Project · Gujarat
Shrotra Enterprises – Sarigam: 1,300 kWp metal sheet rooftop solar in Gujarat
Generating since Aug 2025. Shrotra Enterprises bought the plant under CAPEX and owns it.
- Capacity
- 1,300 kWp
- Installation
- Metal sheet roof
- Location
- Sarigam, Gujarat
- Finance model
- CAPEX
Size, roof and finance model
- Client
- Shrotra Enterprises
- Industry
- Packaging & Printing
- Capacity
- 1,300 kWp (DC), with 1,000 kW (AC) of inverters
- Service
- EPC + O&M
- Commissioned
- Aug 2025
- Status
- Operational. Built and maintained by Adhvanik Energy; owned by the client.
At 1,300 kWp, Shrotra Enterprises – Sarigam is among the largest plants on our list, and the structural check, cable route and connection point drive the design. The array is 30% larger than the inverters, a DC/AC ratio of 1.30.
The plant began supplying the site in Aug 2025. With a full year on record, a month that falls short of the same month last year stands out. Aug 2025 falls in the monsoon.
For scale, the nearest match in capacity is Legrand – Nashik (1,300 kWp, Maharashtra). Baramati Cattlefeeds – Shrirampur (729 kWp, Maharashtra) was also commissioned in Aug 2025. In Gujarat, in order of commissioning, Terex – Gujarat comes before it and West Coast – Surat, 577 kWp after.
More on the area: Gujarat. See it in the projects index.
Engineering
How a 1,300 kWp plant is put together
Metal sheet is a light roof, and a 1,300 kWp array adds weight and wind load to purlins that were sized for the sheet alone. On a roof like this one in Sarigam, a structural engineer confirms the roof can take the load, and the structure is designed for the wind speed under IS 875.
Before modules go on a sheet roof like the one at Shrotra Enterprises – Sarigam, the roof assessment covers sheet age and corrosion and any turbo ventilators or skylights, and a structural engineer confirms the purlins. A leaking bay is re-sheeted first, because lifting modules off a roof later costs more than doing the job beforehand.
A plant in Sarigam is only as good as its upkeep: inspections of connectors and inverters, cleaning that follows the local dust, and Asset Connect alerts on a string that has gone quiet.
Finance model
Who owns the plant, and who runs it
Under CAPEX the owner buys the plant outright and controls it for its whole life. That suits a company with capital to deploy and a long horizon at the site, which describes the client at the Shrotra Enterprises plant since Aug 2025.
We design, procure, build and commission a CAPEX plant, then hand it over. A 1-year defect liability period covers the entire installation, we handle manufacturer warranty claims, and the owner can sign an O&M contract of up to 25 years.
Sarigam
Sarigam and the packaging and printing sector
- Solar resource here
- 1,930 kWh/m² a yearAbout 1,614 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Sarigam; a roof plant at roof tilt differs.
- Capacity range
- 1,000 kWp and above1,300 kWp here. 19 plants on our list are in this range.
- Type of installation
- Metal sheet roofThe most common factory roof.
- Finance option
- CAPEXThe factory owns the plant from day one.
We list 2 plants in Sarigam, and this Sarigam plant is one of them. Between them they cover packaging and printing; polymer.
In Gujarat the list shows 12 projects in 7 towns. Named sectors include polymer; electrical and electronics; FMCG; packaging and printing.
Printing presses and converting lines draw steady power through the day shift, so output from a roof plant is used on site.
Humidity and temperature control for paper and film add to the daytime load, which a plant can cover in part.
Sector page: Packaging & printing solar. Rules for Gujarat: solar policy.
Projects
More plants near Sarigam
Also in Sarigam
- Arihant Gold Plast – Sarigam274 kWp · Metal sheet roof · Sep 2022
Elsewhere in Gujarat
- MYK Laticrete – Vadodara450 kWp · Metal sheet roof · Sep 2026
- Zeeta Electrical – Sanand519 kWp · Metal sheet roof · Aug 2026
- West Coast – Surat, 162 kWpMetal sheet roof · Jun 2026
- Terex – Gujarat352 kWp · Metal sheet roof · Mar 2025
Other plants on metal sheet roofs
- Pidilite – Baddi, 97 kWpMetal sheet roof · Dec 2025
- NDR Warehousing – Pune100 kWp · Metal sheet roof · Dec 2025
- Blink Infra – Selaqui332 kWp · Metal sheet roof · Dec 2025
- Marico – Jalgaon517 kWp · Metal sheet roof · Dec 2025
Common questions
The Shrotra Enterprises – Sarigam plant: questions and answers
What does 1,300 kWp mean for the plant?
Two figures describe the Shrotra Enterprises plant: 1,300 kWp on the module side and 1,000 kW (AC) on the inverter side. That is 30% more module capacity than inverter capacity (ratio 1.30), a normal design choice.
What roof is this Sarigam plant built on?
It is on metal sheet. The mounting follows OEM installation guidelines, and the structure is designed for the wind speed under IS 875.
Do you build plants in Gujarat?
Yes. 2 plants are listed for Sarigam, among 12 in Gujarat. The free 7-day feasibility study needs only your town and a typical monthly bill.
Guides and glossary
Guides and terms behind a 1,300 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Performance ratio (PR): how to judge a plant after commissioningRead the guide
Terms used on this page
Free feasibility study
Find out what your sheds can carry
Send your Gujarat town and monthly bill. An engineer replies within 48 hours, and the 7-day study is free.