Project · Himachal Pradesh
Pidilite – Kala Amb: 312 kWp metal sheet rooftop solar in Himachal Pradesh
Generating since Jan 2026. Pidilite bought the plant under CAPEX and owns it. It is one of 5 Pidilite plants on our project list.
- Capacity
- 312 kWp
- Installation
- Metal sheet roof
- Location
- Kala Amb, Himachal Pradesh
- Finance model
- CAPEX
Plant details
- Client
- Pidilite
- Industry
- Chemicals
- Capacity
- 312 kWp (DC), with 250 kW (AC) of inverters
- Service
- EPC + O&M
- Commissioned
- Jan 2026
- Status
- Operational. Built and maintained by Adhvanik Energy; owned by the client.
At 312 kWp, the plant covers a sizeable share of a factory roof, usually split across a few inverters. Its 312 kWp of modules feed 250 kW of inverters, a DC/AC ratio of 1.25.
With a commissioning month of Jan 2026, the plant has a year or more of readings, enough to compare each month with the same month a year earlier. Jan 2026 falls in the short-day season.
The plant closest to it in size on our list is UCC – Pune (310 kWp, Maharashtra). Pidilite – Kala Amb (205 kWp) and Britannia – Guwahati (1,700 kWp, Assam) were also commissioned in Jan 2026. Its nearest neighbour in Himachal Pradesh, in order of commissioning, is Pidilite – Kala Amb, 537 kWp.
Solar in the area: Himachal Pradesh · Baddi and Kala Amb. Find this plant in the projects index.
Engineering
What a metal sheet rooftop plant involves
A shed roof in Kala Amb gives a 312 kWp plant plenty of room, but it asks more of the structure than a slab does. Sheet profile, purlin spacing and design wind speed decide how the rails are fixed, and the fixing has to leave the sheet watertight.
Before modules go on a sheet roof like the one at Pidilite – Kala Amb, the roof assessment covers sheet age and corrosion and any turbo ventilators or skylights, and a structural engineer confirms the purlins. A leaking bay is re-sheeted first, because lifting modules off a roof later costs more than doing the job beforehand.
Asset Connect keeps generation, irradiance and alerts in one place, and a drop in performance ratio is the first sign that a string, an inverter or the module surface needs attention.
Finance model
What CAPEX means here
The CAPEX route puts ownership with the client from the day of commissioning in Jan 2026. The plant is the owner's asset, and the owner decides how it is maintained and for how long.
Compared with a PPA, CAPEX needs money up front and leaves the plant with the owner. Ask for both prices on the same roof.
Kala Amb
Where Pidilite – Kala Amb sits on our list
- Solar resource here
- 1,752 kWh/m² a yearAbout 1,531 kWh per kWp a year for a standard tilted system; January is the weakest month. Global Solar Atlas estimate for Kala Amb; a roof plant at roof tilt differs.
- Capacity range
- 250 to 500 kWp312 kWp here. 36 plants on our list are in this range.
- Type of installation
- Metal sheet roofThe most common factory roof.
- Finance option
- CAPEXThe factory owns the plant from day one.
Kala Amb is a repeat location on the list, with 3 plants listed. Its one named sector is chemicals.
Kala Amb is covered on the page for Baddi and Kala Amb, which lists 6 plants.
Himachal Pradesh has 7 projects on the list, across 3 towns. By roof, 5 on metal sheet roofs and 2 on RCC.
Chemical works run reactors, pumps and utilities through long hours, so daytime demand is high and steady.
The roof assessment checks roof exposure to process emissions and the position of vents, which affect module cleaning and long-term soiling.
Sector pages: industries we work with. Rules for Himachal Pradesh: solar policy.
Projects
Related plants
Also in Kala Amb
- Pidilite – Kala Amb, 537 kWpMetal sheet roof · Jan 2026
- Pidilite – Kala Amb, 205 kWpMetal sheet roof · Jan 2026
Elsewhere in Himachal Pradesh
- Pidilite – Baddi, 227 kWpMetal sheet roof · Dec 2025
- HUL – Nalagarh46 kWp · RCC · Jul 2023
Other plants on metal sheet roofs
- Britannia – Guwahati1,700 kWp · Metal sheet roof · Jan 2026
- Pidilite – Baddi, 97 kWpMetal sheet roof · Dec 2025
- NDR Warehousing – Pune100 kWp · Metal sheet roof · Dec 2025
- Blink Infra – Selaqui332 kWp · Metal sheet roof · Dec 2025
Common questions
The Pidilite – Kala Amb plant: questions and answers
How big is the Pidilite – Kala Amb plant?
The plant carries 312 kWp of modules and 250 kW of inverter capacity. kWp is the module rating at test conditions, and kW (AC) is what the inverters can deliver. That is 25% more module capacity than inverter capacity (ratio 1.25), a normal design choice.
What roof is the Pidilite plant built on?
It is on metal sheet. The mounting follows OEM installation guidelines, and the structure is designed for the wind speed under IS 875.
Does Adhvanik Energy work near Kala Amb?
Yes. 3 plants are listed for Kala Amb, among 7 in Himachal Pradesh. The free 7-day feasibility study needs only your town and a typical monthly bill.
Guides and glossary
Guides and terms behind a 312 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Behind-the-meter or net metering: which suits your site?Read the guide
Terms used on this page
Free feasibility study
Plan a plant for your own Himachal Pradesh site
The free 7-day study gives a site in Kala Amb an ROI sheet, a policy check, roof feasibility and a budgetary quote. Expect an engineer within 48 hours.