New Jack Printing – Bhiwandi: 375 kWp metal sheet rooftop solar in Maharashtra

New Jack Printing bought the plant under CAPEX and owns it. The plant has supplied the site since Jun 2026.

Capacity
375 kWp
Installation
Metal sheet roof
Location
Bhiwandi, Maharashtra
Finance model
CAPEX

Plant details

Client
New Jack Printing
Industry
Packaging & Printing
Capacity
375 kWp (DC), with 300 kW (AC) of inverters
Service
EPC + O&M
Commissioned
Jun 2026
Status
Operational. Built and maintained by Adhvanik Energy; owned by the client.

A 375 kWp plant sits in the middle of the range we list: several inverters, on one site's roofs. The array is 25% larger than the inverters, a DC/AC ratio of 1.25.

The plant in Bhiwandi started supplying the site in Jun 2026. A few months of readings will set its baseline. Jun 2026 falls in the monsoon.

For scale, the nearest match in capacity is Pearl Global – Gurugram (384 kWp, Haryana). Jun 2026 also saw Natural Living – Pithampur (500 kWp, Madhya Pradesh) and West Coast – Surat (162 kWp, Gujarat) commissioned. Of the Maharashtra plants on our list, United Genetics India – Aurangabad was commissioned just before it and Samruddhi Industries – Samadhan Industries, Maharashtra just after.

Engineering

What a metal sheet rooftop plant involves

The plant is one of the metal sheet roof plants on our list. On a shed in Maharashtra, the mounting is chosen for the sheet profile and designed to comply with OEM installation guidelines.

Shadows on a shed roof come from ridge monitors, ventilators and neighbouring buildings. The layout for a plant like the New Jack Printing plant is drawn with those in place, so no row loses output to a shadow that was visible on the first day.

Our standard O&M scope has 24 to 26 cleaning cycles a year, more where the dust and the monsoon in Bhiwandi call for them, with AI-enabled checks on cleaning quality.

Finance model

Who owns the plant, and who runs it

At this Bhiwandi plant the client carried the capital cost of the 375 kWp plant, which makes it a CAPEX project. The generation is the client's from the first unit, offsetting what the site would buy from its distribution company.

Compared with a PPA, CAPEX needs money up front and leaves the plant with the owner. Ask for both prices on the same roof.

Bhiwandi

Where New Jack Printing – Bhiwandi sits on our list

Solar resource here
1,879 kWh/m² a yearAbout 1,556 kWh per kWp a year for a standard tilted system; July is the weakest month. Global Solar Atlas estimate for Bhiwandi; a roof plant at roof tilt differs.
Capacity range
250 to 500 kWp375 kWp here. 36 plants on our list are in this range.
Type of installation
Metal sheet roofThe most common factory roof.
Finance option
CAPEXThe factory owns the plant from day one.

No other plant in Bhiwandi is on our published list yet, so the plant is the town's one record here.

Bhiwandi is covered on the page for Mumbai, Palghar, Boisar, Bhiwandi and Murbad, which lists 7 plants.

Across Maharashtra our list holds 44 plants in 17 towns, commissioned between 2020 and 2026.

Packaging works often run presses, laminators and cutters for long shifts, and that load fits solar hours.

Packaging units are commonly housed in metal sheet sheds, so the sheet condition and the purlin spacing set the design.

Projects

Other plants on the list

Elsewhere in Maharashtra

Other plants on metal sheet roofs

Common questions

Questions about New Jack Printing – Bhiwandi

How long has the New Jack Printing plant been running?

Jun 2026. That is when the 375 kWp plant in Bhiwandi began supplying the site, and the generation record runs from then.

Who looks after the 375 kWp plant at Bhiwandi?

Ownership sits with the client under CAPEX. We designed and built the plant, and our O&M team maintains it.

How do I find out if my roof can carry 375 kWp?

Not by default. Each site has its own roof, shade and load. The free 7-day feasibility study covers roof feasibility, a policy check for your state and a budgetary quote.

Free feasibility study

Plan a plant for your own Maharashtra site

The free 7-day study gives a site in Bhiwandi an ROI sheet, a policy check, roof feasibility and a budgetary quote. Expect an engineer within 48 hours.

Call us+91 22 4618 3484Get a free feasibility study