Project · Gujarat

West Coast – Surat: 577 kWp metal sheet rooftop solar in Gujarat

Generating since May 2026. West Coast bought the plant under CAPEX and owns it. It is one of 2 West Coast plants on our project list.

Capacity
577 kWp
Installation
Metal sheet roof
Location
Surat, Gujarat
Finance model
CAPEX

This plant at a glance

Client
West Coast
Capacity
577 kWp (DC), with 475 kW (AC) of inverters
Service
EPC + O&M
Commissioned
May 2026
Status
Operational. Built and maintained by Adhvanik Energy; owned by the client.

At 577 kWp, a plant is generally built from blocks, each with its own inverter, so a fault stays local. The array is 21% larger than the inverters, a DC/AC ratio of 1.21.

The plant has been running only since May 2026. The early question is whether output matches the design. May 2026 put its first months in the hot, dusty season.

For scale, the nearest match in capacity is Baramati Cattlefeeds – Shrirampur (578 kWp, Maharashtra). DP Chocolates – Varadaiahpalem (490 kWp, Andhra Pradesh) and Legrand – Nashik (1,300 kWp, Maharashtra) were also commissioned in May 2026. In Gujarat, in order of commissioning, Shrotra Enterprises – Sarigam comes before it and West Coast – Surat, 162 kWp after.

Engineering

The engineering behind a plant like West Coast – Surat

Putting 577 kWp on sheet means respecting a roof built to keep rain out and carry little else. The rails spread the array's weight across several purlins, and the design is checked against wind uplift for the site.

Edge protection, lifelines and fixed walkways are part of the design, because crews work on a surface not built for foot traffic. The same arrangements serve the cleaning team for as long as a 577 kWp plant runs.

After commissioning, Asset Connect logs output and alerts, and a monthly report an engineer signs sets measured performance ratio against the design.

Finance model

Who owns the plant, and who runs it

At the West Coast plant the client carried the capital cost of the 577 kWp plant, which makes it a CAPEX project. The generation is the client's from the first unit, offsetting what the site would buy from its distribution company.

A finance head weighing CAPEX against a PPA asks how much capital to commit, how long the plant will run and who will look after it.

Surat

The area around West Coast – Surat

Solar resource here
1,948 kWh/m² a yearAbout 1,633 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Surat; a roof plant at roof tilt differs.
Capacity range
500 to 1,000 kWp577 kWp here. 38 plants on our list are in this range.
Type of installation
Metal sheet roofThe most common factory roof.
Finance option
CAPEXThe factory owns the plant from day one.

Surat is a repeat location on the list, with 2 plants listed.

Surat is covered on the page for Surat and Palsana, which lists 5 plants.

In Gujarat the list shows 12 projects in 7 towns. Named sectors include polymer; electrical and electronics; FMCG; packaging and printing.

Projects

Related plants

Also in Surat

Elsewhere in Gujarat

Other plants on metal sheet roofs

Common questions

The West Coast – Surat plant: questions and answers

How big is the West Coast – Surat plant?

This Surat plant has 577 kWp of modules (DC) feeding 475 kW of inverters (AC). Modules are quoted in kWp and inverters in kW. That is 21% more module capacity than inverter capacity (ratio 1.21), a normal design choice.

What roof is the plant built on?

The list records a metal sheet roof. On sheet the structure is fixed through the sheet or, for a zero-leakage roof, held by clamps or adhesive, and it is designed for the wind speed under IS 875.

Do you build plants in Gujarat?

Yes. 2 plants are listed for Surat, among 12 in Gujarat. The free 7-day feasibility study needs only your town and a typical monthly bill.

Free feasibility study

Plan a plant for your own Gujarat site

A 577 kWp plant is one data point. The free 7-day study gives you the numbers for your own site.

Call us+91 22 4618 3484Get a free feasibility study