Himachal Pradesh
Industrial rooftop solar in Baddi and Kala Amb
6 plants in two foothill industrial towns: chemicals on RCC roofs, and one pharma plant.
- projects listed here in Baddi and Kala Amb
- 6
- places with a plant
- 2
- industries named
- 2
- most recent commissioning
- Jan 2026
The industrial belt
Baddi in Solan, Kala Amb in Sirmaur
Baddi is an industrial town in Solan district, part of the Baddi–Barotiwala–Nalagarh (BBN) industrial area near the borders with Punjab and Haryana. Its industry is mostly pharmaceuticals, packaging and engineering. Kala Amb is in Sirmaur district.
Our six plants split evenly between the two towns, and the chemicals plants among them were commissioned within three weeks of one another.
Sources: Baddi (opens in a new tab), Kala Amb (opens in a new tab). As of Nov 2026.
Our plants here
RCC roofs in Baddi and Kala Amb
The 6 plants listed here were commissioned between 2021 and 2026. Named sectors: chemicals and pharma. By roof: 5 on metal sheet roofs and 1 on RCC. Of the plants we built, 5 were CAPEX and 1 was PPA / OPEX.
Where a roof type is recorded it is RCC, which changes the engineering. The questions are the structure's load margin, how penetrations are sealed and where the array's weight is carried.
Projects
Plants listed in Baddi and Kala Amb
Newest first.
- 312 kWp
Pidilite – Kala Amb, 312 kWp
Himachal Pradesh
Commissioned Jan 2026
- 537 kWp
Pidilite – Kala Amb, 537 kWp
Himachal Pradesh
Commissioned Jan 2026
- 205 kWp
Pidilite – Kala Amb, 205 kWp
Himachal Pradesh
Commissioned Jan 2026
- 227 kWp
Pidilite – Baddi, 227 kWp
Himachal Pradesh
Commissioned Dec 2025
- 97 kWp
Pidilite – Baddi, 97 kWp
Himachal Pradesh
Commissioned Dec 2025
332 kWp
FDC – Baddi
Himachal Pradesh
Commissioned Sep 2021
What to check first
Checks for an RCC slab in Baddi or Kala Amb
- 01
Structural audit
Ask for a load check on the RCC slab before ballast or anchor design is fixed.
RCC roof solar - 02
Waterproofing
Ask how each penetration is sealed and who inspects it over the plant's life.
Guide: choosing an installation type - 03
Rules for your connection
Read the current Himachal Pradesh rules on metering and surplus power before you size.
Himachal Pradesh solar policy
Guides and glossary
Guides and terms for Baddi and Kala Amb factories
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Performance ratio (PR): how to judge a plant after commissioningRead the guide
Terms used on this page
Common questions
What Baddi and Kala Amb factories ask before they buy
Speak with an industrial solar engineerDo you build in Barotiwala and Nalagarh?
Our plants are in Baddi and Kala Amb. For Barotiwala or Nalagarh, tell us your town and average monthly bill; the free 7-day feasibility study starts from those.
Why are the plants here on RCC roofs?
Where a roof type is recorded here it is RCC, which changes the engineering from sheet roofs: structure, waterproofing and ballast come first.
Which finance models were used?
Of the plants we built, 5 were CAPEX and 1 was PPA / OPEX. The financing pages compare the two.
What should a Baddi chemicals plant check before putting solar on its slab?
Start with the slab's load margin and the drainage outlets, then ask how the array is held down and how each fixing is sealed. Also check whether process exhausts or stacks near the roof will mark or shade the modules.
Is there an Adhvanik engineer near my factory in Baddi and Kala Amb?
Our team includes people based in Baddi. Send your town and an average monthly bill, and an engineer replies within 48 hours; the free 7-day feasibility study starts from those two details.
Free feasibility study
Baddi or Kala Amb RCC roof? Ask for the load check
The feasibility study is free, takes 7 days and carries no commitment. An engineer replies within 48 hours.
What the study covers
- Financial ROI sheet based on a preliminary design
- Policy check for your state and connection
- Roof feasibility and the area available for installation