Project · Maharashtra
Ronch Polymer – Pune: 332 kWp metal sheet rooftop solar in Maharashtra
Ronch Polymer bought the plant under CAPEX and owns it. The plant has supplied the site since Jan 2022. It is one of 4 Ronch Polymer plants on our project list.

- Capacity
- 332 kWp
- Installation
- Metal sheet roof
- Location
- Pune, Maharashtra
- Finance model
- CAPEX
Size, roof and finance model
- Client
- Ronch Polymer
- Industry
- Polymer
- Capacity
- 332 kWp (DC), with 240 kW (AC) of inverters
- Service
- EPC + O&M
- Commissioned
- Jan 2022
- Status
- Operational. Built and maintained by Adhvanik Energy; owned by the client.
A 332 kWp plant sits in the middle of the range we list: several inverters, on one site's roofs. 240 kW of inverters serve 332 kWp of modules: a DC/AC ratio of 1.38.
Commissioned in Jan 2022, the plant has several seasons of data. The question now is whether performance ratio has held steady. Jan 2022 fell in the low-sun winter months.
The plant closest to it in size on our list is FDC – Baddi (332 kWp, Himachal Pradesh). Jan 2022 also saw Ronch Polymer – Pune (196 kWp) commissioned. Of the Maharashtra plants on our list, Apex Knives – Nagpur was commissioned just before it and Ronch Polymer – Pune, 196 kWp just after.
Solar in the area: Maharashtra · Pune and its MIDC estates. Find this plant in the projects index.
On site
5 photos and a video clip from the plant. Select one to enlarge.
Engineering
The engineering behind a plant like Ronch Polymer – Pune
The Ronch Polymer plant is one of the metal sheet roof plants on our list. On a shed in Maharashtra, the mounting is chosen for the sheet profile and designed to comply with OEM installation guidelines.
On a long shed, a short, tidy cable route on trays, from array to inverters to LT panel, saves losses and maintenance time over the life of the plant.
Asset Connect keeps generation, irradiance and alerts in one place, and a drop in performance ratio is the first sign that a string, an inverter or the module surface needs attention.
Finance model
How the plant is paid for
The CAPEX route puts ownership with the client from the day of commissioning in Jan 2022. The plant is the owner's asset, and the owner decides how it is maintained and for how long.
A finance head weighing CAPEX against a PPA asks how much capital to commit, how long the plant will run and who will look after it.
Pune
Where Ronch Polymer – Pune sits on our list
- Solar resource here
- 1,920 kWh/m² a yearAbout 1,590 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Pune; a roof plant at roof tilt differs.
- Capacity range
- 250 to 500 kWp332 kWp here. 36 plants on our list are in this range.
- Type of installation
- Metal sheet roofThe most common factory roof.
- Finance option
- CAPEXThe factory owns the plant from day one.
Pune is a repeat location on the list, with 12 plants listed. Sectors named there: automotive; electrical and electronics; polymer; chemicals; steel and metals.
Pune is covered on the page for Pune and its MIDC estates, which lists 12 plants.
Across Maharashtra our list holds 44 plants in 17 towns, commissioned between 2020 and 2026.
Polymer processing is power-hungry and often continuous, so much of what a plant generates is used on site.
Polymer works often occupy long sheds, which suit straight rows and simple cable routes.
Sector page: Plastics & polymers solar. Rules for Maharashtra: solar policy.
Projects
Other plants on the list
Also in Pune
- UCC – Pune, 310 kWpMetal sheet roof · Jun 2021
- MTC – Pune270 kWp · Metal sheet roof · May 2021
- Mitsubishi Electric – Pune1,000 kWp · Metal sheet roof · Feb 2026
- NDR Warehousing – Pune100 kWp · Metal sheet roof · Dec 2025
Elsewhere in Maharashtra
- Exotic Fruits – Nashik1,332 kWp · Metal sheet roof · Jul 2026
- Baramati Cattlefeeds – Baramati771 kWp · Metal sheet roof · Jul 2026
- FUSO Glass – Murbad926 kWp · Metal sheet roof · Jul 2026
- Ozpure – Maharashtra867 kWp · Metal sheet roof · Jul 2026
Other plants on metal sheet roofs
- United Genetics India – Aurangabad133 kWp · Metal sheet roof · May 2026
- DP Cocoa – Varadaiahpalem759 kWp · Metal sheet roof · May 2026
- West Coast – Surat, 577 kWpMetal sheet roof · May 2026
- Blink Infra – Gaddipur250 kWp · Metal sheet roof · May 2026
Common questions
Questions about the plant
What is the commissioning date of the Ronch Polymer – Pune plant?
This Pune plant was commissioned in Jan 2022 and has supplied the site since then. That history is the first thing an O&M review reads.
Who maintains the plant?
Under CAPEX the client owns the Ronch Polymer plant. Adhvanik Energy built it, and our O&M team handles the day-to-day upkeep.
Can the Ronch Polymer – Pune design be repeated at my site?
It depends on the roof or land, the load and the connection. The free 7-day feasibility study includes a roof feasibility check, the area available for installation and a financial ROI sheet for your site.
Guides and glossary
Guides and terms behind a 332 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Behind-the-meter or net metering: which suits your site?Read the guide
Terms used on this page
Free feasibility study
Want a 332 kWp plant on your own site?
A 332 kWp plant is one data point. The free 7-day study gives you the numbers for your own site.