Project · Gujarat
Terex – Gujarat: 352 kWp metal sheet rooftop solar
Terex bought the plant under CAPEX and owns it. The plant has supplied the site since Mar 2025.

- Capacity
- 352 kWp
- Installation
- Metal sheet roof
- Location
- Gujarat
- Finance model
- CAPEX
Size, roof and finance model
- Client
- Terex
- Capacity
- 352 kWp (DC), with 270 kW (AC) of inverters
- Service
- EPC + O&M
- Commissioned
- Mar 2025
- Status
- Operational. Built and maintained by Adhvanik Energy; owned by the client.
352 kWp is mid-sized for the list, enough to span a production hall or two. 270 kW of inverters serve 352 kWp of modules: a DC/AC ratio of 1.30.
The Terex plant began supplying the site in Mar 2025. With a full year on record, a month that falls short of the same month last year stands out. Its first readings, in Mar 2025, came in the dusty summer months.
The plant closest to it in size on our list is Hexagon Prints – Palghar (350 kWp, Maharashtra). Of the Gujarat plants on our list, HUL – Kandla was commissioned just before it and Shrotra Enterprises – Sarigam just after.
More on the area: Gujarat. It is also listed in the full project list.
On site
5 photos and a video clip from the plant. Select one to enlarge.
Engineering
How a 352 kWp plant is put together
For the metal sheet roof at the plant, the starting point is the sheet itself: its make, profile, thickness and age. Those four facts tell the engineer whether clamps or adhesive fit, and how many years of life the roof has left under the array.
Walkways and safety lines matter more on sheet than on concrete, since a sheet that was never meant for foot traffic can crack underfoot. A 352 kWp array is laid out with fixed walkways so cleaning crews and O&M engineers stay on structure.
Our standard O&M scope has 24 to 26 cleaning cycles a year, more where the dust and the monsoon in Gujarat call for them, with AI-enabled checks on cleaning quality.
Finance model
How the plant is paid for
At this Gujarat plant the client carried the capital cost of the 352 kWp plant, which makes it a CAPEX project. The generation is the client's from the first unit, offsetting what the site would buy from its distribution company.
Compared with a PPA, CAPEX needs money up front and leaves the plant with the owner. Ask for both prices on the same roof.
Gujarat
Where Terex – Gujarat sits on our list
- Solar resource here
- 2,013 kWh/m² a yearAbout 1,708 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Gujarat; a roof plant at roof tilt differs.
- Capacity range
- 250 to 500 kWp352 kWp here. 36 plants on our list are in this range.
- Type of installation
- Metal sheet roofThe most common factory roof.
- Finance option
- CAPEXThe factory owns the plant from day one.
Our list records Terex – Gujarat at state level only, so no town is shown.
Gujarat has 12 projects on the list, across 7 towns. By roof, 11 on metal sheet roofs and 1 on RCC.
Sector pages: industries we work with. Rules for Gujarat: solar policy.
Projects
Related plants
Elsewhere in Gujarat
- MYK Laticrete – Vadodara450 kWp · Metal sheet roof · Sep 2026
- Zeeta Electrical – Sanand519 kWp · Metal sheet roof · Aug 2026
- West Coast – Surat, 162 kWpMetal sheet roof · Jun 2026
- Shrotra Enterprises – Sarigam1,300 kWp · Metal sheet roof · Aug 2025
Other plants on metal sheet roofs
- Ozpure – Maharashtra867 kWp · Metal sheet roof · Jul 2026
- Baramati Cattlefeeds – Shrirampur, 578 kWpMetal sheet roof · Jul 2026
- Samruddhi Industries – Samadhan Industries, Maharashtra250 kWp · Metal sheet roof · Jun 2026
- Siddhi Vinayak Flexipack – Indore515 kWp · Metal sheet roof · Jun 2026
Common questions
Questions about Terex – Gujarat
How long has the plant been running?
Mar 2025. That is when the 352 kWp plant in Gujarat began supplying the site, and the generation record runs from then.
Who looks after the 352 kWp plant at Gujarat?
Under CAPEX the client owns this Gujarat plant. Adhvanik Energy built it, and our O&M team handles the day-to-day upkeep.
How do I find out if my roof can carry 352 kWp?
It depends on the roof or land, the load and the connection. The free 7-day feasibility study includes a roof feasibility check, the area available for installation and a financial ROI sheet for your site.
Guides and glossary
Guides and terms behind a 352 kWp plant
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
- Behind-the-meter or net metering: which suits your site?Read the guide
Terms used on this page
Free feasibility study
Find out what your sheds can carry
A 352 kWp plant is one data point. The free 7-day study gives you the numbers for your own site.





