Project · Himachal Pradesh

Pidilite – Baddi: 227 kWp metal sheet rooftop solar in Himachal Pradesh

Pidilite bought the plant under CAPEX and owns it. The plant has supplied the site since Dec 2025. It is one of 5 Pidilite plants on our project list.

Capacity
227 kWp
Installation
Metal sheet roof
Location
Baddi, Himachal Pradesh
Finance model
CAPEX

Size, roof and finance model

Client
Pidilite
Industry
Chemicals
Capacity
227 kWp (DC), with 175 kW (AC) of inverters
Service
EPC + O&M
Commissioned
Dec 2025
Status
Operational. Built and maintained by Adhvanik Energy; owned by the client.

A 227 kWp plant sits in the middle of the range we list: several inverters, on one site's roofs. The array is 30% larger than the inverters, a DC/AC ratio of 1.30.

The plant began supplying the site in Dec 2025. With a full year on record, a month that falls short of the same month last year stands out. Its first readings, in Dec 2025, met the longest winter shadows.

For scale, the nearest match in capacity is Plastiblends – Palsana (223 kWp, Gujarat). Dec 2025 also saw Marico – Jalgaon (517 kWp, Maharashtra) and Pidilite – Baddi (97 kWp) commissioned. Of the Himachal Pradesh plants on our list, Pidilite – Baddi, 97 kWp was commissioned just before it and Pidilite – Kala Amb, 205 kWp just after.

Engineering

The engineering behind a plant like Pidilite – Baddi

For the metal sheet roof at Pidilite – Baddi, the starting point is the sheet itself: its make, profile, thickness and age. Those four facts tell the engineer whether clamps or adhesive fit, and how many years of life the roof has left under the array.

Walkways and safety lines matter more on sheet than on concrete, since a sheet that was never meant for foot traffic can crack underfoot. A 227 kWp array is laid out with fixed walkways so cleaning crews and O&M engineers stay on structure.

Irradiance sensors give Asset Connect the sunshine a 227 kWp plant should have converted, so a shortfall can be told apart from a cloudy week.

Finance model

Who owns the plant, and who runs it

At the Pidilite plant the client carried the capital cost of the 227 kWp plant, which makes it a CAPEX project. The generation is the client's from the first unit, offsetting what the site would buy from its distribution company.

CAPEX suits a company that plans to stay at a site for the life of the plant. Our financing page compares it with PPA / OPEX.

Baddi

Baddi and the chemicals sector

Solar resource here
1,735 kWh/m² a yearAbout 1,520 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Baddi; a roof plant at roof tilt differs.
Capacity range
Under 250 kWp227 kWp here. 33 plants on our list are in this range.
Type of installation
Metal sheet roofThe most common factory roof.
Finance option
CAPEXThe factory owns the plant from day one.

We list 3 plants in Baddi, and this Baddi plant is one of them. The named sectors are chemicals and pharma.

Baddi is covered on the page for Baddi and Kala Amb, which lists 6 plants.

Across Himachal Pradesh our list holds 7 plants in 3 towns, commissioned between 2021 and 2026.

Process plants in chemicals draw power around the clock, and the daytime share is what a roof plant can serve.

RCC blocks and sheds both appear in chemical works, and the plant is placed where the roof is clear of vents and process stacks.

Projects

Other plants on the list

Also in Baddi

Elsewhere in Himachal Pradesh

Other plants on metal sheet roofs

Common questions

What people ask about this plant

How long has the plant been running?

Dec 2025. That is when the 227 kWp plant in Baddi began supplying the site, and the generation record runs from then.

Who looks after the 227 kWp plant at Baddi?

The client owns it, because this Baddi plant was financed as CAPEX. Adhvanik Energy built the plant and maintains it under an O&M contract.

Can the Pidilite – Baddi design be repeated at my site?

It depends on the roof or land, the load and the connection. The free 7-day feasibility study includes a roof feasibility check, the area available for installation and a financial ROI sheet for your site.

Free feasibility study

Want a 227 kWp plant on your own site?

Tell us the roof type and last year's bills. An engineer gets back within 48 hours. The 7-day feasibility study costs nothing.

Call us+91 22 4618 3484Get a free feasibility study