Project · Maharashtra

Apex Knives – Nagpur: 200 kWp metal sheet rooftop solar in Maharashtra

Apex Knives bought the plant under CAPEX and owns it. The plant has supplied the site since Dec 2021.

200 kWp metal sheet rooftop plant at Apex Knives in Nagpur, Maharashtra
Capacity
200 kWp
Installation
Metal sheet roof
Location
Nagpur, Maharashtra
Finance model
CAPEX

This plant at a glance

Client
Apex Knives
Capacity
200 kWp (DC), with 150 kW (AC) of inverters
Service
EPC + O&M
Commissioned
Dec 2021
Status
Operational. Built and maintained by Adhvanik Energy; owned by the client.

The Apex Knives plant is a small plant by the standard of the list: 200 kWp, one roof or one block. Its 200 kWp of modules feed 150 kW of inverters, a DC/AC ratio of 1.33.

Commissioned in Dec 2021, the plant has several seasons of data. The question now is whether performance ratio has held steady. Dec 2021 falls in the short-day season.

For scale, the nearest match in capacity is Plastiblends – Daman (200 kWp, Dadra and Nagar Haveli and Daman and Diu). Of the Maharashtra plants on our list, UCC – Pune, 310 kWp was commissioned just before it and Ronch Polymer – Pune, 332 kWp just after.

On site

4 photos and a video clip from the plant. Select one to enlarge.

Engineering

The engineering behind a plant like Apex Knives – Nagpur

For the metal sheet roof at the plant, the starting point is the sheet itself: its make, profile, thickness and age. Those four facts tell the engineer whether clamps or adhesive fit, and how many years of life the roof has left under the array.

Walkways and safety lines matter more on sheet than on concrete, since a sheet that was never meant for foot traffic can crack underfoot. A 200 kWp array is laid out with fixed walkways so cleaning crews and O&M engineers stay on structure.

After commissioning, Asset Connect logs output and alerts, and a monthly report an engineer signs sets measured performance ratio against the design.

Finance model

Who owns the plant, and who runs it

This Nagpur plant was financed as CAPEX: the client paid for the plant and owns it from day one. Every unit it generates replaces a unit bought from the grid, and the saving is the client's.

A finance head weighing CAPEX against a PPA asks how much capital to commit, how long the plant will run and who will look after it.

Nagpur

The area around Apex Knives – Nagpur

Solar resource here
1,874 kWh/m² a yearAbout 1,567 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Nagpur; a roof plant at roof tilt differs.
Capacity range
Under 250 kWp200 kWp here. 33 plants on our list are in this range.
Type of installation
Metal sheet roofThe most common factory roof.
Finance option
CAPEXThe factory owns the plant from day one.

Nagpur is a repeat location on the list, with 3 plants listed. Between them they cover agro; electrical and electronics.

The Nagpur area page lists 3 plants, with a link to each.

Maharashtra has 44 projects on the list, across 17 towns. By roof, 40 on metal sheet roofs, 1 on Carport, 1 on Carport + RCC, 1 on ground mount and 1 on RCC.

Projects

Other plants on the list

Also in Nagpur

Elsewhere in Maharashtra

Other plants on metal sheet roofs

Common questions

What people ask about this plant

When was the plant commissioned?

Our list records Dec 2021. Module degradation and wear on inverters and cables now show in the record.

Who maintains this Nagpur plant?

The client owns it, because the plant was financed as CAPEX. Adhvanik Energy built the plant and maintains it under an O&M contract.

Could a plant like the Apex Knives plant fit my factory?

Not by default. Each site has its own roof, shade and load. The free 7-day feasibility study covers roof feasibility, a policy check for your state and a budgetary quote.

Free feasibility study

Want a 200 kWp plant on your own site?

A 200 kWp plant is one data point. The free 7-day study gives you the numbers for your own site.

Call us+91 22 4618 3484Get a free feasibility study