Project · Maharashtra
Apex Knives – Nagpur: 200 kWp metal sheet rooftop solar in Maharashtra
Apex Knives bought the plant under CAPEX and owns it. The plant has supplied the site since Dec 2021.

- Capacity
- 200 kWp
- Installation
- Metal sheet roof
- Location
- Nagpur, Maharashtra
- Finance model
- CAPEX
This plant at a glance
- Client
- Apex Knives
- Capacity
- 200 kWp (DC), with 150 kW (AC) of inverters
- Service
- EPC + O&M
- Commissioned
- Dec 2021
- Status
- Operational. Built and maintained by Adhvanik Energy; owned by the client.
The Apex Knives plant is a small plant by the standard of the list: 200 kWp, one roof or one block. Its 200 kWp of modules feed 150 kW of inverters, a DC/AC ratio of 1.33.
Commissioned in Dec 2021, the plant has several seasons of data. The question now is whether performance ratio has held steady. Dec 2021 falls in the short-day season.
For scale, the nearest match in capacity is Plastiblends – Daman (200 kWp, Dadra and Nagar Haveli and Daman and Diu). Of the Maharashtra plants on our list, UCC – Pune, 310 kWp was commissioned just before it and Ronch Polymer – Pune, 332 kWp just after.
Solar in the area: Maharashtra · Nagpur. Find this plant in the filterable project list.
On site
4 photos and a video clip from the plant. Select one to enlarge.
Engineering
The engineering behind a plant like Apex Knives – Nagpur
For the metal sheet roof at the plant, the starting point is the sheet itself: its make, profile, thickness and age. Those four facts tell the engineer whether clamps or adhesive fit, and how many years of life the roof has left under the array.
Walkways and safety lines matter more on sheet than on concrete, since a sheet that was never meant for foot traffic can crack underfoot. A 200 kWp array is laid out with fixed walkways so cleaning crews and O&M engineers stay on structure.
After commissioning, Asset Connect logs output and alerts, and a monthly report an engineer signs sets measured performance ratio against the design.
Finance model
Who owns the plant, and who runs it
This Nagpur plant was financed as CAPEX: the client paid for the plant and owns it from day one. Every unit it generates replaces a unit bought from the grid, and the saving is the client's.
A finance head weighing CAPEX against a PPA asks how much capital to commit, how long the plant will run and who will look after it.
Nagpur
The area around Apex Knives – Nagpur
- Solar resource here
- 1,874 kWh/m² a yearAbout 1,567 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Nagpur; a roof plant at roof tilt differs.
- Capacity range
- Under 250 kWp200 kWp here. 33 plants on our list are in this range.
- Type of installation
- Metal sheet roofThe most common factory roof.
- Finance option
- CAPEXThe factory owns the plant from day one.
Nagpur is a repeat location on the list, with 3 plants listed. Between them they cover agro; electrical and electronics.
The Nagpur area page lists 3 plants, with a link to each.
Maharashtra has 44 projects on the list, across 17 towns. By roof, 40 on metal sheet roofs, 1 on Carport, 1 on Carport + RCC, 1 on ground mount and 1 on RCC.
Sector pages: industries we work with. Rules for Maharashtra: solar policy.
Projects
Other plants on the list
Also in Nagpur
- Horiba – Nagpur721 kWp · Carport · Sep 2024
- Lemken – Nagpur477 kWp · Metal sheet roof · Jul 2022
Elsewhere in Maharashtra
- Exotic Fruits – Nashik1,332 kWp · Metal sheet roof · Jul 2026
- Baramati Cattlefeeds – Baramati771 kWp · Metal sheet roof · Jul 2026
- FUSO Glass – Murbad926 kWp · Metal sheet roof · Jul 2026
- Ozpure – Maharashtra867 kWp · Metal sheet roof · Jul 2026
Other plants on metal sheet roofs
- Pidilite – Baddi, 227 kWpMetal sheet roof · Dec 2025
- Pidilite – Baddi, 97 kWpMetal sheet roof · Dec 2025
- NDR Warehousing – Pune100 kWp · Metal sheet roof · Dec 2025
- Blink Infra – Selaqui332 kWp · Metal sheet roof · Dec 2025
Common questions
What people ask about this plant
When was the plant commissioned?
Our list records Dec 2021. Module degradation and wear on inverters and cables now show in the record.
Who maintains this Nagpur plant?
The client owns it, because the plant was financed as CAPEX. Adhvanik Energy built the plant and maintains it under an O&M contract.
Could a plant like the Apex Knives plant fit my factory?
Not by default. Each site has its own roof, shade and load. The free 7-day feasibility study covers roof feasibility, a policy check for your state and a budgetary quote.
Guides and glossary
Guides and terms behind a 200 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Behind-the-meter or net metering: which suits your site?Read the guide
Terms used on this page
Free feasibility study
Want a 200 kWp plant on your own site?
A 200 kWp plant is one data point. The free 7-day study gives you the numbers for your own site.




