Project · Maharashtra
Essgee – Mumbai: 144 kWp metal sheet rooftop solar in Maharashtra
Essgee bought the plant under CAPEX and owns it. The plant has supplied the site since Sep 2025.

- Capacity
- 144 kWp
- Installation
- Metal sheet roof
- Location
- Mumbai, Maharashtra
- Finance model
- CAPEX
This plant at a glance
- Client
- Essgee
- Capacity
- 144 kWp (DC), with 125 kW (AC) of inverters
- Service
- EPC + O&M
- Commissioned
- Sep 2025
- Status
- Operational. Built and maintained by Adhvanik Energy; owned by the client.
At 144 kWp, the plant fits on a single roof or one section of a site, sized to one building's daytime load. Its 144 kWp of modules feed 125 kW of inverters, a DC/AC ratio of 1.15.
The plant began supplying the site in Sep 2025. With a full year on record, a month that falls short of the same month last year stands out. Sep 2025 was a monsoon month, so early output ran under cloud.
For scale, the nearest match in capacity is Legrand – Sinnar (141 kWp). Sep 2025 also saw Sansera Engineering – Manesar (201 kWp, Haryana) and Samruddhi Industries – Kolhapur (1,410 kWp) commissioned. Of the Maharashtra plants on our list, Samruddhi Industries – Kolhapur was commissioned just before it and Marico – Jalgaon just after.
On the location pages: Maharashtra · Mumbai, Palghar, Boisar, Bhiwandi and Murbad. See it in the filterable project list.
On site
3 photos and a video clip from the plant. Select one to enlarge.
Engineering
What a metal sheet rooftop plant involves
Essgee – Mumbai is one of the metal sheet roof plants on our list. On a shed in Maharashtra, the mounting is chosen for the sheet profile and designed to comply with OEM installation guidelines.
Shadows on a shed roof come from ridge monitors, ventilators and neighbouring buildings. The layout for a plant like Essgee – Mumbai is drawn with those in place, so no row loses output to a shadow that was visible on the first day.
After commissioning, Asset Connect logs output and alerts, and a monthly report an engineer signs sets measured performance ratio against the design.
Finance model
Who owns the plant, and who runs it
The Essgee plant was financed as CAPEX: the client paid for the plant and owns it from day one. Every unit it generates replaces a unit bought from the grid, and the saving is the client's.
A finance head weighing CAPEX against a PPA asks how much capital to commit, how long the plant will run and who will look after it.
Mumbai
Solar plants in Mumbai
- Solar resource here
- 1,911 kWh/m² a yearAbout 1,593 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Mumbai; a roof plant at roof tilt differs.
- Capacity range
- Under 250 kWp144 kWp here. 33 plants on our list are in this range.
- Type of installation
- Metal sheet roofThe most common factory roof.
- Finance option
- CAPEXThe factory owns the plant from day one.
We list 2 plants in Mumbai, and this Mumbai plant is one of them. The sector named there is packaging and printing.
Mumbai is covered on the page for Mumbai, Palghar, Boisar, Bhiwandi and Murbad, which lists 7 plants.
In Maharashtra the list shows 44 projects in 17 towns. Named sectors include electrical and electronics; agro; automotive; polymer.
Sector pages: industries we work with. Rules for Maharashtra: solar policy.
Projects
More plants near Mumbai
Also in Mumbai
- SAPCO – Mumbai531 kWp · Metal sheet roof · Apr 2025
Elsewhere in Maharashtra
- Exotic Fruits – Nashik1,332 kWp · Metal sheet roof · Jul 2026
- Baramati Cattlefeeds – Baramati771 kWp · Metal sheet roof · Jul 2026
- FUSO Glass – Murbad926 kWp · Metal sheet roof · Jul 2026
- Ozpure – Maharashtra867 kWp · Metal sheet roof · Jul 2026
Other plants on metal sheet roofs
- MDB Chemicals – Jalgaon176 kWp · Metal sheet roof · Oct 2024
- Atomberg – Pune1,238 kWp · Metal sheet roof · Jun 2024
- MTC – Bidadi, 181 kWpMetal sheet roof · Apr 2024
- UCC – Pune, 166 kWpMetal sheet roof · Nov 2023
Common questions
What people ask about this plant
What is the commissioning date of the Essgee – Mumbai plant?
The plant was commissioned in Sep 2025 and has supplied the site since then.
Who maintains the Essgee plant?
The client owns it, because this Mumbai plant was financed as CAPEX. Adhvanik Energy built the plant and maintains it under an O&M contract.
How do I find out if my roof can carry 144 kWp?
Only a check of your own site can say. The free 7-day feasibility study covers roof feasibility and the area available, a financial ROI sheet and a budgetary quote.
Guides and glossary
Guides and terms behind a 144 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Performance ratio (PR): how to judge a plant after commissioningRead the guide
Terms used on this page
Free feasibility study
Plan a plant for your own Maharashtra site
Tell us the roof type and last year's bills. An engineer gets back within 48 hours. The 7-day feasibility study costs nothing.