaon?

Ownership sits with the client under CAPEX. We designed and built the plant, and our O&M team maintains it.

Can the MDB Chemicals – Jalgaon design be repeated at my site?

Only a check of your own site can say. The free 7-day feasibility study covers roof feasibility and the area available, a financial ROI sheet and a budgetary quote.

Free feasibility study

Find out what your sheds can carry

A 176 kWp plant is one data point. The free 7-day study gives you the numbers for your own site.

Call us+91 22 4618 3484Get a free feasibility study