Project · Maharashtra

Radiant Indus Chem – Aurangabad: 1,235 kWp metal sheet rooftop solar in Maharashtra

Generating since Dec 2024. Radiant Indus Chem bought the plant under CAPEX and owns it.

1,235 kWp metal sheet rooftop plant at Radiant Indus Chem in Aurangabad, Maharashtra
Capacity
1,235 kWp
Installation
Metal sheet roof
Location
Aurangabad, Maharashtra
Finance model
CAPEX

Size, roof and finance model

Client
Radiant Indus Chem
Industry
Chemicals
Capacity
1,235 kWp (DC), with 950 kW (AC) of inverters
Service
EPC + O&M
Commissioned
Dec 2024
Status
Operational. Built and maintained by Adhvanik Energy; owned by the client.

At 1,235 kWp, the plant is among the largest plants on our list, and the structural check, cable route and connection point drive the design. The array is 30% larger than the inverters, a DC/AC ratio of 1.30.

With a commissioning month of Dec 2024, the plant has a year or more of readings, enough to compare each month with the same month a year earlier. Dec 2024 falls in the short-day season.

The plant closest to it in size on our list is Atomberg – Pune (1,238 kWp). Balmer Lawrie – Selaqui (530 kWp, Uttarakhand) and Ronch Polymer – Daman (478 kWp, Dadra and Nagar Haveli and Daman and Diu) were also commissioned in Dec 2024. In Maharashtra, in order of commissioning, AQ Inductive Components – Pune comes before it and Samruddhi Industries – Sangli after.

On site

4 photos and a video clip from the plant. Select one to enlarge.

Engineering

How a 1,235 kWp plant is put together

Putting 1,235 kWp on sheet means respecting a roof built to keep rain out and carry little else. The rails spread the array's weight across several purlins, and the design is checked against wind uplift for the site.

The layout in Aurangabad is drawn around ventilators and skylights, which keep their access and stay out of the modules' shade. A shed roof is often long and clear in one direction, which allows straight rows and short cable runs to the LT panel.

After commissioning, Asset Connect logs output and alerts, and a monthly report an engineer signs sets measured performance ratio against the design.

Finance model

Who owns the plant, and who runs it

CAPEX is the model where the client buys the plant. For the Radiant Indus Chem plant, that means the 1,235 kWp system is the client's property since Dec 2024, with the savings and the upkeep decisions on the client's side.

CAPEX suits a company that plans to stay at a site for the life of the plant. Our financing page compares it with PPA / OPEX.

Aurangabad

Where Radiant Indus Chem – Aurangabad sits on our list

Solar resource here
1,918 kWh/m² a yearAbout 1,593 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Aurangabad; a roof plant at roof tilt differs.
Capacity range
1,000 kWp and above1,235 kWp here. 19 plants on our list are in this range.
Type of installation
Metal sheet roofThe most common factory roof.
Finance option
CAPEXThe factory owns the plant from day one.

Aurangabad is a repeat location on the list, with 4 plants listed. Between them they cover agro, automotive and chemicals.

Aurangabad is covered on the page for Aurangabad (Chhatrapati Sambhajinagar), which lists 4 plants.

Across Maharashtra our list holds 44 plants in 17 towns, commissioned between 2020 and 2026.

Chemical works run reactors, pumps and utilities through long hours, so daytime demand is high and steady.

The roof assessment checks roof exposure to process emissions and the position of vents, which affect module cleaning and long-term soiling.

Projects

Other plants on the list

Also in Aurangabad

Elsewhere in Maharashtra

Other plants on metal sheet roofs

Common questions

Questions about Radiant Indus Chem – Aurangabad

Is 1,235 kWp the module or the inverter size at this Aurangabad plant?

Two figures describe the plant: 1,235 kWp on the module side and 950 kW (AC) on the inverter side. As a ratio that is 1.30: the array is rated above the inverters, which cap what the plant can feed the site at any moment.

What does the roof mean for the 1,235 kWp plant at Aurangabad?

It is on metal sheet. The mounting follows OEM installation guidelines, and the structure is designed for the wind speed under IS 875.

Is Aurangabad within your reach for a new plant?

Yes. 4 plants are listed for Aurangabad, among 44 in Maharashtra. The free 7-day feasibility study needs only your town and a typical monthly bill.

Free feasibility study

Want a 1,235 kWp plant on your own site?

Tell us the roof type and last year's bills. An engineer gets back within 48 hours. The 7-day feasibility study costs nothing.

Call us+91 22 4618 3484Get a free feasibility study