Project · Maharashtra

Legrand – Sinnar: 141 kWp rooftop and carport solar in Maharashtra

Generating since May 2025. Adhvanik Energy owns and runs it, and Legrand pays for each unit the plant generates, under a PPA. It is one of 4 Legrand plants on our project list.

141 kWp rooftop and carport plant at Legrand in Sinnar, Maharashtra
Capacity
141 kWp
Installation
Carport + RCC
Location
Sinnar, Maharashtra
Finance model
PPA / OPEX

This plant at a glance

Client
Legrand
Industry
Electrical & Electronics
Capacity
141 kWp (DC), with 133 kW (AC) of inverters
Service
EPC + O&M
Commissioned
May 2025
Status
Operational. Owned and run by Adhvanik Energy.

The plant is a small plant by the standard of the list: 141 kWp, one roof or one block. 133 kW of inverters serve 141 kWp of modules: a DC/AC ratio of 1.06.

The Legrand plant began supplying the site in May 2025. With a full year on record, a month that falls short of the same month last year stands out. May 2025 put its first months in the hot, dusty season.

Closest in capacity on the list: Essgee – Mumbai (144 kWp). Zenith Irrigation – Nashik (420 kWp) and Mysore Deep Perfumery – Indore (266 kWp, Madhya Pradesh) were also commissioned in May 2025. In Maharashtra, in order of commissioning, SAPCO – Mumbai comes before it and Zenith Irrigation – Nashik after.

On site

3 photos from the plant. Select one to enlarge.

  • Solar panels on a sloped metal-sheet roof beside green trees
  • Two lines of solar panels separated by a narrow maintenance gap
  • Solar panel rows near a yellow roof-edge safety railing with open land below

Engineering

What a rooftop and carport plant involves

A carport needs its own steel and foundations, which a roof plant borrows from the building. At Legrand – Sinnar that canopy sits beside the rooftop part of the 141 kWp.

A canopy is cleaned from a small access platform, scheduled with the site's admin team so the bays below can be cleared first.

Our standard O&M scope has 24 to 26 cleaning cycles a year, more where the dust and the monsoon in Sinnar call for them, with AI-enabled checks on cleaning quality.

Finance model

What PPA / OPEX means here

This Sinnar plant is a PPA / OPEX plant. Adhvanik Energy invested in it, owns it and runs it, and the client pays for each unit it generates at the tariff in its contract, with no capital of its own.

A PPA keeps the client's capital free for the factory itself; its cost is the tariff on the units the plant generates.

Sinnar

Where Legrand – Sinnar sits on our list

Solar resource here
1,972 kWh/m² a yearAbout 1,652 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Sinnar; a roof plant at roof tilt differs.
Capacity range
Under 250 kWp141 kWp here. 33 plants on our list are in this range.
Type of installation
Carport + RCCBuilt over parking, giving shade as well as power.
Finance option
PPA / OPEXNo capital from the factory: it pays per unit generated.

Sinnar is a repeat location on the list, with 2 plants listed. Its one named sector is electrical and electronics.

Sinnar is covered on the page for Nashik and Sinnar, which lists 7 plants.

In Maharashtra the list shows 44 projects in 17 towns. Named sectors include electrical and electronics; agro; automotive; polymer.

Electrical and electronics plants combine assembly with test rooms and air conditioning, and both draw power through the working day.

Ask for the roof types of every block before sizing, since a mix of RCC and sheet changes the structure plan.

Projects

Related plants

Also in Sinnar

Elsewhere in Maharashtra

Other electrical and electronics plants

Common questions

What people ask about this plant

Is 141 kWp the module or the inverter size at the plant?

The Legrand plant has 141 kWp of modules (DC) feeding 133 kW of inverters (AC). Modules are quoted in kWp and inverters in kW. That is 6% more module capacity than inverter capacity (ratio 1.06), a normal design choice.

How is the plant at Sinnar mounted?

Part of the capacity is on a concrete roof and part forms a carport canopy over parking, which also shades the vehicles.

Do you build plants in Maharashtra?

Yes. 2 plants are listed for Sinnar, among 44 in Maharashtra. The free 7-day feasibility study needs only your town and a typical monthly bill.