Maharashtra
Industrial rooftop solar in Nashik and Sinnar
7 plants across Nashik and Sinnar, including one extension to an earlier plant: electrical and electronics, FMCG and general industrial sites, with 3 on a PPA.
- projects listed here in Nashik and Sinnar
- 7
- places with a plant
- 2
- industries named
- 3
- most recent commissioning
- Jul 2026
The industrial belt
Sinnar and the Nashik MIDC parks
Sinnar is a city and municipal council in Nashik district, the third largest in the district after Nashik and Malegaon. MIDC's industrial parks in the Nashik area include Satpur, Ambad and Sinnar.
Our list names the town and leaves out the estate. Two Sinnar entries share a name, and one of them is labelled an extension of the earlier plant.
Sources: Sinnar (opens in a new tab), Maharashtra Industrial Development Corporation (opens in a new tab). As of Nov 2026.
Our plants here
Nashik and Sinnar plants, one of them an extension
The 7 plants listed here were commissioned between 2020 and 2026: electrical and electronics, hospitality and FMCG, plus a general industrial plant. By roof: 6 on metal sheet roofs and 1 on Carport + RCC. Among the plants we built here, 3 were CAPEX and 3 were PPA / OPEX (the model is not recorded for 1).
An extension may share a connection and monitoring with the earlier plant, so the first design question is what can be reused and what has to be separate.
Projects
Plants listed in Nashik and Sinnar
Newest first.
1,332 kWp
Exotic Fruits – Nashik
Maharashtra
Commissioned Jul 2026
- 1,300 kWp
Legrand – Nashik
Maharashtra
Commissioned May 2026
- 420 kWp
Zenith Irrigation – Nashik
Maharashtra
Commissioned May 2025
141 kWp
Legrand – Sinnar, 141 kWp
Maharashtra
Commissioned May 2025
- 508 kWp
Legrand – Sinnar, 508 kWp
Maharashtra
Commissioned Apr 2022
50 kWp
Soma Resort – Nashik, 50 kWp
Maharashtra
Commissioned Feb 2022
- 83 kWp
Soma Resort – Nashik, 83 kWp
Maharashtra
Commissioned Feb 2020
What to check first
Checks for extending a Nashik or Sinnar plant
- 01
Reuse and separation
Ask which metering, monitoring and inverter room can be shared with the existing plant.
Solar O&M and AMC - 02
Roof and mounting
Ask which mounting method keeps your roof-sheet warranty intact.
Metal sheet roof solar - 03
Rules for your connection
Ask what the state's rules currently say about surplus power on your connection.
Maharashtra solar policy
Guides and glossary
Guides and terms for Nashik and Sinnar factories
- Behind-the-meter or net metering: which suits your site?Read the guide
- CAPEX or PPA: which solar model fits your factory?Read the guide
- Metal sheet, RCC, ground mount or carport: choosing the installationRead the guide
Terms used on this page
Common questions
What Nashik and Sinnar factories ask before they buy
Speak with an industrial solar engineerDo you build in Satpur, Ambad and Sinnar MIDC?
Our plants are listed by town. If your factory is in one of those parks, tell us your town and average monthly bill; the free 7-day feasibility study starts from those.
What is different about an extension?
It may share a connection and monitoring with the first plant. Tell us the existing plant's make and capacity so the design starts from what is already there.
Which sectors are the Nashik plants in?
Electrical and electronics, hospitality and FMCG, plus plants tagged as general industrial. The projects above show each with its commissioning month.
Can a second plant be added on a PPA beside an existing one?
Yes, if the roof and the connection allow it. The Sinnar extension in our list came three years after the first plant, and both are PPA plants. Settle first how each plant's generation is metered, so each is billed on what it supplies.
Who covers Nashik and Sinnar for site visits and enquiries?
Our team includes people based in Pune and Aurangabad. Whatever your town, the first step is the same: your location and a recent electricity bill. An engineer replies within 48 hours.
Free feasibility study
Extending a Nashik or Sinnar plant? Tell us what is there
The feasibility study is free, takes 7 days and carries no commitment. An engineer replies within 48 hours.
What the study covers
- Financial ROI sheet based on a preliminary design
- Policy check for your state and connection
- Roof feasibility and the area available for installation