Project · Maharashtra
Baramati Cattlefeeds – Shrirampur: 729 kWp metal sheet rooftop solar in Maharashtra
Baramati Cattlefeeds bought the plant under CAPEX and owns it. The plant has supplied the site since Aug 2025. It is one of 3 Baramati Cattlefeeds plants on our project list.
- Capacity
- 729 kWp
- Installation
- Metal sheet roof
- Location
- Shrirampur, Maharashtra
- Finance model
- CAPEX
Plant details
- Client
- Baramati Cattlefeeds
- Capacity
- 729 kWp (DC), with 550 kW (AC) of inverters
- Service
- EPC + O&M
- Commissioned
- Aug 2025
- Status
- Operational. Built and maintained by Adhvanik Energy; owned by the client.
A 729 kWp plant needs a big roof or plot, and its structural check, shade analysis and connection point take longer than a small plant's. 550 kW of inverters serve 729 kWp of modules: a DC/AC ratio of 1.33.
The plant began supplying the site in Aug 2025. With a full year on record, a month that falls short of the same month last year stands out. Aug 2025 was a monsoon month, so early output ran under cloud.
The plant closest to it in size on our list is Horiba – Nagpur (721 kWp). Aug 2025 also saw Shrotra Enterprises – Sarigam (1,300 kWp, Gujarat) commissioned. Of the Maharashtra plants on our list, Victora Industries – Pune was commissioned just before it and Samruddhi Industries – Kolhapur just after.
More on the area: Maharashtra · Baramati and Shrirampur. See it in the projects index.
Engineering
The engineering behind a plant like Baramati Cattlefeeds – Shrirampur
For the metal sheet roof at Baramati Cattlefeeds – Shrirampur, the starting point is the sheet itself: its make, profile, thickness and age. Those four facts tell the engineer whether clamps or adhesive fit, and how many years of life the roof has left under the array.
Walkways and safety lines matter more on sheet than on concrete, since a sheet that was never meant for foot traffic can crack underfoot. A 729 kWp array is laid out with fixed walkways so cleaning crews and O&M engineers stay on structure.
After commissioning, Asset Connect logs output and alerts, and a monthly report an engineer signs sets measured performance ratio against the design.
Finance model
What CAPEX means here
The Baramati Cattlefeeds plant was financed as CAPEX: the client paid for the plant and owns it from day one. Every unit it generates replaces a unit bought from the grid, and the saving is the client's.
We design, procure, build and commission a CAPEX plant, then hand it over. A 1-year defect liability period covers the entire installation, we handle manufacturer warranty claims, and the owner can sign an O&M contract of up to 25 years.
Shrirampur
Solar plants in Shrirampur
- Solar resource here
- 1,954 kWh/m² a yearAbout 1,623 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Shrirampur; a roof plant at roof tilt differs.
- Capacity range
- 500 to 1,000 kWp729 kWp here. 38 plants on our list are in this range.
- Type of installation
- Metal sheet roofThe most common factory roof.
- Finance option
- CAPEXThe factory owns the plant from day one.
Shrirampur is a repeat location on the list, with 2 plants listed.
Shrirampur is covered on the page for Baramati and Shrirampur, which lists 3 plants.
Across Maharashtra our list holds 44 plants in 17 towns, commissioned between 2020 and 2026.
Sector pages: industries we work with. Rules for Maharashtra: solar policy.
Projects
Other plants on the list
Also in Shrirampur
- Baramati Cattlefeeds – Shrirampur, 578 kWpMetal sheet roof · Jul 2026
Elsewhere in Maharashtra
- Exotic Fruits – Nashik1,332 kWp · Metal sheet roof · Jul 2026
- Baramati Cattlefeeds – Baramati771 kWp · Metal sheet roof · Jul 2026
- FUSO Glass – Murbad926 kWp · Metal sheet roof · Jul 2026
- Ozpure – Maharashtra867 kWp · Metal sheet roof · Jul 2026
Other plants on metal sheet roofs
- UCC – Pune, 166 kWpMetal sheet roof · Nov 2023
- Ginni Gopal – Boisar104 kWp · Metal sheet roof · Jan 2023
- Arihant Gold Plast – Sarigam274 kWp · Metal sheet roof · Sep 2022
- Lemken – Nagpur477 kWp · Metal sheet roof · Jul 2022
Common questions
What people ask about this plant
What is the commissioning date of the Baramati Cattlefeeds – Shrirampur plant?
Aug 2025. That is when the 729 kWp plant in Shrirampur began supplying the site, and the generation record runs from then.
Who looks after the 729 kWp plant at Shrirampur?
The client owns it, because the plant was financed as CAPEX. Adhvanik Energy built the plant and maintains it under an O&M contract.
How do I find out if my roof can carry 729 kWp?
It depends on the roof or land, the load and the connection. The free 7-day feasibility study includes a roof feasibility check, the area available for installation and a financial ROI sheet for your site.
Guides and glossary
Guides and terms behind a 729 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Behind-the-meter or net metering: which suits your site?Read the guide
Terms used on this page
Free feasibility study
Plan a plant for your own Maharashtra site
The free 7-day study gives a site in Shrirampur an ROI sheet, a policy check, roof feasibility and a budgetary quote. Expect an engineer within 48 hours.